Loading...
2024-09-27-Point Edwards Condo Sidewalk Replacement-SIPD3240040Otto Rosenau & Associates, Inc. IN -PLACE DENSITY AND WATER CONTENT OF SOIL AND SOIL -AGGREGATE BY NUCLEAR METHOD REPORT (ASTM D6938, WSDOT T310) Report No: SIPD3240040 Client: Point Edwards Condominiums Technician: Kevin Byrne Homeowners' Association Project: Point Edwards Condo Sidewalk Job No.: 24-0623 Insp. Date: 09/27/2024 Replacement Address: 21 Pine Street, Edmonds Permit No.: BLD2024-0795 Type of Monitoring: Periodic Lab Maximum Dry Densities Testing Equipment: Corrected Uncorrected ID: J Soils Soil Description Dry Optimum ASTM Dry Optimum Oversize Wet: 2740 ID Density Moisture Method Density Moisture Rock Xi: 0.2 1658 5/8 minus D1557-C 134.9 10.7% 13.1% H2O: 759 Xi: 0.4 Percent Compaction Required: 95% BS = Backscatter DT = Direct Transmission All density values are in PCF unless noted otherwise. Test Location / Station Test Method Source Rod +/- From Finish Grade Depth of Fill Soils ID Wet Density Moisture Dry Density Max. Dry Density Compact Conforms 1 Main enterance - inbound DT 4" 8% 6" 1658 139.7 8.8% 128.4 134.9 95% Yes 2 Main enterance - outbound DT 4" 8% 6" 1658 139.6 8.4% 128.8 134.9 95% Yes 3 Bunker - center 15' N/12' E Bunker - center 15' N/15' E DT 4" 8% 6" 1658 140.3 8.7% 129.1 134.9 96% Yes 4 DT 4" 811- 6" 1658 139.3 8.3% 128.9 134.9 96% Yes Compaction Methods & Equipment: Unknown WSDOT jobs only: Did each test location represent two readings (initial & 90° reading) that were within 3 Ibs/cf of each other? If no, please see below. No WSDOT jobs only: If the two readings (initial & 900 reading) were not within 3 Ibs/cf of each other, are retests indicated above? No __W__ _m07 Comments: Concrete panel base material - main enterance and in front of bunker building. The inspector was not on site during material placement and compaction. The material is firm and stable. Copies To: ❑d Contractor d❑ Client L Engineer ❑d Building Dept ❑ Owner Architect ❑ Others Form No.: ADMIN-101-08 (Rev 08119) Technical Responsibility: Scott Hoobler, PE, Project Manager This report applies only to the items tested or reported and is the exclusive property of Otto Rosenau & Associates, Inc. Reproduction of this report except in full, without written permission from our firm is strictly prohibited. 6747 M.L. King Way S., Seattle, Washington 98118 — Phone (206) 725-4600 — Fax (206) 723-2221 Page 1 of 1