Loading...
APPROVED BLD2023-1036+SI Agreement+9.21.2023_3.52.08_PM+3797869SPECIAL INSPECTION AND TESTING AGREEMENT Permit Number: BLD2023-1036 Project: Edgewood Condo's , 1110 51' Avenue South Prior to issuance of a permit, this form must be completed in its entirety and returned to the City for approval. The completed form must have signatures of acknowledgment by all parties. DUTIES AND RESPONSIBILITIES Special Inspection Firm and Special Inspectors The Special Inspection firm of Otto Rosenau & Associates, Inc will perform special inspection for the following types of work (separate forms must be submitted if more than one firm is to be employed). Special Inspections shall be performed for the following: Wood Periodic inspecbon of anchor bolts. hold-downs, drag strut connections, nailing size & spacing. Periodic verification of moisture content of wood studs, plates. beams, and joists Penodic inspection of 2x and 3x bottom plates and plate washers PREFABRICATED CONSTRUCTION: All prefabricated construction shall con`orm to the inspection requirements of the same material or construction type used for this project STRUCTURAL OBSERVATIONS. When required by the provisions of Section 1704 6.1. 1704.6 2, or 1704 6 3. the Owner or the Owner's authorized agent shall employ the FOR to perform structu al observations Structural observations do not include or waive the responsibility for the inspections in IBC Section 108 or the special inspections in Section 1705 or oche, sections in the code. The following structural observations are required to be completed by the FOR during construction The FOR is to be notified when elements listed below are substantially complete and ready for observation. Contact the FOR a minimum of (2) business days prior to covering the work. • Substantial completion of Wall Framing Repairs All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector and the firm are qualified by education and experience to perform the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall include: A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. \\edmsvr-userfs\userprof$\dakau\Desktop\DONOVANS Comments Letters and Special Inspection forms 2019\Special Inspection forms\SI 2023-1036 Edgwood condos (siding replacement, repair and windows).docx 8/31/2023 \\edmsvr-userfs\userprof$\dakau\Desktop\DONOVANS Comments Letters and Special Inspection forms 2019\Special Inspection forms\SI 2023-1036 Edgwood condos (siding replacement, repair and windows).docx 8/31/2023 Contractor The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at the jobsite for the use of the special inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. Building Department The building department shall review any revisions and addenda. The City inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Design Professionals The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to ensure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. Owner The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner: Sharon Stocker c�woil stouter Signature Sharon Stocker (Sep 15, 202313:52 PDT) Sep 15, 2023 Date Contractor: Chris Davies 6&�n Signature Chris Davies (Sep 19, 202310:08 PDT) Sep19,2023 Date Architect: Keith Soltner X�s� Signature Keith Soltner (Sep 21, 202315:43 PDT) Sep21,2023 Date Structural Engineer: Melissa White Melissa whife Signature Melissa White (Sep 19_2,02312:10 PDT) Sep 19, 2023 Date Special Inspection Insp: Judi Payseno Signature � l �v Date Sep 19, 2023 ACCEPTED FOR THE CITY OF EDMONDS BUILDING DIVISION By: Date \\edmsvr-userfs\userprof$\dakau\Desktop\DONOVANS Comments Letters and Special Inspection forms 2019\Special Inspection forms\SI 2023-1036 Edgwood condos (siding replacement, repair and windows).docx 8/31/2023 BLD2023-1036_Required_Prior_to_Issuance_8- 31-2023_U NSIGN ED_SI_2023-1036_Edgewood _condos_(siding_replacement_repair_and_wind OWS) Final Audit Report Created: 2023-09-14 By: Cheryl Nicodemus (cheryl@soltnergroup.com) Status: Signed Transaction ID: CBJCHBCAABAAWudrV95GyLyaT43cUBN62s95W6QhkrSe 2023-09-21 "BLD2023-1036_Required_ Prior _to_Issuance_8-31-2023_UNSI G N E D_S I_2023-1036_Edgewood_condos_(sid i ng_replacement_ _repair_and_windows)" History Document created by Cheryl Nicodemus (cheryl@soltnergroup.com) 2023-09-14 - 3:35:11 PM GMT- IP address: 173.160.195.137 Document emailed to Sharon Stocker (edgewoodcondohoa@gmail.com) for signature 2023-09-14 - 3:40:05 PM GMT Email viewed by Sharon Stocker (edgewoodcondohoa@gmail.com) 2023-09-15 - 1:54:07 AM GMT- IP address: 98.203.213.241 Document e-signed by Sharon Stocker (edgewoodcondohoa@gmail.com) Signature Date: 2023-09-15 - 8:52:43 PM GMT - Time Source: server- IP address: 174.165.206.219 Document emailed to Chris Davies (chris_davies@cdkconstruction.com) for signature 2023-09-15 - 8:52:45 PM GMT Email viewed by Chris Davies (chris_davies@cdkconstruction.com) 2023-09-19 - 5:07:31 PM GMT- IP address: 50.125.105.219 Document e-signed by Chris Davies (chris_davies@cdkconstruction.com) Signature Date: 2023-09-19 - 5:08:55 PM GMT - Time Source: server- IP address: 50.125.105.219 Document emailed to Melissa White (melissa@dibbleengineers.com) for signature 2023-09-19 - 5:08:57 PM GMT 0 Adobe Acrobat Sign Email viewed by Melissa White (melissa@dibbleengineers.com) 2023-09-19 - 7:06:11 PM GMT- IP address: 50.206.232.122 Document e-signed by Melissa White (melissa@dibbleengineers.com) Signature Date: 2023-09-19 - 7:10:05 PM GMT - Time Source: server- IP address: 50.206.232.122 Document emailed to Jeff Rabe Qeff@ottorosenau.com) for signature 2023-09-19 - 7:10:07 PM GMT Email viewed by Jeff Rabe Qeff@ottorosenau.com) 2023-09-19 - 7:14:36 PM GMT- IP address: 104.47.58.254 Document signing delegated to Judi Payseno Qudi@ottorosenau.com) by Jeff Rabe Qeff@ottorosenau.com) 2023-09-19 - 7:24:01 PM GMT- IP address: 50.226.5.58 P+ Document emailed to Judi Payseno Qudi@ottorosenau.com) for signature 2023-09-19 - 7:24:01 PM GMT Email viewed by Judi Payseno Qudi@ottorosenau.com) 2023-09-19 - 7:25:39 PM GMT- IP address: 104.47.56.254 Document e-signed by Judi Payseno Qudi@ottorosenau.com) Signature Date: 2023-09-19 - 7:26:56 PM GMT - Time Source: server- IP address: 50.226.5.58 �'.. Document emailed to Keith Soltner (keith@soltnergroup.com) for signature 2023-09-19 - 7:26:57 PM GMT Email viewed by Keith Soltner (keith@soltnergroup.com) 2023-09-21 - 10:43:11 PM GMT- IP address: 173.160.195.137 Document e-signed by Keith Soltner (keith@soltnergroup.com) Signature Date: 2023-09-21 - 10:43:39 PM GMT - Time Source: server- IP address: 173.160.195.137 0 Agreement completed. 2023-09-21 - 10:43:39 PM GMT U Adobe Acrobat Sign