APPROVED ENG RESUB1 BLD2024-0475+STAGING_Plan+5.16.2024_3.14.07_PM+4263044SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
SCHEDULE TRAFFIC CONTROL INSPECTION WHEN SIDEWALK IS CLOSED.
PQ
7.g
le
, VW
RESUB
May 16 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
"SIDEWALK
CLOSED CROSS
HERE" SIGN
"SIDEWALK
CLOSED"
SIGN
PLACE
SIDEWALK
CLOSED AHEAD
SIGNS AT
7TH & MAIN AND
6TH & DAYTON
ANY CLOSURE OF SIDEWALK OR PARKING BEYOND WHAT HAS
BEEN APPROVED WITH ISSUANCE OF THIS PERMIT SHALL
INCUR ADDITIONAL DISRUPTION FEES.
OWNER/CONTRACTOR IS RESPONSIBLE FOR
Applicant shall repair/replace all
EROSION CONTROL AND DRAINAGE
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
occurs during the permitted project.
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
BLD2024-0475
- - 1-4: sidewalk closed loc. Private
parking lot used for material &
dumpster storage.
- Phase 1: siding in these areas ban
be done on weekdays during
permit hours.
- Phase 2: siding to be done on
Saturday's while the businesses are
closed, during permit hours.
The sidewalk on 6th Avenue S will
remain closed during the week and
reopen on the weekend. The sidewalk
on Main street will be open during the
weekdays and close on the weekends.
6th Avenue S will be closed on
weekdays for two weeks, Main St will
be closed for two consecutive
Saturdays.
ENGINEERING DIVISION
APPROVED AS NOTED
05/30/2024