APPROVED ENG PLN BLD2023-0175+Site_Plan+2.13.2023_12.11.19_PM+3366356RECEIVED
Apr 24 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
BLD2023-0175
Applicant shall repair/replace all
damage to utilities or frontage
Tree protection must include the
improvements in City right-of-way
critical root zone and meet the
per city standards that is caused or
occurs during the permitted project.
standards in ECDC 23 10 070
5FT MAG
NAIL IN
CONCRETE
WA NUf 5TI f
APPROVED BY PLANNING
°
O 55MH DATUM
FOUND
PIM=318,01'
N-5-313,59' ���%� &CAP
INV �
I (4586) 0.4' 5e PUP POLE Jun 06 2023
N96F OF PAVEMENT WATEP MFTEP
5119FWALK N89'5�0HNfeaai 319'
SFWEP
oa ri rn 60.0 ' CLEAN OUT
� I'Af;CFL
004342-03
o o
N o = 10 �12
NAN9' — I
HFAf C
PUMP
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT. I
N
l
14'
11
ED;
°
20 60.00'
5Ff M16 NAIL 589`52'2611E FOUND
ON TOP OF PFBAR & CAP
WOOn FENCE (4586) 0,2' W
51t PLAN
1' 20' -011
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
OH
M ORANGE SAFETY
FENCE TM
II PPOTM10N
ZONE
5EWRR
CLEAN OUT
KFY 2 Wt5
DI
PPOPO5En 5FP
OZ
PPOP05N2 GAP,AGE
O
PPOP05F[9COVFPFn
FNTPY / PATIO
®
COMT12 PATIO
O
PPOP05`9 CONCPETF
19MVF/ PARKING
O
12''-24'' OVEPHANG5
PFP PLAN
®
CONCPFTE PATIO
OFLEC
51FPLY WOM FXI511N6
POLE (Fiftp VFPIFY)
IQ
WATER 5UPPI Y MOM
1 4511NG CONNECTION
(FIELn VFPIFY)
II
LAWN
12
FXCAM19 501L, COVED
WITH TARP WITHIN 24 HP5
13
19IMFN51ONAL
5FTBACK5
14
SEPTIC I.INF fO
5FMP CONNECTION
(FIEW VERIFY)
Noise generated by mechanical
equipment must meet the
standards in ECC 5.30
MK ANI7 JESSICA MAN
1050 WALNUT SiPFEf
EI7MONI75 WA 98020
PPIOp05E17 L01" COVFP.AGE:
I, PPOP05En 5FP; I522 50. FT.
2, PROPO51 1P 6APA6iF; 631 5Q, FT.
3, PPOP05N9 COVFMP ENTRY; 58 50. Ff.
4, PPOPO51 IP COVFPN9 PA110: 104 5Q, Ff.
TOTAL PPOP05FI2 NEW- 2315 5Q. Ff. BUILIANG COVERAGE ARFA
1. PROPO5E17 5FP; 1522 50, FT,
2. PP01`05F19 GARAGE; 631 59, Ff.
3, PP0P05R9 COVKT19 ENTPY; 58 5Q, Ff.
4, PP01`05E2 COVMP PATIO: 104 5Q. Ff.
LOT 51ZF: 661150. Ff. + -
fOfAL LOf COVERAGE; 35,07
MAX ALLOWABLE P5-6 ZONE; 35/
HEIGHT C&CULA110N5;
Aa+319'
3-+319
C-+ 520
2-+319'
fOrk-12VV
AV6 6t? r-519.25 ( 127114 )
ACTUA,-519'
MAXIMUMs399,25'
( AVFPP6F 6P.A17F +25, )
ENGINEERING DIVISION
APPROVED AS NOTED
/
06/30/2023
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
- PSCAA # 202300419
- Critical area waived
- Cap side sewer at existing property line sewer clean out location
- Water meter protected in existing Concrete box with Cast Iron Lid
- Install anti-siphon/bfp on existing water meter for use during demo/construction
- Provide temporary erosion control if needed prior, during and post demo work
Utility patches shall be combined and full width or half
ALL DISTURBED SOILS SHALL BE width overlay will be required depending on the extent RESTORATION LIMITS TO BE DETERMINED
COMPOST AMENDED PER CITY OF of disturbance. Where utility patches fall entirely within BY CITY ENGINEERING INSPECTOR
EDMONDS STANDARD DETAIL SD-642 OR one travel lane, the overlay shall extend to the
APPROVED EQUAL. centerline of roadway. Where utility patches extend into
both travel lanes then a full width overlay is required.