Loading...
APPROVED ENG PLN BLD2023-0402+Civil Plans+3.31.2023_4.49.40_PM+3457558VICINITY MAP I • 40* r U jotTZ000 � a � rho .i 7 Southwest 1 County Park l Puget Sound �' ��✓ i ri C9: 9 , I ,�;,► Edmonds e" r'~� I � Wood' y = _.r Mountlai wa 23310 HUMBER LANE =. �. Terrace 44 J I I 1 fshe 18a�npe► i w� an -r ..am •• = EDMONDS CONSTRUCTION SEQUENCE NOTES 1. SCHEDULE A PRE -CONSTRUCTION MEETING WITH CITY ENGINEERING DIVISION AT 425-771-0220, EXT. 1326. TWO DAY (48 HR) NOTICE IS REQUIRED. 2. REVIEW TEMPORARY EROSION AND SEDIMENT CONTROL NOTES. 3. CALL FOR UTILITY LOCATES. 4. INSTALL TESC MEASURES AND MAINTAIN DUST CONTROL WHILE PREVENTING DISTURBANCE OF ANY AREAS OF VEGETATION OUTSIDE THE CONSTRUCTION ZONE. 5. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF EDMONDS ENGINEERING INSPECTOR. ALL TEMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE IN PLACE AND INSPECTED PRIOR TO ANY CONSTRUCTION OR SITE CLEARING. EROSION AND SEDIMENTATION CONTROL PRACTICES AND/OR DEVICES SHALL BE MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED. 6. DEMOLISH EXISTING STRUCTURES 7. ROUGH GRADE SITE AS REQUIRED TO INSTALL DRAINAGE FEATURES. 8. CLEAR, GRUB & ROUGH GRADE SITE. COMPOST AMEND AND REVEGETATE DISTURBED AREAS NOT SUBJECT TO ADDITIONAL SURFACE DISTURBANCE IMMEDIATELY AFTER ROUGH GRADING. OTHER EXPOSED AREAS SHALL BE STABILIZED PER EROSION CONTROL NOTES BELOW. 9. INSTALL UTILITIES AND OTHER SITE IMPROVEMENTS, INCLUDING FRONTAGE IMPROVEMENTS. 10. STABILIZE AND COMPOST AMEND ALL EXPOSED SOILS PRIOR TO REVEGETATION OF ENTIRE SITE. 11. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED UPON FINAL SITE STABILIZATION AND APPROVAL BY CITY INSPECTOR. 12. INSTALL INFILTRATION TRENCH. EXCAVATION OF INFILTRATION AREAS SHALL NOT BE ALLOWED DURING WET OR SATURATED CONDITIONS. THE E MP SHALL EROSION -CAUSING PROJECT IMPROVEMENTS ARE COMPLETE E D LmRCMIG ARE STABILIZED. Building Department artment NO. I DATE I BY Work DEMO SFR AND SHED Address 23310HUMBER LN - Owner SHEN ----------------- Approved Date 5/26/2023 Building Official Permit Number BLD2023-0402 REVISIONS EROSION CONTROL LEGEND LIMITS OF DISTURBANCE FILTER FABRIC FENCE (SILT FENCE) SF X X STABILIZED CONSTRUCTION ENTRANCE 0° CE ° CATCH BASIN INLET PROTECTION IP INTERCEPTOR SWALE SEE COR DWG 504, TYPE A TEMPORARY SWALE TREE PROTECTION FENCING CHECK DAM CD STRAW WATTLES I USE AS NEEDED I I APPROVED BY PLA�NNINP iz May 08 2023 1 APPLICANT BERNARD SHEN & CATHERINE FEDERMAN 23310 HUMBER LANE EDMONDS, WA 98020 REFERENCE DRAWINGS & REPORTS SEE C1.2 FOR TESC DETAILS SEE C2.0 FOR DRAINAGE/BMP PLAN SEE SHORT FORM CWSPPP PREPARED BY C.E.S. SEE DRAINAGE REPORT PREPARED BY C.E.S. SOIL AMENDMENT REQUIRED COMPOST AMENDED SOIL REQUIRED ON ALL LANDSCAPED AREAS AFTER CONSTRUCTION N 10 5 0 10 20 SCALE: V=10' CALL FOR LOCATES AT 1-800-424-555 OR 811 I � I I I I I I I CATCH BASIN RIM=365.36 12"PVC (N)IE=361.9E I I 8"PVC (E)IE=362.74 12"PVC (S)IE=362.03 \\ `\ LOD, TYP. I I EXIST. SIDE SLWER EASEMENT \\ RECORDING #:I 2015338 \ S88` 19' 16"E 140.00'(P)IIIIIIIIIIIIIIINEWM — �i 00�� ENGINLERING DIVISION APPikOVED 09/26/2023 CALL 3 WORKING DAYS BEFORE YOU DIG 811 UTILITIES UNDERGROUND LOCATION CENTER (ID,MT,ND,OR,WA) SAFETY PRECAUTION SHALL BE IMPLEMENTED By ELECTRIC - RED SEWER -GREEN GASIOIL- YELLOW CONTRACTOR(S) AT ALL TRENCHING IN SURVEY - PINK TELICATV-ORANGE ACCORDANCE PROPOSED -WHITE WATER -BLUE WITH CURRENT OSHA STANDARDS Side sewer must be cappe01aU- - T the property line with screw )cap \ unless otherwise directed b� ss VIDEO \ OVWSD I I0 • a • I E •�:��•�I/�� Y PIP, VIP 6 I Al y■ I 1 I I I r _ I DATE: Mar 29, 2023 JOB# 2070 DRAFTED: SS DESIGN: DE DIGITAL SIGNATURE b : . ° d ; IA •.d'.. 'e.• f y :.f °Dilater SerG.rrlust.6e ::... dO •• °. of�.I d f •. ° . - d eUiScbm-pect@d frpw1/atr.. .and or Ilbse bib:vvath ° p a d f. f a a ^f. VB r�fsfalleti r�less• :• .: . ;• • • . _ - °• _ ...:.:..//_ //.://// • b° ,;. • •�� • °aCbervise instruct� y ad e• a' •d a.. :•e •. •e e N - •.f VVV��++n d •J .. 1 d e• Z. : a A : a •d d f• d f e ° n A. - a I d• 4 •d i d • f a d - a• e a d d. 9 •• e td i• d f e f• a - Q d 9 d e f d r� _ e f ' e LOD, TYP.— �U v E r 1 S� x C>r 6 Cy ,p 39766 p $� BGISTO 1. ssI01VAL � 1 S88° 19' 16"E 140.00' / \ ' I II I CIVIL ENGINEERING 102 NW CANAL STREET SEATTLE, WA 98107 PHONE:206.930.0342 DUFFY@CESOLUTIONS.US N may' EX 3/4" WM L CEO NP PSP O—ate N TP --CHERRY PL 11 CATCH BA IN RIM=366 30 I 12" VC (N)IE=36 .74 I _-(-a) E=36 .971 CATCH BASIN RIM=365.75 8"PVC (W)IE=363.29 OVWSD approval required to reuse side sewer lateral. OWNER/CONTRACTOR RESPONSIBLE FOR LOCA NG ALL ON SITE UTILITIES. RELOCATION/REVISION T AN UTILITIES MAY REQUIRE A SEPERATE PERMI OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINA E ALL EXPOSED SURFACES FO BE COVERED WITHIN 2 DA S Applicant shall repair/replace all PP e damage to utilities or frontage 9 improvements in City right-of-way per city standards that is caused or occurs during the permitted project. RECEIVED Apr 13 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT NW1/4 SEC36 T27N R3E DRAWING NO: EROSION CONTROL PLAN C1.0 SHEN / FEDERMAN RESIDENCE 00571300101000 23310 HUMBER LANE, EDMONDS, WA 98020 NO. I DATE I BY REVISIONS APPLICANT BERNARD SHEN & CATHERINE FEDERMAN 23310 HUMBER LANE EDMONDS, WA 98020 ENGINEERING DIVISION APPROVED. �Aat 09/26/2023 DATE: Mar 29, 2023 JOB# 2070 DRAFTED: SS DESIGN: DE DIGITAL SIGNATURE STRAW WATTLE DETAIL CONTOUR LINE (TYP) ANGLE TERMINAL END UPHILL 24" TO 48" TO PREVENT FLOW AROUND WATTLE (TYP) WATTLE TRENCH, SEE NOTE 2 --s 2"x2"x24" UN —TREATED WOODEN STAKE (TYP) AREA AVAILABLE FOR SPACING VARIES SEDIMENT TRAPPING SEE WATTLE SPACING (TYP) TABLE (TYP) SECTION A —A W WATTLE INSTALLATION ON SLOPES N OTES: WATTLE (TYP) SEE DETAIL 2"x2"x24" UN —TREATED ,WOODEN STAKE (TYP) t 3" MIN 4" MAX B" DIAMETER MIN WATTLE DETAIL 8" DIAMETER SPACING WATTLE TABLE SLOPE MAXIMUM SPACING 1H:1V 10'-0" 2H:1V 20'-0" 3H:1V 30'-0" 4H:1V 40'-0" >4H:1V ONE RUN ONLY 1. COMPOST WATTLES RECOMMENDED ON SLOPES. USE STRAW WATTLES IN PAVEMENT APPLICATION. 2. ON SLOPES, INSTALL WATTLES PERPENDICULAR TO THE FLOW DIRECTION AND PARALLEL TO THE SLOPE CONTOURS. INSTALLATION SHALL BE IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION 8-01.3(10). 3. RUNOFF SHALL NOT RUN UNDER OR AROUND ROLL. ADDITIONAL STAKING MAY BE NECESSARY TO PREVENT UNDERCUTTING. 4. WATTLES SHALL BE INSPECTED REGULARLY, AND IMMEDIATELY AFTER A RAINFALL PRODUCES RUNOFF. REMOVE SEDIMENT AND ACCUMULATIONS WHEN EXCEEDING 1/2 HEIGHT BETWEEN THE TOP OF THE WATTLE AND THE GROUND SURFACE. REVISION DATE CITY OF EDMONDS JANUARY 2018 WATTLE INSTALLATION PUBLIC WORKS STANDARD DEPARTMENT D ETAI L 18 9 APPROVED BY: R. ENGLISH E R— 9 0 3 CONSTRUCTION ENTRANCE DETAIL _LS 4 TH IN DE FULL WIDTH GRESS/EGRESS DETAIL NOTES: 1O THE MINIMUM LENGTH SHALL BE EXTENDED AS NECESSARY TO ENSURE MATERIAL IS NOT TRACKED OFF SITE AND/OR INTO THE PUBLIC RIGHT—OF—WAY. O2 ATB DRIVEWAY RAMP AND/OR SITE ACCESS ROAD 15' WIDE MIN. SEE TABLE BELOW FOR REQUIRED LENGTH. NOTES: 1. SURFACE WATER — ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. 2. MAINTENANCE — THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT OFF SITE AND/OR ONTO PUBLIC RIGHT—OF—WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL QUARRY SPALLS AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED OFF SITE AND/OR ONTO PUBLIC RIGHT—OF—WAY MUST BE REMOVED IMMEDIATELY. 3. WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO LEAVING THE SITE. WHEN WASHING IS USED, IT SHALL BE DONE ON AN AREA STABILIZED WITH QUARRY SPALLS AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 4.INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN. PROJECT SIZE MIN LENGTH OF (FEET) QUARRY SPALLS* < 1/4 ACRE 30 < 1 ACRE 50 < 3 ACRE 100 > 3 ACRE 100 *PROVIDE ATB OR ASPHALT TRANSITION WHERE FRONTAGE ROAD IS AN ARTERIAL LENGTH TO BE DETERMINED BY CITY INSPECTOR. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN REVISION DATE CITY OF EDMONDS STABILIZED CONSTRUCTION JANUARY 2018 ' PUBLIC WORKS ENTRANCE STANDARD DEPARTMENT DETAIL s } 189 APPROVED BY: R. ENGLISH E R — 9 01 Uv x � W 6 9766 I S-T CIVIL ENGINEERING 102 NW CANAL STREET SEATTLE, WA 98107 PHONE:206.930.0342 DUFFY@CESOLUTIONS.US INLET PROTECTION DETAIL CATCH BASIN GRATE FILTER SOCK WITH OVER FLOW HOLES (TYP) CATCH BASIN NOTES: 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN THIS APPLICATION AT ALL TIMES DURING CONSTRUCTION PERIOD. 2. ANY SEDIMENT IN CATCH BASIN INSERT SHALL BE REMOVED WHEN INSERT IS ONE—THIRD FULL. 3. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN. � REVISION DATE CITY OF EDMONDSTEMPORARY JANUARY 2018 SEDIMENT TRAP PUBLIC WORKS FOR CATCH BASINS STANDARD 7 DEPARTMENT DETAIL s t 1 g 9 APPROVED BY: R. ENGLISH E R— 9 0 2 FILTER FABRIC FENCE DETAIL NOTES: 2" x 2" WOOD/STEEL FILTER FABRIC SECURED TO2"x2" 14GA WIRE FABRIC EQUAL 0 N NATIVE BACKFILL MATERIAL FILTER FABRIC MATERIAL IN CONTINOUS ROLLS USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE 2" x 2" WOOD/STEEL POSTS 1 WIRE MESH FENCE TO SUPPORT FILTER FABRIC -1 BURY `� I MATERIAOT80M TO' FIFILTER 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN AND ENSURE PROPER EROSION CONTROL THROUGHOUT PROJECT. 2. SILT FENCE TO BE PLACED DOWNSLOPE OF CONSTRUCTION ACTIVITY. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN REVISION DATE CITY OF EDMONDS FILTER FABRIC FENCE JANUARY 2018 FILTRATION SYSTEMS PUBLIC WORKS STANDARD DEPARTMENT DETAIL s t Is 9 APPROVED BY: R. ENGLISH E R— 9 0 0 TESC DETAILS RECEIVE, Apr 13 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT NW1 /4 SEC36 T27N R3E SHEN / FEDERMAN RESIDENCE 23310 HUMBER LANE, EDMONDS, WA 98020 DRAWING NO: C11.2 00571300101000 SANITARY SEWER FLOW CONTROL BMP's BOUNDARY & TOPO SURVEY ROOF CHART OLYMPIC VIEW SEWER & WATER DISTRICT (OVWSD) O O-SDR 35 PVC SANITARY SEWER @ MIN 2.0 %. CONNECT TO EXISTING SIDE -SEWER. REF. OVWSD DETAIL W-1A. O O-EXISTING SIDE SEWERS PROPOSED TO BE REUSED MUST BE LOCATED AND CCTV'D AND VIDEO PROVIDED TO DISTRICT FOR REVIEW. EXISTING SIDE SEWER REPAIRED BY CIPP MUST BE CCTV'D AND VIDEO PROVIDED TO DISTRICT FOR REVIEW. 0- WATER IMPROVEMENTS OLYMPIC VIEW SEWER & WATER DISTRICT 0- 0 -1.5" DIA POLY PRIVATE WATER SERVICE FROM METER PIT TO HOUSE @ MIN. 36 INCH DEPTH. 0- STORM DRAIN 20 -4" STORM DRAIN @ MIN 2.0 % GRADE (ASTM D-3034 PVC) 21 -4" FOUNDATION DRAIN @ MIN. 1.0 %. INCL. BACKFLOW PREVENTION. 22 - 23 - 24 - 25 - 29 - STORM DRAIN STRUCTURES 30 - 31 - O32 -TYPE 1 CATCH BASIN WITH SOLID LID PER EDMONDS DETAIL SD-303 0 - 35 - 36 - 37 - STREET IMPROVEMENTS 60 - 61 - 62 -DRIVEWAY APPROACH PER EDMONDS DRIVEWAY DETAIL TR-546. 10-foot RADIUS REQUIRED. HMA PLACED MINIMUM 20' FROM EDGE OF EXISTING STREET. 67 - 71 -IF WARRANTED, GRIND AND OVERLAY PER EDMONDS STANDARDS. COORDINATE WITH INSPECTOR. NO. I DATE I BY REVISIONS 50 -DETAIL NDP-1 : COMPOST AMENDED SOIL TO ALL DISTURBED AREAS (SEE DOE BMP T5.13). TILL 2-3" OF COMPOST INTO UPPER 8" OF SOIL. LOOSEN COMPACTED SUBSOIL, IF NEEDED BY RIPPING TO 12" DEPTH. MULCH LANDSCAPE BEDS AFTER PLANTING. 51 - G-SPLASHBLOCK DIRECTED AWAY FROM STRUCTURE. MAXIMUM 700 sf ROOF PER DOWNSPOUT. MINIMUM 50 LF FLOWPATH TO PL REQUIRED. 53 -DISPERSAL TRENCH PER EDMONDS DETAIL SD-631 AND SD-632. SEE PLAN FOR LENGTH. G - SOIL SUMMARY GLACIAL TILL WITH SHALLOW 55 _ GROUNDWATER INFILTRATION NOT 56 RECOMMENDED BY _ GEOTECHNICAL ENGINEER 57 _ 58 _ INFILTRATION/SOILS SUMMARY SOILS REPORT SUMMARY Infiltration recommendation? Project Depth of Test Pit Soil profile Density= Groundwater Grain Size gravel = very coarse sand = coarse sand = medium sand = fine sand = very fine sand = fines %= USCS soil: Date of digging: Geotech consultant: No: glacial till; shallow groundwater seepage Shen / Federman Residence T and 3.5'-deep glacial till dense seepage at 2.0'-deep, 3.5'-deep N/A N/A N/A N/A N/A N/A N/A dense, slightly gravelly, silty sand that has been glacially compressed Jan.18 2023 Marc McGinnis, PE; Geotech Consultants, Inc. IMPERVIOUS AREA - STORMWATER Impervious Area Spreadsheet (Stormwater) Shen/Federman Residence - 23310 Humber Lane, Edmonds, WA 98020 Site Area 12,600 sf 0.289 acres Existing impervious area Existing imprevious area to be demo'ed 3,595 sf Existing imprevious area to remain 205 sf total existing impervious = 3,800 sf Existing vegetated area 8,800 sf Proposed Impervious Area (on -site) Roof 3,094 sf Exposed driveway, on -site 582 sf Exposed front/side walkway 779 sf total new + replaced impervious = 4,455 sf Existing imprevious area to remain 205 sf Total proposed impervious = 4,660 sf Proposed vegetated area 7,940 sf DISPERSION TRENCH LENGTH PLOG ENGINEERING P.O. BOX 412 RAVENSDALE, WA 98051 PHONE 206-420-7130 www.PlogEngineering.com VERTICAL DATUM NAVD88 ESTABLISHED USING RTK GPS SEE SURVEY SOIL AMENDMENT REQUIRED COMPOST AMENDED SOIL REQUIRED ON ALL LANDSCAPED AREAS AFTER CONSTRUCTION. 50 If DISPERSION TRENC FLOW CONTROL FOR 3,500 s S E SIZING TABLE THIS SHEET SEE EDMOND DETAILS SD-631 AND SD-632 I � / \ \ I � I I ` I 1 � I I I � I 1 / ►I I I 1 8 � 1 , I I '� ITi \ co Op \o0 ^II' °, �b e �°T OTT yF0 �o \ M e 0\ 3 N m •S. � � I /I / TYPE 1 CB 32 / RIM=361.0± / \ IE OUT=359.0± P I � I I � 1 1 I `\ 1 Dispersion Length Sizing Table Max tributary Area (sf) 3500 SF Roof + driveway area tributary to dispersion 10 LF / 700 sf Unit Length Requirement 0.01429 Required minimum Length= 50 LF size based on 700 sf/10 LF APPLICANT BERNARD SHEN & CATHERINE FEDERMAN 23310 HUMBER LANE EDMONDS, WA 98020 'WELL DR FD EX SHED TO REMAIN DATE: Mar 29, 2023 JOB# 2070 DRAFTED: SS DESIGN: DE DIGITAL SIGNATURE I I I I I I I I i \\ SPLASH -BLOCK, TYPP( 51 I 4r �,_J i ��1 r i- �`�� 21 \ — — S88"19'16"E 140.00'(P) —o=o \ SSCO voe li I SHEN/FEDERMAN RESIDENCE 23310 HUMBER LANE EDMONDS, WA 98020 MAIN FLOOR = 363.5± NORTHWEST ROOF = 400 SF TO SPLASH -BLOCK CALL FOR LOCATES AT 1-800-424-555 OR 811 I I I CATCH BASIN RIM=365.3f 12"PVC (N)IE=361.91 8"PVC (E)IE=362.7, 12"PVC (S)IE=362.0: / I -EXIST. SIDE SrWER EASEMENT RECORDING #:I 2015338 SS VIDEO & CO 8 O SSC° IE=361.8± J EX 6" SIDE SEWER 20 I ° • Y µd• 7r- +IMMCD ,.: 1. C11)°•. A d r. I I • 'a i • N ° Il' I. Q •S �. .:- :. A., ° ,>.b / 00 1 0 \ r0 �O/ / 20O ,CINV SOUTH/EAST ROOF = 2,700 SF TO DISPERSION TRENCH CATCH BASIN RIM=365.75 8"PVC (W)IE= 3 � C / CU / J / � I � / cr� o EX PP E I CO IJ ` I • I 0TBR EX 3t /4A (b � U_ I W M r J N N CO / 0i 75 LF I I N / 6"DBH, !IiLR QHERR•• f'L•U S88° 19' 1 F "1= 1 An nn' CATCH BA INII RECEIVE FOR REFERENCE ONLYRIM=366 30 I Apr 13 2023 \ \ 12" VC CITY OF EDMONDS DEVELOPMENT SERVICES WORK NOT APPROVED WITH THIS PERMIT i (N) E=36 .74/ DEPARTMENT (-a)IE=36 .97 I SEE BUILDING PERWT BLD2023-0401 FOR AF PROVED PLANS `� I � \ I CIVIL ENGINEERING 102 NW CANAL STREET SEATTLE, WA 98107 PHONE:206.930.0342 DUFFY@CESOLUTIONS.US NW1/4 SEC36 T27N R3E DRAWING NO: DRAINAGE / BMP PLAN C2.0 SHEN / FEDERMAN RESIDENCE 00571300101000 23310 HUMBER LANE, EDMONDS, WA 98020