Loading...
APPROVED ENG RESUB1 BLD2024-0475+STAGING_Plan+5.16.2024_3.14.07_PM+4263044SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM SCHEDULE TRAFFIC CONTROL INSPECTION WHEN SIDEWALK IS CLOSED. PQ 7.g le , VW RESUB May 16 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT "SIDEWALK CLOSED CROSS HERE" SIGN "SIDEWALK CLOSED" SIGN PLACE SIDEWALK CLOSED AHEAD SIGNS AT 7TH & MAIN AND 6TH & DAYTON ANY CLOSURE OF SIDEWALK OR PARKING BEYOND WHAT HAS BEEN APPROVED WITH ISSUANCE OF THIS PERMIT SHALL INCUR ADDITIONAL DISRUPTION FEES. OWNER/CONTRACTOR IS RESPONSIBLE FOR Applicant shall repair/replace all EROSION CONTROL AND DRAINAGE damage to utilities or frontage improvements in City right-of-way per city standards that is caused or OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING occurs during the permitted project. ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. BLD2024-0475 - - 1-4: sidewalk closed loc. Private parking lot used for material & dumpster storage. - Phase 1: siding in these areas ban be done on weekdays during permit hours. - Phase 2: siding to be done on Saturday's while the businesses are closed, during permit hours. The sidewalk on 6th Avenue S will remain closed during the week and reopen on the weekend. The sidewalk on Main street will be open during the weekdays and close on the weekends. 6th Avenue S will be closed on weekdays for two weeks, Main St will be closed for two consecutive Saturdays. ENGINEERING DIVISION APPROVED AS NOTED 05/30/2024