Loading...
REVIEWED BLD2024-0795+Calculations+6.12.2024_11.21.33_AM+4317044U REVIEWED BY CITY OF EDMONDS t.7-t� PACIFIC NIL-vo ENGINEERING TECHNOLOGIES, INC. Point Edwards Condominiums — Ea2le's Nest Pool Slab Replacement 21 Pine Street Edmonds, WA 98020 Job No. 23190.00 RECEIVED Jun 27 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Structural calculations for the slab repairs and design of fence anchorage at the Point Edwards Condominiums. Design is in accordance with the 2021 Washington State Building Code and 2021 Washington State Existing Building Code including the State of Washington Amendments. LIB 21/zq' A B 1 2 3 Y' DIA PIPE PILES, ryr. PRVVIDE 2% SLOPE TO 02Nr- GRADE BEAM, DRAIN TOWARDS EDGES, TYP. AWAY FROM POOL. CONTRACTOR TO VERIFY M' I-' EXIST. ADJACENT GRADES REMOVE EXIST. BLAB AND REPLACE WITH S" CLNC. / w SLAB TO MATCH EXIT. PATTERN AND OPL.L--- ; COORELOR SLAB -----------_ C. EAC4I�ED WITH •84T 1m^oc. EACH wqr, -------sm----- ` SH"SHADED= — I / 3ID � ,! w EXIST. FENCE TO REMAN, ! r------T•-----.---.- NOT SHOUN FOR 1 CLARITY. EXPANSION JOINT I ! I I I I I I I I / •I I- I I I I I I I I I •II PATIO 1•I 3ID 1 1 1 1. ,1 1 1 1 1 - �ICONC. \ BLAB BRA, NO WOW 4 -Z�W Dart- -ticIWY O� NOTE To OIWERB FULL USE OF POOL SHOULD NOT RESUME UNTIL CONCRETE HAS CURED] FOR THREE DAYS' FOUNDATION AND PILE PLAN L PE .6HEET 2AP FOR LOCATION OF SLAB SCALE: VV' . I'-&' ®® CONTROL JOINT. REP. SHEET 10 FOR LOCATION OF POOL SKIMI-MR AND POOL DEPTH NUMBERS 1. INSTALL POOL COVER ANCHOR$ N SLAB TO MATCH EXIST. Project No: 23�Date: Sheet: Of: Project Name: p�yT ' Vr - ' `pq K S Comp. By: NWNC-l� Chk.By: ;=iJL PACIFIC nano ENGINEERING TECHNOLOGIES, INC. 2150 N.107th St., Suite 320 Seattle,WA 98133 Contents: - - P:206.281.7500 www.PacEngTech.com Project No: 2�5 101 1J Dater Sheet: Of: Project Name: V o! N 1 " `� W td l Comp. By: Lints Chk.By: �aPACIFIC Gump ENGINEERING TECHNOLOGIES, INC. 2150 N.107th St., Suite 320 Seattle WA 98133 Contents: P:206.281.7500 www.PacEngTech.com Project No: ,2---,5 t. 010 Date: Sheet: — Of: Project Name: ? (i \ Comp. By: Wvs Chk.By: DA 40000 J ENGINEE NOW F RING TECHNOLOGIES, INC. 2150 N.107th St., Suite 320 Seattle,WA 98133 Contents: P: 206.281.7500 www.PacEngToch.com ... ............. . ......... ...... ......................... ......... ......... ....... ......... ......... ......... ......... .. 44 ....... .... ....... ............ Li......0. I .... . ...... . ......... ........... ....... ....... I .......... ........ ......... ......... ......... LL 0..Q ......... ..... J ......... ...... ......... ......... ......... ...... ...... ......... ....... ................... . ..... . .... ............... ............... ...... ...... ....... ......... ......... ......... ........ ...... LIF ..... ......... ....... ........ M :T-1: PI (is ..... 6% S...em �v to ..4. -.1.6.1-a . ..... ....... ... ...... Ine ........... ............... 10 .................. . ........... :0 . .. ......... ....... q .......... ....... ...... GLR ................ ........... ....... ..... ..... ...... a z . . . . . . . . . . . . . . . . . . . . . . . . . . . ............................... — ..... . . . . . . . . . . . . . . . . ... .... .. . . . . . . . . ..... ..... el45 ....... l .. ... .... .... re ......... ... 0 ...... ........ . ..... ..... 6.1.1. ......... ...... ............ ......... ......... . ..... . 0 i> ......... .................... ......... ......... ...... ....... .......................................... ...... ...... ........ A ..... :-- : ... * ... ` ...... -: ..... : * : : 6 -vM5AL 17 G. ................. ......... ................... . . ..... -tlyltil .1, - I . %--� - ....... : ........... ....... :1 ..... -: .... : .......... ......... ......... G. L ....... ......... ... .............................. .............. ....... ..... .... .............. ......... . . . ..... . . . . . 7!-L ......... ......... J-A ................ ... ..... Project No 2� \ no Date: Sheet: Of: Project Name: ? Q % N % fz'po kyn Comp. By: 1N'QN-�' Chk.By: PACIFIC ENGINEERING TECHNOLOGIES, INC. 2150 N.107th St., Suite 320 Seattle,WA 98133 Contents: P:206.281.7500 www.PacEngTech.com Project No: L-�1OW, Date: Sheet: Of: Project Name: 1 "A �� A��S Comp. By: V ` " Chk.By: Contents: PI LE's o^R--%q PACIFIC oomft.a ORONO %Mw/ ENGINEERING TECHNOLOGIES, INC. 2150 N.107th St., Suite 320 Seattle,WA 98133 P:206.281.7500 www.PacEngTech.com • Anchor DesignerT"' Software Version 3.2.2309.2 7.Project information Customer company: Customer contact name: Customer e-mail: Comment: 2. Input Data & Anchor Parameters General Design method:ACI 318-19 Units: Imperial units Anchor Information: Anchor type: Bonded anchor Material: F1554 Grade 55 Diameter (inch): 0.500 Effective Embedment depth, her (inch): 4.000 Code report: ICC-ES ESR-4057 Anchor category: - Anchor ductility: Yes hmin (inch): 5.25 cac (inch): 6.97 Cmin (Inch): 1.75 Smin (Inch): 2.50 Recommended Anchor Anchor Name: SET-3GTm - SET-3G w/ 112"0 F1554 Gr. 55 Code Report: ICC-ES ESR-4057 F. r � t!1 IN, Company: Date: 2/22/2023 Engineer: Page: 115 Project Address: Phone E-mail 77 Project description: Location: Fastening description: Base Material Concrete: Normal -weight Concrete thickness, h (inch): 12.00 State: Cracked Compressive strength, fe (psi): 4000 4Jc,v: 1.0 Reinforcement condition: Supplementary reinforcement present Supplemental edge reinforcement: Not applicable Reinforcement provided at corners: No Ignore concrete breakout in tension: No Ignore concrete breakout in shear: No Hole condition: Dry concrete Inspection: Continuous Temperature range, Short/Long: 150/110°F Reduced installation torque (for AT-3G): Not applicable Ignore 6do requirement: Not applicable Build-up grout pad: No Base Plate Length x Width x Thickness (inch): 6.00 x 8.00 x 0.25 Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility. Simpson Strong -Tie Company Inc. 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com E.71►�u:�-7•�►■ Anchor Designerlm Software Version 3.2.2309.2 Load and Geometry Load factor source: ACI 318 Section 5.3 Load combination: not set Seismic design: No Anchors subjected to sustained tension: No Apply entire shear load at front row: No Anchors only resisting wind and/or seismic loads: No Strength level loads: Nua [lb]: 0 Wax [lb]: 0 Way [lb]: 0 Mux [ft-lb]: 0 Muy [ft-lb]: 0 Muz [ft-lb]: 1200 <Figure 1> 0 ft-Ib x 0 Ib 1200 ft- b G 10 Z Company: Date: 1 2/22/2023 Engineer: I Page: 2/5 Project: Address: Phone: E-mail: 0 ft-Ib' `Y 0 Ib Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility. Simpson Strong -Tie Company Inc. 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com t-�l►vil-z•�►■ Anchor Designer TM 4. Software Version 3.2.2309.2 <Figure 2> Company: Date: 2/22/2023 Engineer: Page: 3/5 Project, Address: Phone: E-mail: Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility. Simpson Strong -Tie Company Inc. 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com t.-�I►�ii�-�•�e■ Anchor Designer TM Software Version 3.2.2309.2 Company: Date: 2/22/2023 Engineer: Page: 4/5 Project: Address: Phone.- E-mail: 3. Resulting Anchor Forces Anchor Tension load, Shear load x, Shear load y, Shear load combined, Nua (lb) Vuax (Ib) Vuay (lb) J Uax)2+(Vuay)2 (lb) 1 0.0 960.0 480.0 1073.3 2 0.0 -960.0 480.0 1073.3 3 0.0 -960.0 -480.0 1073.3 4 0.0 960.0 -480.0 1073.3 Sum 0.0 0.0 0.0 4293.1 Maximum concrete compression strain (%c): 0.00 <Figure Maximum concrete compression stress (psi): 0 Resultant tension force (lb): 0 Resultant compression force (lb): 0 04 03 Eccentricity of resultant tension forces in x-axis, e'Nx (inch): 0.00 Eccentricity of resultant tension forces in y-axis, e'Ny (inch): 0.00 Eccentricity of resultant shear forces in x-axis, e'vx (inch): 0.00 Y Eccentricity of resultant shear forces in y-axis, e'vy (inch): 0.00 01 xT 02 8. Steel Strength of Anchor in Shear (Sec. 17.7.11 Vsa (lb) ( grout 0 09routOVsa (lb) 6390 1.0 0.65 4154 9. Concrete Breakout Strength of Anchor in Shear (Sec. 17.7.2) Shear perpendicular to edge in x-direction: Vbx = minl7(/e/da)0_24da.el'fcCa11 5; 9A.gfcca1151 (Eq. 17.7.2.2.1a & Eq. 17.7.2.2.1b) /e (in) da (in) Aa fc (psi) cal (in) Vbx (lb) 4.00 0.500 1.00 4000 2.00 1342 OVcbgx = 0 (Avc/Av.)Y' ec,vY'edvYo,vY'h,vVbx (Sec. 17.5.1.2 & Eq. 17.7.2.1b) Avc (in2) Ayeo (in2) Y'ee,V Y'ed,v Y'gv Y'h,v Vbx (Ib) 0 OVcbgx (lb) 18.00 18.00 1.000 1.000 1.000 1.000 1342 0.75 1007 Shear parallel to edge in x-direction: Vby = minj7(/e/da)021(daAa4fX.115; 9aa1(fcca115j (Eq. 17.7.2.2.1a & Eq. 17.7.2.2.1b) /e (in) da (in) A. fc (psi) cal (in) Vby (Ib) 4.00 0.500 1.00 4000 2.00 1342 OVcbgx = 0 (2)(Avc/Avco) `Yec,vY'edvY'c,vY'h,vVby (Sec. 17.5.1.2, 17.7.2.1(c) & Eq. 17.7.2.1b) Avc (in2) Avon (in2) Y'egv Y'ed,v Pc,v Th,v Vby (lb) 0 01/oagx (lb) 36.00 18.00 1.000 1.000 1.000 1.000 1342 0.75 4026 Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility. Simpson Strong -Tie Company Inc. 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com It�n�n�.z•�►'� Anchor Designer TM Software Version 3.2.2309.2 Company: Date: 2/22/2023 Engineer I Page: 1515 Project: Address: Phone: E-mail: 10. Concrete Prvout Strength of Anchor in Shear fSec. 17.7.3) OVcp = 0minikq^ ; kc^bl = 0minikcp(ANa/ANao)Ved,NaVcp,NaNba; kcp(ANc/ANco)V'ed,NVO,N`Pcp,NNbl (Sec. 17.5.1.2 & Eq. 17.7.3.1a) kcp ANa (m2) ANao (in') V'ed,Na V'cp,Na Nba (lb) Na (lb) 2.0 35.58 205.45 0.784 0.000 9861 0 ANc (In2) ANco (m2) 'PC d,N Vo,N 31.50 144.00 0.800 1.0C 11. Results Interaction of Tensile and Shear Forces (Sec. 17.8 Shear Factored Load, Vua (lb) Steel 1073 T Concrete breakout x- 960 II Concrete breakout x- 960 Pryout 1073 V'cp,N Nb (lb) Nob (Ib) 0 - 1.000 8601 1505 0.70 Design Strength, oW (lb) Ratio 4154 0.26 1007 0.95 4026 0.24 1874 0.57 SET-3G w/ 1/2" 0 F1554 Gr. 55 with hef = 4.000 inch meets the selected design criteria. 12. Warninas - Designer must exercise own judgement to determine if this design is suitable. - Refer to manufacturer's product literature for hole cleaning and installation instructions. OVcp (Ib) 1874 Status Pass Pass (Governs) Pass (Governs) Pass Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility. Simpson Strong -Tie Company Inc. 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com