Loading...
2024-10-09 -Point Edwards Condo Sidewalk Replacement - GEO1570072OTTO ROSENAU & ASSOCIATES, INC. Geotechnical Engineering, Construction Inspection & Materials Testing GEOTECHNICAL INSPECTION REPORT Report Number: 1570072 Description: Pin Piles Project: Point Edwards Condo Sidewalk Replacement Permit Number: BLD-2024-0795 Address: 21 Pine Street, Edmonds Job Number: 24-0623 Client: Point Edwards Condominium Homeowners Client Address: 3109 Franklin Ave., E Seattle Inspector and Date Remarks Craig R. Bechtold, L.G. 10/9/2024 Arrived onsite as requested to observe and document the installation of galvanized 2-inch diameter schedule 80 pin piles. The piles were driven with a pneumatic 140-pound Rhino hammer. The piles were driven to refusal, which is defined as 1-inch or less penetration in 1-minute of continuous driving over the course of three cycles. According to the approved plans a minimum embedment depth of 20-feet is required. Please see the table below for details. Pile Number Embedment Penetration in Refusal Depth final 60- Seconds 32 191* 1" in 75 seconds, Yes 1" in 75 seconds then <1/2"in3 minutes 30 19, * 1" in 90 seconds, Yes 1" in 90 seconds then <1/2"in3 minutes 31 19, 1" in 90 seconds, Yes 1" in 90 seconds then <1/2"in2 minutes 29 18.5' 1" in 75 seconds, 1" in 75 seconds then 0" in 3 minutes 28 23' 0" in 3 minutes Yes 26 19.5' '/2" in 60 seconds Yes then 0" in 3 minutes 34 20' 0" in 3 minutes Yes Copies to: Owner X Contractor Architect X Building Dept. X Engineer X Client Technical Responsibility: Anthony Coyne, P.E. Date: 2024.10.15 13:28:54-07'00' Anthony Coyne, P.E., Senior Engineer This report applies only to the items tested or reported and is the exclusive property of Otto Rosenau & Associates, Inc. Reproduction of this report, except in full, without written permission from our firm is strictly prohibited. Page 1 of 2 6747 M.L. King Way S., Seattle, Washington 98118 - Phone (206) 725-4600 - Fax (206) 723-2221 Form No.: ADMIN-100-01 (Rev 01105) OTTO ROSENAU & ASSOCIATES, INC. Geotechnical Engineering, Construction Inspection & Materials Testing Job Name: Point Edwards Condo Sidewalk Replacement Job No.: 24-0623 Report No.: GE01570072 Pile Number Embedment Depth Penetration in final 60- Seconds Refusal 27 20' 0" in 3 minutes Yes 25 28.25' '/4" in 3 minutes Yes 24 28.75' 0" in 3 minutes Yes 22 27' '/4" in 3 minutes Yes 23 27.5 '/2" in 3 minutes *We contacted Kyle Bozick, Engineer of Record, with Pacific Engineering Technologies regarding the shallower embedment depth for piles 30, 31 and 32. He indicated in an email dated 10/9/2024, that it was acceptable. Pile Locations: 7 3 � I m-D'v Pile #35 is not labeled, but is located below #34. Page 2 of