Loading...
APPROVED ENG PLN BLD2023-0175+Site_Plan+2.13.2023_12.11.19_PM+3366356RECEIVED Apr 24 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2023-0175 Applicant shall repair/replace all damage to utilities or frontage Tree protection must include the improvements in City right-of-way critical root zone and meet the per city standards that is caused or occurs during the permitted project. standards in ECDC 23 10 070 5FT MAG NAIL IN CONCRETE WA NUf 5TI f APPROVED BY PLANNING ° O 55MH DATUM FOUND PIM=318,01' N-5-313,59' ���%� &CAP INV � I (4586) 0.4' 5e PUP POLE Jun 06 2023 N96F OF PAVEMENT WATEP MFTEP 5119FWALK N89'5�0HNfeaai 319' SFWEP oa ri rn 60.0 ' CLEAN OUT � I'Af;CFL 004342-03 o o N o = 10 �12 NAN9' — I HFAf C PUMP OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. I N l 14' 11 ED; ° 20 60.00' 5Ff M16 NAIL 589`52'2611E FOUND ON TOP OF PFBAR & CAP WOOn FENCE (4586) 0,2' W 51t PLAN 1' 20' -011 OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE OH M ORANGE SAFETY FENCE TM II PPOTM10N ZONE 5EWRR CLEAN OUT KFY 2 Wt5 DI PPOPO5En 5FP OZ PPOP05N2 GAP,AGE O PPOP05F[9COVFPFn FNTPY / PATIO ® COMT12 PATIO O PPOP05`9 CONCPETF 19MVF/ PARKING O 12''-24'' OVEPHANG5 PFP PLAN ® CONCPFTE PATIO OFLEC 51FPLY WOM FXI511N6 POLE (Fiftp VFPIFY) IQ WATER 5UPPI Y MOM 1 4511NG CONNECTION (FIELn VFPIFY) II LAWN 12 FXCAM19 501L, COVED WITH TARP WITHIN 24 HP5 13 19IMFN51ONAL 5FTBACK5 14 SEPTIC I.INF fO 5FMP CONNECTION (FIEW VERIFY) Noise generated by mechanical equipment must meet the standards in ECC 5.30 MK ANI7 JESSICA MAN 1050 WALNUT SiPFEf EI7MONI75 WA 98020 PPIOp05E17 L01" COVFP.AGE: I, PPOP05En 5FP; I522 50. FT. 2, PROPO51 1P 6APA6iF; 631 5Q, FT. 3, PPOP05N9 COVFMP ENTRY; 58 50. Ff. 4, PPOPO51 IP COVFPN9 PA110: 104 5Q, Ff. TOTAL PPOP05FI2 NEW- 2315 5Q. Ff. BUILIANG COVERAGE ARFA 1. PROPO5E17 5FP; 1522 50, FT, 2. PP01`05F19 GARAGE; 631 59, Ff. 3, PP0P05R9 COVKT19 ENTPY; 58 5Q, Ff. 4, PP01`05E2 COVMP PATIO: 104 5Q. Ff. LOT 51ZF: 661150. Ff. + - fOfAL LOf COVERAGE; 35,07 MAX ALLOWABLE P5-6 ZONE; 35/ HEIGHT C&CULA110N5; Aa+319' 3-+319 C-+ 520 2-+319' fOrk-12VV AV6 6t? r-519.25 ( 127114 ) ACTUA,-519' MAXIMUMs399,25' ( AVFPP6F 6P.A17F +25, ) ENGINEERING DIVISION APPROVED AS NOTED / 06/30/2023 SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM - PSCAA # 202300419 - Critical area waived - Cap side sewer at existing property line sewer clean out location - Water meter protected in existing Concrete box with Cast Iron Lid - Install anti-siphon/bfp on existing water meter for use during demo/construction - Provide temporary erosion control if needed prior, during and post demo work Utility patches shall be combined and full width or half ALL DISTURBED SOILS SHALL BE width overlay will be required depending on the extent RESTORATION LIMITS TO BE DETERMINED COMPOST AMENDED PER CITY OF of disturbance. Where utility patches fall entirely within BY CITY ENGINEERING INSPECTOR EDMONDS STANDARD DETAIL SD-642 OR one travel lane, the overlay shall extend to the APPROVED EQUAL. centerline of roadway. Where utility patches extend into both travel lanes then a full width overlay is required.