Loading...
2024-03-19-Edgewood Condo Wall Repair-PAM406935OTTO ROSENAU & ASSOCIATES, INC. Geotechnical Engineering, Construction Inspection & Materials Testing PROPRIETARY ANCHOR MECHANICAL INSPECTION REPORT Report Number: PAM406935 Project Name: Edgewood Condo Wall Repair Project Address: 1110 5th Avenue South, Edmonds Client Name: Edgewood Owners Association Job No: 24-0091 Permit: BLD2023-1036 Inspector: Jonathan Andrews (WABO#: SI 02312) Insp. Date 03/19/2024 Description / Location 5/8" Titen HD Anchors into existing west foundation stem wall for Unit 101 bottom plate connection, per RFI #1. Inspected to approved plans. J Intended Use: Bottom plate connection Building Code & Year: IBC 2018 Anchor Style: ❑ Expansion ❑ Screw ❑ Sleeve ❑ Drop In Anchor Size & Quantity: 5/8" (2) ESR Number: 2713 Anchor Manufacturer: Simpson Anchor Type: Titen HD Hole Diameter: 5/8" Hole Depth: 6.5" Required Embedment: 6.5" Anchor Length: 10" Concrete Thickness: Existing Concrete Strength: Existing Base Material:❑ Normal Weight Concrete ❑ Lightweight Concrete ❑ CMU Brick ❑ Composite Deck Hole Cleaning:❑ Compressed Air ❑ Hand Pump ❑ Vacuum Drill Bit ❑ Other: Drill Bit (ANSI B212.15): Yes ORA Torque Wrench ID: ORA6113 Torque: 80 ft-lbs Weather: Clear Ambient Temperature: Reference Standard(s) Used: Conforms? 0 Yes ❑ No Ambient Temperature: 43 degrees F outside, 62 degrees F indoors Installed per MPII. Comments: Copies to ❑� Client ❑d Engineer ❑ Others Technical Responsibility: ❑ Owner ❑ Contractor 0 Architect n Building Dept ,Jeff Rabe, Project Manager This report applies only to the items tested or reported and is the exclusive property of Otto Rosenau & Associates, Inc. Reproduction of this report except in full, without written permission from our firm is strictly prohibited. 6747 M.L. King Way S., Seattle, Washington 98118 — Phone (206) 725-4600 — Fax (206) 723-2221 Form No.: ADMIN-87-03 (Rev 01124) Page 1 of 1