Loading...
BLD2022-1183+Supplementals_Professional_Stamp_Requirement+9.6.2022_11.34.31_AM+3091374Og FDAI OM MyBuildingPermit.com Jurisdiction: Edmonds Project Name: Firdale Village Fire 11- Future Tenant 9605B Application 1D: 1197796 Supplemental Name: Professional Stamp Requirement Drawings must be stamped by a Washington State licensed architect or engineer if the building is over 4,000sf. Please note that the entire building is included in the 4,000sf requirement, not just the tenant space involved.