APPROVED BLD ENG PLN RESUB 2-BLD2023-1153+Architectural_Plan+8.26.2024_9.18.05_AM+4461690City
Of Edmonds
Building Department
Work
.....................................................................................................................:
DECK
Address
18504 OLYMPIC VIEW DR
Owner .......
DAVIS .........................................
Approved Date
9/05/2024
..................................................................................................:
.................................................................................................
Building Official
'Dow_a�� W. 7_11(o4kALIX
Permit Number
BLD2023-1153
ALL WORK SUBJECT
TO FIELD
INSPECTION FOR
CODE COMPLIANCE
APPROVED
PLANS MUST BE
ON JOB SITE
APPROXIMATE LOCATION
OF 24" DETENTION PIPE
PER SITE PLAN FROM
WHEN THE HOME WAS
BUILT
SILT FENCE FOR TESC
IMPERVIOUS SURFACE
LOT SIZE: 18,730 SF
EXISTING IMPERVIOUS:
EXISTING HOUSE: 1993 SF
EXISTING DRIVEWAY: 2708 SF
TOTAL EXISTING IMPERVIOUS: 4,701 SF
25.1 %
NO NEW PROPOSED IMPERVIOUS SURFACE
2
APPROVED BY PLANNING
Sep 03 2024
ENGINEERING DIVISION
APPROVED AS NOTED
`T 9/26/2024
NO NE IMPERVIOUS SURFACE AREA.
NO CHANGES TO EXISTING STORMWATER
MANAGEMENT SYSTEM PROPOSED.
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
O �y�P N75°43'44"W
O 18.09'
v
eC O
i Vh
4
j hw CPEP
e ti; /
0 ,9
� Z
1 4"
I CP
FOUND 1/2"
REBAR & CAP
MARKED "LS 2621 ", ��
0.2'(N) FROM PROP. LINE
& 8.5'(SE) FROM / / / I d (E)
CALC. PROP. CORNER ` / I DECK
FOUND 1" IRON PIPE,
4.78'(S) OF PROP. LINE __5e
NEW UPPER FLOOR DECK,
AND EXISTING MAIN FLOOR
DECK ARE PERVIOUS WITH
NO NEW DRAINAGE
/ lot-
/
THESE (4) i
PIPES HAVE BEEN i
REMOVED AND WERE
NOT USED
APPROXIMATE LOCATION
OF STORM LINE PER OLD
SITE PLAN
BMP NOTES
- FILTER SOCKS WILL BE ADDED TO ANY CATCH
BASINS DOWNSTREAM FROM CONSTRUCTION
SITE. SEE ER-920 SHEET A1.1
- ALL DISTURBED AREAS TO BE COMPOST
AMENDED PER 2019 SWMMWW BMP T.5.13
- INSTALL AND MAINTAIN ALL TESC MEASURES
ACCORDING TO APPROVED PLANS, CITY
EDMONDS STANDARD DETAILS AND ALL OTHER
MEASUREMENTS THAT MAY BE REQUIRED
DURING CONSTRUCTION.
- FILTER FENCE PER ER-900 SHEET A1.1
Nothing in the permit approval process shall be
interpreted as allowing or permitting the maintenance
of any currently existing illegal, nonconforming or
unpermitted building, structure or site condition which
is outside the scope of the permit application, regardless
of whether such building, structure or condition is
shown on the site plan or drawing. Such building,
structure or condition may be the subject of a separate
enforcement action.
GENERAL NOTES
GENERAL REQUIREMENTS
1. CODES ARCHITECTURE: 2018 EDITION OF THE INTERNATIONAL
RESIDENTIAL CODE, STRUCTURAL 2018 EDITION OF THE
INTERNATIONAL BUILDING CODE, 2018 WASHINGTON ENERGY CODE,
EDMONDS MUNICIPAL CODE
2. ALL WORK TO BE IN COMPLIANCE WITH ALL APPLICABLE CODES,
LAWS AND REGULATIONS OF ALL AUTHORITIES HAVING
JURISDICTION OVER THE WORK.
3. CONTRACTOR TO VERIFY ALL DIMENSIONS, MEASUREMENTS AND
CONDITIONS IN THE FIELD BEFORE BEGINNING WORK. ANY
DISCREPANCIES, ERRORS OR OMISSIONS TO BE BROUGHT TO THE
ATTENTION OF THE ARCHITECT.
7. DO NOT SCALE DRAWINGS. VERIFY DISCREPANCIES WITH
ARCHITECT.
8. CONTRACTOR TO COORDINATE ALL OPERATIONS: INCLUDING SITE
ACCESS/BARRICADES, MATERIAL STORAGE, STAGING, TEMPORARY
AND UTILITIES
9. CONTRACTOR TO OBTAIN ANY OTHER PERMITS AS REQUIRED TO
COMPLETE THE PROJECT.
10. DETAILS SHOWN ARE TYPICAL AND WILL APPLY UNLESS OTHERWISE
NOTED. DETAILS OF CONSTRUCTION NOT FULLY SHOWN ARE TO BE
OF THE SAME NATURE AS THOSE DRAWN FOR SIMILAR CONDITIONS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WEATHER
PROOFING TO CONSTRUCT A WATERPROOF TIGHT STRUCTURE. ALL
WATERPROOFING SUCH AS FLASHING SIDING AND ROOFING SHALL
BE CONSTRUCTED PER MANUFACTURERS INSTRUCTIONS AND BY
INDUSTRY STANDARDS
12. ANY DISCREPANCY WITH STRUCTURAL DRAWINGS, THEN
STRUCTURAL SHALL SUPERSEDE.
MISCELLANEOUS REQUIREMENTS
1. ALL EXPOSED WOOD TO BE 6" FROM SOIL
2. WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED
OR SEPARATED FORM CONCRETE.
3. SAFETY GLAZING SHALL BE INSTALLED IN ALL WINDOWS WITHIN 24"
OF DOOR, WITHIN DOORS, WITHIN 5' TO STAIRS BELOW 5' AND
BELOW 5' OF TUB/ SHOWER.
4. GUARD RAILS SHALL BE 36" ABOVE FINISHED FLOOR WITH MAX OF 4"
BETWEEN OPENING. STRUCTURAL CONNECTIONS PER STRUCTURAL
PLANS.
FOUND MAG NAIL
WITH WASHER
FOUND 1" IRON i "EMERALD 30581"
LS 12055 & 22969' PIPE, 0.95'(S)
9 \ 0.1'(N) OF PROP. OF PROP. LINE
\ CORNER
142.28 i i o
o
W PERVIOUS
UP R
DECK 124 SF, \ \ \ \ \ \ \ \ '
NO GROUND 1 �� �p N �, �. �� �I v
DISTURBANCE EXIST. 1 \ I \
HOUSE
TO REMAIN
EXISTING \ I I I \
SIDE SEWER
I
al was
as-_
I \
\ 59�
J o
�o
7. I
ZONING CODE
ZONE RS12
SETBACKS:
STREET 25'
REAR 25'
SIDE SETBACK 10'
NEW DECK WITHIN EXISTING FOOTPRINT NO CHANGE
TO SETBACKS
HEIGHT LIMIT
MAX ALLOWED 25'
NEW DECK UNDER EXISTING ROOF HEIGHT
LOT COVERAGE
ALLOWED 35%
DECK WITHIN EXISTING FOOTPRINT - NO CHANGE
Zone RS-12 Corner
Flag _X_
Setbacks: Required
Actual
Front
Sides 10,
ok
Rear
Other
Height 25'
ok
No change to setbacks for upper deck
FOUND 1 /2" REBAR
& CAP MARKED
"LS 12055 & 22969",
0.2'(N) & 0.4'(W) OF
PROP. CORNER
L
EXISTING STORM DRAIN
CONTROL STRUCTURE
-EXISTING DECK: REPLACE BOARDS WITH
TREX DECKING & NEW RAILING 425 SF
EX. ROOF DRAIN CONNECTION,
NO CHANGE, TYP
F 1 2
REBAR &CAP
S FOUND 1/2"--,
\ \/ �' REBAR & CAP
\ % MARKED "19631"
(ON-LINE)
I
/ h
A On
CD
��I
SEWER LINE
♦` N, n M I
10' SEWER EASEMENT
U FOUND 1/2" REBAR
& CAP "22969 L&A"
(ON-LINE, 0.74'(NE)
OF PROP. CORNER)
SITE PLAN
NORTH
SCALE: 1"=20'-0"
i
WATER VALVE AND
LINE TO HOUSE
DRAWING INDEX
A1.0
SITE PLAN, PROJECT DATA, NOTES
A1.1
BMP DETAILS
A2.0
PLANS
A3.0
ELEVATIONS
SURVEY
SURVEY
S-1
STRUCTURAL NOTES AND SPECIFICATIONS
S-2
FRAMING PLANS, DETAILS AND CALCULATIONS
CONTACTS
OWNER STRUCTURAL ENGINEER
MARY DAVIS b2 STRUACTURAL ENGINEERS
18504 OLYMPIC VIEW DRIVE 15306 61ST PLACE NE
EDMONDS, WA 98020 KENMORE, WA 98028
206-755-9998 425-318-0031
ARCHITECT
EK ARCHITECTURE
ESTER KATSAROS
5531 34TH AVE NE
SEATTLE WA 98105
206-724-9415
PROJECT INFORMATION
SITE ADDRESS
18504 OLYMPIC VIEW DR
EDMONDS, WA 98020
SCOPE OF WORK
ADDITION OF AN EXTERIOR UPPER FLOOR DECK OVER AN EXITING DECK. AND
WATERPROOF MEMBRANE AND NEW RAILING TO EXISTING MAIN FLOOR DECK, ALL
DRAINAGE TO THE EXISTING DOWNSPOUT AND DRAINAGE SYSTEM, NO GROUND
DISTURBANCE
LEGAL DESCRIPTION
SEE SITE
TAX LOT NUMBER
00 434600020 1300
CONSTRUCTION TYPE
VB
OCCUPANCY
R-3
LOT SIZE
0.43 ACRES
wr%r-w0%
NEW DECK AREA: 124 SF
WATER METER AT
OLYMPIC VIEW DRIVE
LEGAL DESCRIPTION:
v� v
EXISTING DRIVEWAY PARCEL A:
LOT 13 BLOCK B, EDMONDS SEA VIEW TRACTS, ACCORDING TO PLAT THEREOF RECORDED IN VOLUME 3
OF PLATS, PAGE 76, RECORDS OF SNOHOMISH COUNTY, WASHINGTON;
EXISTING STORM DRAIN TOGETHER WITH VACATED OCEAN AVENUE, LYING WESTERLY AND ADJACENT THERETO, AND;
TOGETHER WITH THAT PORTION OF LOT 2, BLOCK 2, SEAHURST, ACCORDING TO THE PLAT THEREOF
RECORDED IN VOLUME 9 OF PLATS, PAGE 90, RECORDS OF SNOHOMISH COUNTY, WASHINGTON,
DESCRIBED AS FOLLOWS:
BEGINNING AT THE SOUTHWEST CORNER OF SAID LOT 2;
THENCE NORTH 89°42'00" EAST ALONG THE SOUTH LINE OF SAID LOT2,
A DISTANCE OF 103.95 FEET;
THENCE NORTH 62°13'00 WEST, A DISTANCE OF 69.00 FEET;
THENCE NORTH 75"43'44" WEST, A DISTANCE OF 18.09 FEET TO POINT ON THE WESTERLY LINE OF SAID
LOT 2, 45.00 FEET NORTHEASTERLY OF THE SOUTHWEST CORNER OF SAID LOT 2;
THENCE SOUTH 34"19'00" WEST, ALONG THE WESTERLY LINE OF SAID LOT 2,
A DISTANCE OF 45.00 FEET TO THE POINT OF BEGINNING.
(ALSO KNOWN AS PARCEL 1 OF CITY OF EDMONDS BOUNDARY LINE ADJUSTMENT NO. S-946, RECORDED
UNDER RECORDING NO. 9404180612);
PARCEL B:
AN EASEMENT FOR INGRESS AND EGRESS AS SET FORTH IN INSTRUMENTS RECORDED UNDER
RECORDING NOS. 1130646, 1130647, 1130648 AND 8301200195.
SITUATE IN THE CITY OF EDMONDS, COUNTY OF SNOHOMISH, STATE OF WASHINGTON.
APN: 004344600201300
EASEMENT AGREEMENT FOR BENEFICIAL ACCESS AND THE TERMS AND CONDITIONS THEREOF:
RECORDING NOS.: 1109417, 1130646, 1130647 AND 1130648
REGARDING: MAINTENANCE
ECA
LANDSLIDE HAZARD AREA
PER ECDC 23.40.220(C) MODIFICATION TO
STRUCTURE ALLOWED IN CRITICAL AREA,
CRITICAL AREA REGULATIONS ACTIVATED
WITH GROUND DISTURBANCE, NO
GROUND DISTURBANCE THIS PROJECT
NKI
ARCHITECTURE
ARCHITECT:
EK ARCHITECTURE
Ester Katsaros
5531 34th Ave NE
Seattle, WA 98105
206-724-9415
ester@E-Karchitecture.com
CLIENT:
MARY DAVIS
18504 OLYMPIC VIEW DRIVE
EDMONDS, WA 98020
206-755-9998
11703 REGISTERED
ARCHITECT
E TE K AROS
STATE OF WASHINGTON
RES U B
Aug 26 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
\W
I..L
O
W N
co
U�
UJ Q
0-
w
v'
J 0
-0z
>�0
Q
0 W
DATE: 12 SEPT. 2023
23 FEBRUARY 2024
22 AUGUST 2024
SITE PLAN,
PROJECT DATA
& NOTES
A1.0
CITY OF EDMONDS
PUBLIC WORKS
DEPARTMENT
CATCH BASIN
GRATE
FILTER SOCK WITH
OVER FLOW HOLES
(TYP)
CATCH BASIN
NOTES:
1. CONTRACTOR/DEVELOPER SHALL MAINTAIN
THIS APPLICATION AT ALL TIMES DURING
CONSTRUCTION PERIOD.
2. ANY SEDIMENT IN CATCH BASIN INSERT
SHALL BE REMOVED WHEN INSERT IS
ONE-THIRD FULL.
3. CITY INSPECTION REQUIRED ON ALL
EROSION CONTROL METHODS BEFORE
OTHER WORK CAN BEGIN.
TEMPORARY
SEDIMENT TRAP
FOR CATCH BASINS
APPROVED BY: R. ENGLISH
REVISION DATE
JANUARY 2018
STANDARD
DETAIL
ER-902
2" x 2" WOOD/STEEL
FILTER FABRIC SECURED
TO 2" x 2" 14 GA
WIRE FABRIC EQUAL
N
NATIVE BACKFILL MATERIAL
FILTER FABRIC MATERIAL IN CONTINOUS ROLLS
USE STAPLES OR WIRE RINGS TO ATTACH
FABRIC TO WIRE
2" x 2" WOOD/STEEL POSTS -\
WIRE MESH of I I FACE
OPORT FILTER
FABRIC
BURY BOTTOM OF FILTER
co
N MATERIAL 8" TO 12"
NOTES:
1. CONTRACTOR/DEVELOPER SHALL MAINTAIN AND ENSURE PROPER
EROSION CONTROL THROUGHOUT PROJECT.
2. SILT FENCE TO BE PLACED DOWNSLOPE OF CONSTRUCTION
ACTIVITY.
S t . 18y"
CITY OF EDMONDS
PUBLIC WORKS
DEPARTMENT
CITY INSPECTION REQUIRED ON
ALL EROSION CONTROL METHODS
BEFORE OTHER WORK CAN BEGIN
FILTER FABRIC FENCE
FILTRATION SYSTEMS
APPROVED BY: R. ENGLISH
REVISION DATE
JANUARY 2018
STANDARD
DETAIL
ER-900
EEi-i KI
ARCHITECTURE
ARCHITECT:
EK ARCHITECTURE
Ester Katsaros
5531 34th Ave NE
Seattle, WA 98105
206-724-9415
ester@E-Karchitecture.com
CLIENT:
MARY DAVIS
18504 OLYMPIC VIEW DRIVE
EDMONDS, WA 98020
206-755-9998
11703 REGISTERED
ARCHITECT
E TE K ARCS
STATE OF WASHINGTON
RES U B
Aug 26 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
W
0
O
W CV
— ono
U�
ui-a
o�
�U)
�Jo
-0z
> 'q-0
Qc)75;
Loo
0 °w
DATE: 12 SEPT. 2023
0 23 FEBRUARY 2024
1
BMP
DETAILS
A . 1.1
EXI
TO
DE(
STF
Q LOWER FLOOR PLAN Q MAINFLOOR PLAN Q
NORTH SCALE: 1/4" = 1'-0"
NORTH SCALE: 1/4" = V-0° NORTH
UPPER FLOOR PLAN
SCALE: 1/4" = V-0"
E EK
ARCHITECTURE
ARCHITECT:
EK ARCHITECTURE
Ester Katsaros
5531 34th Ave NE
Seattle, WA 98105
206-724-9415
ester@E-Karchitecture.com
CLIENT:
MARY DAVIS
18504 OLYMPIC VIEW DRIVE
EDMONDS, WA 98020
206-755-9998
11703 REGISTERED
ARCHITECT
E TE K AROS
STATE OF WASHINGTON
RES U B
Aug 26 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
W
0
� o
W N
- 0000
U�
w-�
o�
�U)
Lf)
O Oz
> 'ql-o
QC) 75;
Lon
0 °W
DATE: 12 SEPT. 2023
23 FEBRUARY 2024
A 22 AUGUST 2024
PLANS
A2.0
'TING
'ER CEILING
:)TING
'ER FLOOR OL
'TING
V FLOOR
TING
'ER FLOOR OL
WEST ELEVATION
SCALE: 1/4" = V-0"
GUARDRAIL NOTES
CABLE RAILS
INSTALL PER
MANUF.
INSTRUCTION
MAX OPENING OF 4"
AT RAILINGS, TYP.
NEW CLEARVIEW RAILING
POST SYSTEM
ATTACHMENTS PER
STRUCTURAL
NEW 2X12 FASCIA 2
NEW POST BEYOND
PER STRUCTURAL
- GUARDS WHERE SHOWN ON PLANS, MIN 36"
HEIGHT AND MAX 4" OPENING IN BALUSTERS, TYP
- GUARDRAIL DESIGNED TO RESIST A 200 LB.
CONCENTRATED LOAD ON THE TOP RAIL AND 50
GUARD RAIL POSTS PSF ON ALL GUARDRAIL INFILL COMPONENTS
SCALE: 1" = 1'-0"
JIKUUIUKHL
SOUTH ELEVATION
SCALE: 1/4" = V-0"
EXISTING
UPPER CEILING
EXISTING
UPPER FLOOR OIL
EXISTING
MAIN FLOOR OIL
EXISTING
LOWER FLOOR
E EK
ARCHITECTURE
ARCHITECT:
EK ARCHITECTURE
Ester Katsaros
5531 34th Ave NE
Seattle, WA 98105
206-724-9415
ester@E-Karchitecture.com
CLIENT:
MARY DAVIS
18504 OLYMPIC VIEW DRIVE
EDMONDS, WA 98020
206-755-9998
11703 FREGISTERED
ARCHITECT
E TE KA AROS
STATE OF WASHINGTON
RESUB
Aug 26 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
W
O
W 5; 00
U�
W �
I..L
0 ` U�
)
f)
J 0
LOz
> 'ql-O
C
Lo 0
=' W
DATE: 12 SEPT. 2023
23 FEBRUARY 2024
0 22 AUGUST 2024
ELEVATIONS
A3.0
INTERNATIONAL BUILDING CODE (IBC
LOADINGS
ROOF SNOW LOAD .....................................................
RESIDENTIAL LIVE LOAD ......................................
DECK, BALCONY, PLATFORM LIVE LOAD .......................
RETAIL, CORRIDOR, LOBBY, WALKWAY LIVE LOAD
.............
OFFICE LIVE LOAD......................................................................
PARKING LIVE LOAD ..................................
WIND CRITERIA
BUILDING CLASSIFICATION ...............................
/1
ULTIMATE WIND SPEED (3 SEC GUST) MPH......
97MPH
WIND EXPOSURE ...........................................
B
TOPOGRAPHIC FACTOR, Kzt.................
1.0
SEISMIC CRITERIA
SEISMIC RISK CATEGORY ...............................
11
SPECTRAL RESPONSE COEFFICIENT, Ss ....
1.299
SPECTRAL RESPONSE COEFFICIENT, S1 ....
0.459
SEISMIC SITE CLASS .................................
D
SEISMIC DESIGN CATEGORY ...............................
D
DUCTILITY (R) ...............................
6.5
METHOD AND BASE SHEAR ...............................
ELF
FOUNDATION DESIGN INFORMATION
2018
CONCRETE AND REINFORCING SPECIFICATIONS
STRUCTURAL STEEL, BOLTING AND WELDING SPECIFICATIONS
DRAWING LIST
structural25
PSF
1. CONCRETE SHALL CONFORM TO THE INDICATED REFERENCE CODES AND STANDARDS
1.
ALL EXPOSED STEEL MEMBERS, HARDWARE, FASTENERS SHALL BE HOT DIPPED GALVANIZED OR EPDXY PAINTED PER
E
SHEET NUMBER
SHEET NAME
ISSUE DATE
40 PSF
EXCEPT AS MODIFIED BELOW:
ARCHITECT REQUIREMENTS. ALL CUT, REPAIRED AND EXPOSED SURFACE SHALL BE PAINTED WITH (2) COAT OF 95
60 PSF
ACI-301 - "STANDARD SPECIFICATIONS FOR STRUCTURAL CONCRETE"
ZINC RICH PAINT PER ASTM A780. COLOR TO MATCH EXISTING.
S-0
GENERAL NOTES AND
08/23/24
info@b2engineers.com
100 PSF
ACI-318 - "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE"
"HOT
2.
STEEL SHALL CONFORM TO THE FOLLOWING STANDARDS:
SPECIFICATIONS
425-318-%O47 (0)
50 PSF
-- WEATHER CONCRETING"
ACI305R
"COLD
TUBE COLUMNS: ASTM A500, GRADE B (Fy = 46 KSI)
S-1
FRAMING PLANS AND DETAILS
08/23/24
40 PSF & 3000# WHEEL LOAD
ACI-306R - WEATHER CONCRETING"
WIDE FLANGE COLUMNS OR BEAMS: ASTM 572 GR50
425-318-0031 (C)
ACI-304 - "GUIDE FOR MEASURING, MIXING, TRANSPORTING AND PLACING CONCRETE"
Grand total: 2
STEEL PIPES: ASTM A53, TYPE E OR S, GRADE B (Fy - 35 KSI.)
2. CONCRETE COMPRESSIVE STRENGTH REQUIREMENTS (PSI)
STEEL PLATES, ANGLES AND MISC: ASTM A36 (Fy = 36 KSI) OR ASTM A992
BEARING BOLTS: ASTM A325
LOCATION f'c AT 28 DAYS W/C RATIO AIR CONTENT ADMIXTURES REQUIREMENTS
SLIP CRITICAL BOLTS: ASTM A325 WITH LOCK WASHERS
ANCHOR BOLTS: ASTM A307 (WOOD FRAMING)
FOOTING 2500 PSI (MIN. OF 5 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE)
ANCHOR BOLTS: ASTM A325 (STEEL FRAMING)
SLAB ON GRADE 2500 PSI (MIN. OF 5 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE)
FOUNDATION WALL 2500 PSI (MIN. OF 5 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE)
3.
ALL SLIP CRITICAL CONNECTIONS SHALL BE ASTM A325 BOLTS AND SHALL BE ENGINEER -APPROVED, SELF -LOAD
COLUMN NA
INDICATING TYPES, AND SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
POST TENSIONED BLDG SLAB NA
POST TENSIONED PARKING SLAB NA
4.
STRUCTURAL STEEL WELDING SHALL CONFORM TO THE AWS CODES D1.1 AND D1.3.
TOPPING NA
ALL WELDING SHALL CONFORM TO THE AWS CODES AND STRUCTURAL DRAWINGS, AND SHALL BE PERFORMED BY
SHOTCRETE NA
CERTIFIED WELDERS USING DRY E70XX ELECTRODES
WELDS NOT SPECIFIED SHALL BE 1/4" CONTINUOUS FILLET MINIMUM. INCREASE WELD SIZE TO AWS MINIMUM SIZES,
3. PROVIDE GRADE 60 KSI (A615) FOR CONCRETE REINFORCING
BASED ON PLATE THICKNESS.
4. TOTAL AIR CONTENT IS SPECIFIED IN THE TABLE ABOVE. AIR CONTENT TOLERANCE SHALL BE ± 1 % AND SHALL BE MEASURED
AT THE POINT OF PLACEMENT. ALL CONCRETE EXPOSED TO THE WEATHER SHALL HAVE 5% TOTAL AIR REQUIRED.
1. STRUCTURAL DESIGN, DRAINAGE, SUBGRADE PREP. SHALL COMPLY WITH SOIL REPORT
NA
DEEP FOUNDATION SYSTEM: NA
FOOTING BEARING PRESSURE: 1500 PSF (ASSUMED)
ACTIVE/PASSIVE EARTH PRESSURE: 35 PCF (ASSUMED)
2. ADDITIONAL NOTES/ REQUIREMENTS:
NA
GENERAL CONDITIONS
1. THE CONTRACTOR SHALL EXAMINE THE STRUCTURAL DRAWINGS AND SHALL NOTIFY THE
STRUCTURAL ENGINEER IN WRITING OF ANY DISCREPANCIES HE MAY FIND BEFORE PROCEEDING
WITH THE WORK. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS AND SITE
CONDITIONS BEFORE STARTING WORK.
2. ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE WORKING
DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE STRUCTURAL
ENGINEER BEFORE PROCEEDING WITH ANY WORK SO INVOLVED.
3. SPECIFIC NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND
TYPICAL DETAILS. WHERE THE NOTES, DRAWINGS, AND/OR SPECIFICATIONS DIFFER, THE MORE
STRINGENT REQUIREMENT SHALL APPLY.
4. IF A SPECIFIC DETAIL IS NOT SHOWN FOR ANY PART OF THE WORK, THE CONSTRUCTION
SHALL BE THE SAME AS FOR SIMILAR WORK.
5. WORKING DIMENSIONS SHALL NOT BE SCALED FROM PLANS, SECTIONS, OR DETAILS ON
THESE DRAWINGS.
6. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT AND THE STRUCTURAL
ENGINEER OF ANY CONDITION THAT, IN HIS OPINION, MIGHT ENDANGER THE STABILITY OF THE
STRUCTURE OR CAUSE DISTRESS TO THE STRUCTURE.
7. THE CONTRACTOR SHALL SUPERVISE AND DIRECT HIS WORK AND HE SHALL BE SOLELY
RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND
PROCEDURES. PROVIDE ADEQUATE SHORING AND BRACING OF ALL STRUCTURAL MEMBERS
DURING CONSTRUCTION. NOTIFY ENGINEER OF ALL FIELD CHANGES PRIOR TO INSTALLATION.
8. REFER TO THE ARCHITECTURAL DRAWINGS FOR INFORMATION NOT COVERED BY THESE
GENERAL NOTES OR THE STRUCTURAL DRAWINGS.
9. ALL CONSTRUCTION SHALL BE DONE WITH MATERIALS, METHODS, AND WORKMANSHIP
ACCEPTED AS GOOD PRACTICE BY THE CONSTRUCTION INDUSTRY AND IN CONFORMANCE WITH
THE PROVISIONS OF PREVAILING CODE EDITION OF THE "INTERNATIONAL BUILDING CODE" (IBC)
AND STANDARDS REFERENCED THEREIN.
10. PIPES, DUCTS, SLEEVES, OPENINGS, POCKETS, CHASES, BLOCK -OUTS, ETC., SHALL NOT
BE PLACED IN SLABS, FOUNDATIONS, ETC., NOR SHALL ANY STRUCTURAL MEMBER BE CUT FOR
SUCH ITEMS, UNLESS SPECIFICALLY DETAILED ON THESE STRUCTURAL DRAWINGS.
11. STRUCTURAL ENGINEER WILL PERFORM PERIODIC STRUCTURAL OBSERVATION DURING
CONSTRUCTION OF STRUCTURAL MEMBERS AND REVIEW OF REQUESTED SUBSTITUTIONS
SHOP DRAWINGS AND SUBMITTALS:
THE FOLLOWING ITEMS SHALL BE SUBMITTED FOR REVIEW PRIOR TO FABRICATION OR INSTALL.
CONTRACTOR SHALL ALLOW SUFFICIENT TIME FOR STRUCTURAL ENGINEER'S REVIEW:
1. SLAB CONDUIT LAYOUT
2. CONCRETE OR MASONRY MIX DESIGN
3. CONCRETE OR MASONRY REINFORCING
4. CONCRETE POST TENSIONING SYSTEM
4. FORMWORK
5. CONCRETE CURING PROCEDURE
6. STRUCTURALSTEEL
7. STUD RAILS AND HEADED ANCHOR EMBED PLATES
8. WOOD FRAMING/ LUMBER PACKAGE
9. SEISMIC HOLDOWN SYSTEM SUCH AS SIMPSON PRODUCTS
DEFERRED SUBMITTALS:
THE FOLLOWING ITEMS SHALL BE SUBMITTED FOR REVIEW PRIOR TO FABRICATION OR INSTALL
1. ANCHORAGE OF NONSTRUCTURAL COMPONENTS
2. CANOPIES AND BALCONIES
3. CURTAIN WALLS
4. EXTERIOR CLADDING
5. HANDRAIL AND GUARDRAIL ASSEMBLIES
6. HEAVY HUNG FIXTURES
7. MECHANICAL EQUIPMENT SUPPORT, SEISMIC ANCHORAGE OR RESTRAINING SYSTEM
8. STEEL STAIRS
9. WINDOW WASHING AND FALL PROTECTION SYSTEMS
LUMBER. ANCHOR BOLTING AND NAILING SPECIFICATIONS
1. MEET REQUIREMENTS OF PS 20-70 AND NATIONAL GRADING RULES FOR SOFTWOOD
DIMENSIONAL LUMBER, BEARING STAMP OF WWPA. ALL EXPOSED LUMBER SHALL BE
PRESSURE TREATED OR EXTERIOR GRADE
2. LUMBER GRADES TO BE (UNLESS
NOTED OTHERWISE ON PLAN):
WALL STUDS, 2X, 3 X........
HF STUD GRADE
WALL PLATES, 2X, 3X........
HF STANDARD GRADE U.N.O
JOISTS, 2 X 6: .............
HF #2
JOISTS, 2 X 8 AND UP.......
DF #2
BEAMS, HEADERS, 6X ........
DF #2
BEAMS, HEADERS, 4X.........
DF #2, WWPA GRADING
POSTS, 4X, 6X..............
DF #2 U.N.O
LUMBER NOT NOTED HERE...
DF #2 U.N.O
GLULAM BEAMS
WESTERN SPECIES 24F-V4
PSL/LVL BEAMS
2.0E OR HIGHER
3. ALL SILLS OR PLATES RESTING ON CONCRETE OR MASONRY THAT IS IN CONTACT WITH OR
RESTING ON FOUNDATIONS SHALL BE PRESSURE -TREATED DOUGLAS FIR/ HEMFIR IN
ACCORDANCE TO WITH AWPA U1 (PLANT/SHOP TREATMENT) AND M4 (FIELD TREATMENT)
STANDARDS. ALL BEARING WALL PLATES SHALL HAVE 5/8" O x10" J-BOLTS PLACED AT MAXIMUM
OF 9" FROM THE END OF A PLATE AND SPACED AT INTERVALS SHOWN ON THE SHEARWALL
SCHEDULE (MAXIMUM 48" OC SPACING). PROVIDE BP/BPS PLATE WASHER AT ALL FOUNDATION
SILL PLATE ANCHOR BOLTS. PROVIDE TWO ANCHOR BOLTS MINIMUM PER SECTION OF SILL.
FOR NON-SHEARWALL, PLACE ANCHORS AT 48". BOLTS IN WOOD SHALL NOT BE LESS THAN 7
DIAMETERS FROM THE END AND 4 DIAMETERS FROM THE EDGE OF THE MEMBER.
4. NAILS: COMMON WIRE NAILS. NAILING IN ACCORDANCE WITH IBC TABLE 2304.9.1
5. PRESSURE TREATED WOOD: ALL NAILS INTO PT WOOD SHALL BE HOT DIPPED GALVANIZED
PER ASTM A153 OR STAINLESS STEEL. ALL METAL CONNECTORS IN CONTACT WITH PT WOOD
SHALL BE HOT DIPPED GALVANIZED AND MEET ASTM A653 CLASS G185 (1.85 OZ OF ZINC PER SQ
FT MINIMUM) OR TYPE 304 / 316 STAINLESS STEEL SIMPSON Z-MAX CONNECTORS MEET THIS
REQUIREMENT. FASTENERS AND CONNECTORS USED TOGETHER SHALL BE OF THE SAME TYPE
(E.G. HOT DIPPED NAILS WITH HOT DIPPED HANGERS)
6. ALL LUMBER WITH A LEAST DIMENSION OF 2" (NOMINAL) SHALL BE STAMPED "SURFACE -DRY"
AND SHALL HAVE A MOISTURE CONTENT WHEN SURFACED AND WHEN INSTALLED OF NO MORE
THAN 19 PERCENT. LUMBER WITH A LEAST DIMENSION OF 4" (NOMINAL) OR GREATER SHALL BE
STAMPED "SURFACE -GREEN" AND AIR-DRIED TO A MOISTURE CONTENT OF NOT MORE THAN 19
PERCENT PRIOR TO ITS USE IN FRAMING THE STRUCTURE.
7. NOTCHING AND BORING OF BEAMS AND JOISTS IS NOT ALLOWED WITHOUT PRIOR APPROVAL
OF THE STRUCTURAL ENGINEER OF RECORD.
REQUIRED? SPECIAL INSPECTIONS (PART 1) TYPE OF INSPECTION
NO 1704.2.5 INSPECTION OF FABRICATORS PERIODIC
Verify fabrication/quality control procedures
NO 1705.1.1 SPECIAL CASES CONTINUOUS
(work unusual in nature, including but not limited to alternative materials and systems, unusual
design applications, materials and systems with special manufacturer's requirements)
NO
1705.2 STEEL CONSTRUCTION
1. Fabricator and erector documents (Verify reports and certificates as listed in AISC 360, chapter
EACH SUBMITTAL
N, paragraph 3.2 for compliance with construction documents)
2. Material verification of structural steel
PERIODIC
3. Embedments (Verify diameter, grade, type, length, embedment. See 1705.3 for anchors)
CONTINUOUS
4. Verify member locations, braces, stiffeners, and application of joint details at each connection
PERIODIC
comply with construction documents
5. Structural steel welding:
a. Inspection tasks Prior to Welding (Observe, or perform for each welded joint or member, the QA
OBSERVE OR PERFORM AS NOTED (4)
tasks listed in AISC 360, Table N5.4-1)
b. Inspection tasks During Welding (Observe, or perform for each welded joint or member, the QA
OBSERVE (4)
tasks listed in AISC 360, Table N5.4-1)
c. Inspection tasks After Welding (Observe, or perform for each welded joint or member, the QA
OBSERVE OR PERFORM AS NOTED (4)
tasks listed in AISC 360, Table N5.4-3)
d. Nondestructive testing (NDT) of welded joints: see Commentary
1) Complete penetration groove welds 5/16" or greater in risk category III or IV
PERIODIC
2) Complete penetration groove welds 5/16" or greater in risk category II
PERIODIC
3) Thermally cut surfaces of access holes when material t > 2"
PERIODIC
4) Welded joints subject to fatigue when required by AISC 360, Appendix 3, Table A-3.1
PERIODIC
5) Fabricator's NDT reports when fabricator performs NDT
EACH SUBMITTAL (5)
6. Structural steel bolting:
a. Inspection tasks Prior to Bolting (Observe, or perform tasks for each bolted connection, in
OBSERVE OR PERFORM AS NOTED (4)
accordance with QA tasks listed in AISC 360, Table N5.6-1)
b.lnspection tasks During Bolting (Observe the QA tasks listed in AISC 360, Table N5.6-2)
OBSERVE (4)
1) Pre -tensioned and slip -critical joints
a) Turn -of -nut with matching markings
PERIODIC
b) Direct tension indicator
PERIODIC
c) Twist -off type tension control bolt
PERIODIC
d) Turn -of -nut without matching markings
CONTINUOUS
e) Calibrated wrench
CONTINUOUS
2) Snug -tight joints
PERIODIC
c. Inspection tasks After Bolting (Perform tasks for each bolted connection in accordance with QA
PERFORM (4)
tasks listed in AISC 360, Table N5.6-3)
7. Inspection of steel elements of composite construction prior to concrete placement in accordance
OBSERVE OR PERFORM AS NOTED (4)
with QA tasks listed in AISC 360, Table N6.1
NO
1705.2.2 STEEL CONSTRUCTION OTHER THAN STRUCTURAL STEEL
1. Material verification of cold -formed steel deck:
a. Identification markings
PERIODIC
b. Manufacturer's certified test reports
EACH SUBMITTAL
2. Connection of cold -formed steel deck to supporting structure:
a. Welding
PERIODIC
b. Other fasteners (in accordance with AISC 360,Section N6)
1) Verify fasteners are in conformance with approved submittal
PERIODIC
2) Verify fastener installation is in conformance with approved submittal and manufacturer's
PERIODIC
recommendations
3. Reinforcing steel
a. Verification of weldability of steel other than ASTM A706
PERIODIC
b. Reinforcing steel resisting flexural and axial forces in intermediate and special moment frames,
CONTINUOUS
boundary elements of special concrete structural walls and shear reinforcement
c. Shear reinforcement
CONTINUOUS
d. Other reinforcing steel
PERIODIC
4. Cold -formed steel trusses spanning 60 feet or greater
a. Verify temporary and permanent restraint/bracing are installed in accordance with the approved
PERIODIC
truss submittal package
NO
1705.3 CONCRETE CONSTRUCTION
1. Inspection of reinforcing steel installation (see 1705.2.2 for welding)
P1
2. Inspection of prestressing steel installation
PERIODIC
3. Inspection of anchors cast in concrete where allowable loads have been increased per section
CONTINUOUS
1908.5 or where strength design is used
4. Verify use of approved design mix
P1
5. Fresh concrete sampling, perform slump and air content tests and determine temperature of
CONTINUOUS
concrete
6. Inspection of concrete and shotcrete placement for proper application techniques
CONTINUOUS
7. Inspection for maintenance of specified curing temperature and techniques
P4
8. Inspection of prestressed concrete:
a. Application of prestressing force
CONTINUOUS
b. Grouting of bonded prestressing tendons in the seismic -force -resisting system
CONTINUOUS
9. Erection of precast concrete members
P4
a. Inspect in accordance with construction documents
SEE CONST. DOCUMENTS
b. Perform inspections of welding and bolting in accordance with Section 1705.2
ACCORDING TO SECTION 1705.2
10. Verification of in -situ concrete strength, prior to stressing of tendons in post tensioned concrete
P4
and prior to removal of shores and forms from beams and structural slabs
11. Inspection of formwork for shape, lines, location and dimensions
P1
12. Concrete strength testing and verification of compliance with construction documents
P4
POST INSTALLED ANCHORS /N HARDENED CONCRETE
Per research reports including verification of anchor type, anchor dimensions, hole dimensions, hole
P2 OR AS REQUIRED
cleaning procedures, anchor spacing, edge distances, concrete minimum thickness, anchor
BY THE APPROVED REPORT
embedment and tightening torque
INSPECTION NOTES:
REQUIRED? SPECIAL INSPECTIONS (PART 2)
NO 1705.4 MASONRY CONSTRUCTION
(A) Level A, B and C Quality Assurance:
1. Verify compliance with approved submittals
(B) Level B Quality Assurance:
1. Verification of f'm and fAAC prior to construction
(C) Level C Quality Assurance:
1. Verification of f'm and fAAC prior to construction and for every 5,000 SF during construction
2. Verification of proportions of materials in premixed or preblended mortar, prestressing grout, and
grout other than self -consolidating grout, as delivered to the project site
3. Verify placement of masonry units
(D) Levels B and C Quality Assurance:
1. Verification of Slump Flow and Visual Stability Index (VSI) of self -consolidating grout as delivered
to the project
2. Verify compliance with approved submittals
3. Verify proportions of site -mixed mortar, grout and prestressing grout for bonded tendons
4. Verify grade, type, and size of reinforcement and anchor bolts, and prestressing tendons and
anchorages
5. Verify construction of mortar joints
6. Verify placement of reinforcement, connectors, and prestressing tendons and anchorages
7. Verify grout space prior to grouting
8. Verify placement of grout and prestressing grout for bonded tendons
9. Verify size and location of structural masonry elements
10. Verify type, size, and location of anchors, including details of anchorage of masonry to structural
members, frames, or other construction.
11. Verify welding of reinforcement (see 1705.2.2)
12. Verify preparation, construction, and protestion of masonry during cold weather (temperature
below 40 F) or hot weather (temperature above 90 F)
13. Verify application and measurement of prestressing force
14. Verify placement of AAC masonry units and construction of thin -bed mortar joints (first 5000 SF
of AAC masonry)
15. Verify placement of AAC masonry units and construction of thin -bed mortar joints (after the first
5000 SF of AAC masonry)
16. Verify properties of thin -bed mortar for AAC masonry (first 5000 SF of AAC masonry)
17. Verify properties of thin -bed mortar forAAC masonry (after the first 5000 SF of AAC masonry)
18. Prepare grout and mortar specimens
19. Observe preparation of prisms
NO 1705.5 WOOD CONSTRUCTION
1. Inspection of the fabrication process of wood structural elements and assemblies in accordance
with Section 1704.2.5
2. For high -load diaphragms, verify grade and thickness of structural panel sheathing agree with
approved building plans
3. For high -load diaphragms, verify nominal size of framing members at adjoining panel edges, nail
or staple diameter and length, number of fastener lines, and that spacing between fasteners in each
line and at edge margins agree with approved building plans
4. Metal -plate -connected wood trusses spanning 60 feet or greater: verify temporary and permanent
restraint/bracing are installed in accordance with the approved truss submittal package
NO 1705.6 SOILS
1. Verify materials below shallow foundations are adequate to achieve the design bearing capacity.
2. Verify excavations are extended to proper depth and have reached proper material.
3. Perform classification and testing of controlled fill materials.
4. Verify use of proper materials, densities, and lift thicknesses during placement and compaction of
controlled fill
5. Prior to placement of controlled fill, observe subgrade and verify that site has been prepared
properly
NO 1705.7 DRIVEN PILE FOUNDATIONS
1. Verify element materials, sizes and lengths comply with requirements
2. Determine capacities of test elements and conduct additional load tests, as required
3. Observe driving operations and maintain complete and accurate records for each element
4. Verify placement locations and plumbness, confirm type and size of hammer, record number of
blows per foot of penetration, determine required penetrations to achieve design capacity, record tip
and butt elevations and document any damage to foundation element
5. For steel elements, perform additional inspections per Section 1705.2
6. For concrete elements and concrete -filled elements, perform additional inspections per Section
1705.3
7. For specialty elements, perform additional inspections as determined by the registered design
professional in responsible charge
8. Perform additional inspections and tests in accordance with the construction documents
NO 1705.8 CAST /N PLACE FOUNDATIONS
1.Observe drilling operations and maintain complete and accurate records for each element
2. Verify placement locations and plumbness, confirm element diameters, bell diameters (if
applicable), lengths, embedment into bedrock (if applicable) and adequate end -bearing strata
capacity. Record concrete or grout volumes
3. For concrete elements, perform additional inspections in accordance with Section 1705.3
4. Perform additional inspections and tests in accordance with the construction documents
NO 1705.9 HELICAL PILE FOUNDATIONS
1. Verify installation equipment, pile dimensions, tip elevations, final depth, final installation torque
and other data as required.
2. Perform additional inspections and tests in accordance with the construction documents
n1705.10.1 STRUCTURAL WOOD SPECIAL INSPECTIONS FOR WIND RESISTANCE
(1). The inspection and testing agent(s) shall be engaged by the Owner or the Owner's Agent, and
not by the Contractor or Subcontractor whose work is to be inspected or tested. Any conflict of
NO
interest must be disclosed to the Building Official prior to commencing work. The qualifications of
the Special Inspector(s) and/or testing agencies may be subject to the approval of the Building
Official and/or the Design Professional.
(2). The list of Special Inspectors may be submitted as a separate document, if noted so above.
(3). Special Inspections as required by Section 1704.2.5 are not required where the fabricator is
NO
approved in accordance with IBC Section 1704.2.5.2
(4). Observe on a random basis, operations need not be delayed pending these inspections.
Perform these tasks for each welded joint, bolted connection, or steel element.
(5). NDT of welds completed in an approved fabricator's shop may be performed by that fabricator
NO
when approved by the AHJ. Refer to AISC 360, N7.
LEGEND:
NO
C CONTINUOUS INSPECTION
P1 PERIODIC INSPECTION PRIOR TO CONCRETE PLACEMENT
P2 PERIODIC INSPECTION PRIOR TO INSTALLATION OF ELEMENT
P3 PERIODIC INSPECTION PRIOR TO USE ON PROJECT (ONCE ONLY)
P4 PERIODIC INSPECTION AT LEAST ONCE ADAY
P5 PERIODIC INSPECTION AFTER ELEMENT IS IN PLACE
NO
S VERIFY WITH SOILS ENGINEER
T MATERIAL TEST REQUIRED
1. Inspection of field gluing operations of elements of the main windforce-resisting system
2. Inspection of nailing, bolting, anchoring and other fastening of components within the main
windforce-resisting system
1705.10.2 COLD FORMED STEEL INSPECTIONS FOR WIND RESISTANCE
1.Inspection during welding operations of elements of the main windforce-resisting system
2. Inspections for screw attachment, bolting, anchoring and other fastening of components within the
main windforce-resisting system
1705.10.3 WIND RESISTANCE INSPECTIONS
1. Roof cladding
2. Wall cladding
1705.11.1 STRUCTURAL STEEL SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE
INSPECTION OF STRUCTURAL STEEL /N ACCORDANCE WITH AISC 341
1705.11.2 STRUCTURAL WOOD SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE
1. Inspection of field gluing operations of elements of the seismic -force resisting system
2. Inspection of nailing, bolting, anchoring and other fastening of components within the seismic -
force -resisting system
1705.11.3 COLD -FORMED STEEL LIGHT -FRAME CONSTRUCTION SPECIAL INSPECTIONS
FOR SEISMIC RESISTANCE
1. Inspection during welding operations of elements of the seismic -force -resisting system
2. Inspections for screw attachment, bolting, anchoring and other fastening of components within the
seismic -force -resisting system
TYPE OF INSPECTION
P4
PERIODIC
PERIODIC
CONTINUOUS
PERIODIC
CONTINUOUS
PERIODIC
P4
P4
P4
LEVEL B
- P4
LEVEL C
- CONTINUOUS
LEVEL B
- P4
LEVEL C
- CONTINUOUS
CONTINUOUS
P4
LEVEL B
- PERIODIC
LEVEL C
- CONTINUOUS
CONTINUOUS
P4
CONTINUOUS
CONTINUOUS
LEVEL B - PERIODIC
LEVEL C - CONTINUOUS
CONTINUOUS
LEVEL B - PERIODIC
LEVEL C - CONTINUOUS
LEVEL B - P4
LEVEL C - CONTINUOUS
LEVEL B - P4
LEVEL C - CONTINUOUS
PERIODIC
P5
P5
PERIODIC
PERIODIC
PERIODIC
PERIODIC
CONTINUOUS
PERIODIC
DAVIS TAND00
DECK
RESUB
Aug 26 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
18504 OLYMPIC VIEW
DRIVE EDMONDS, WA
98020
CONTINUOUS
CONTINUOUS
CONTINUOUS
CONTINUOUS DRAWING INFO
SEE SECTION 1705.2
SEE SECTION 1705.3 ISSUE DATE 08/23/24
SEE CONST DOCUMENTS
SEE CONST. DOCUMENTS IISSUED FOR PERMIT
CONTINUOUS PROJECT NO. 23160
CONTINUOUS
ENGINEER BB
SEE SECTION 1705.3
SEE CONST. DOCUMENTS REVISION SCHEDULE
CONTINUOUS NO. DATE DESCRIPTION
SEE CONST. DOCUMENTS
CONTINUOUS
P5
PERIODIC
PERIODIC
PERIODIC
PERIODIC
SEE AISC 341 GENERAL NOTES
CONTINUOUS AND
P5
SPECIFICATIONS
PERIODIC S-0
PERIODIC
Copyright b2 Structural Engineers 2008
__F I_F T__I _F F—f
rf—z7I L
I I I I—]
I
NEW POST TO BEAR ON EXISTING
CONCRETE FOUNDATION WALL
WITH ABU POST BASE WITH
5/8"X4" STRONG BOLT 2
EXISTING POST
AND FOOTING
TO REMAIN
ROOF OUTLINE
DECK ABOVE
n FOUNDATION/LOWER FLOOR
1/4" = 1'-0"
EXISTING FOUNDATION
TO REMAIN
MAIN FLOOR
1 /4" = 1'-0"
NEW 6X12
PT BEAM
(B-1)
6X6 PT KNEI
BRACING
(BELOW)
n UPPER FLOOR
1 /4" = 1'-0"
t 1/2" LONG
>TAGGERED W/
�ITECTURAL
GUARDRAIL TO RIM
CONNECTION BY
GUARDRAIL
MANUFACTURER
PROVIDE CCQ POST
CAP OR SIMILAR
NEW POST
PER PLAN
lSection 2
/2 11-011
NEW JOISTS
PER PLAN
PROVIDE LUS
HANGERS
(BOTH ENDS)
6X6 PT KNEE
BRACING
PROVIDE KBS1Z
(2 SIDES, TOP AND BOTTOM)
IMPORTANT NOTES ON DRAWING REVIEW, FIELD VERIFICATION, TEMPORARY SHORING
AND WATERPROOFING:
info@b2engineers.com
425-318-7047 (0)
425-318-0031 (C)
DAVIS TAND00
DECK
RESUB
Aug 26 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
18504 OLYMPIC VIEW
DRIVE EDMONDS, WA
98020
PROVIDE 2X8 PT LEDGER & 4 1/2" LONG 1. CONTRACTOR MUST REVIEW STRUCTURAL DRAWINGS PRIOR TO CONSTRUCTION &
TIMBERLOK SCREWS AT 6" STAGGERED W/ NOTIFY DESIGN TEAM/OWNER OF ANY DISCREPANCY IN COMPARISON WITH
WATERPROOFING PER ARCHITECTURAL ARCHITECTURAL DOCUMENTS OR FIELD CONDITIONS.
GUARDRAIL TO 2. IN REMODEL/RETROFIT PROJECTS, CONTRACTOR MUST FIELD VERIFY & NOTIFY DRAWING INFO
EXISTING STRUCTURE I PROVIDE DTT1Z TIE WITH 3/8"X4" RIM CONNECTION DESIGN TEAM/OWNER OF EXISTING MECHANICAL, PLUMBING, AND ELECTRICAL LINES
AND FRAMING TO REMAIN I I GALV. LAG BOLT AT 48" O.C. AND \ BY GUARDRAIL THAT MAY INTERFERE WITH STRUCTURAL WORK PRIOR TO CONSTRUCTION.
WITHIN 24" OF EACH END OF DECK MANUFACTURER STRUCTURAL DRAWINGS MAY NOT REFLECT ALL EXISTING FRAMING CONDITIONS DUE ISSUE DATE 08/23/24
a ® ®m ®® TO LIMITED AVAILABLE INFORMATION.
7 \III IIII 3. CONTRACTOR IS SOLELY RESPONSIBLE IN PROVIDING PROPER TEMPORARY SHORING
PRIOR TO REMOVING ANY STRUCTURAL ELEMENTS. 7L_� 1 ISSUED FOR PERMIT
4. ENGINEER IS NOT RESPONSIBLE FOR WATERPROOFING SYSTEM OR DETAILS.
NEW JOISTS PROVIDE LUS CONTRACTOR/OWNER SHALL CONSULT WITH QUALIFIED PROFESSIONALS AS REQUIRED
PER PLAN HANGERS
(BOTH ENDS) PROJECT N0. 23160
IMPORTANT NOTES ON FOUNDATION AND FRAMING:
NEW BEAM7 PROVIDE CCQ POST 1. ALL FOOTINGS SHALL BEAR ON SUITABLE SOIL SUCH AS AT MIN. OF MEDIUM DENSE ENGINEER BB
PER PLAN CAP OR SIMILAR NATIVE SOIL OR COMPACTED STRUCTURAL FILL TO AT LEAST 95% OF MAX. DRY
DENSITY BASED ON ASTM D1557. GEOTECHNICAL ENGINEER MAY INSPECT TO VERIFY REVISION SCHEDULE
THAT THE FOUNDATION WILL BEAR ON SUITABLE MATERIAL.
\ 6X6 PT KNEE 2. FOR FRAMING LUMBER TYPES AND GRADES, AND CONCRETE MIX REQUIREMENTS NO. DATE DESCRIPTION
NEW POST PLEASE SEE S-0
BRACING 3. FOR PLYWOOD/OSB SHEARWALL SCHEDULE & HOLDOWN ANCHOR SIZE AND
PER PLAN
EMBEDMENT, PLEASE SEE S-XX
PROVIDE KBS1Z 4. FOR COMMON HEADER FRAMING DETAIL AND HEADER SIZE, SEE S-XX
(2 SIDES, TOP 5. PROVIDE (2) 2X6 OR (3) 2X4 STUD POSTS AT EACH END OF BEAMS, UNLESS NOTED
AND BOTTOM) OTHERWISE ON PLAN
6. SLAB ON GRADE SHALL BE MIN. 4" THICK WITH #3 AT 18" EACH WAY (AT MID -DEPTH)
ON 6" COMPACTED CRUSHED ROCK. SAWCUT JOINT (1" DEEP) AT 15 FT MAX. SPACING
EACH WAY SHALL BE DONE WITHIN 4 TO 12 HOURS AFTER FINISHING, DEPENDING ON
EXISTING NEW POST TO BEAR ON WEATHER.
STRUCTURE AND EXISTING PT DECK CUT EXISTING DECK EXISTING BEAM W/ CCQ 7. FLOOR SHEATHING SHALL BE 3/4" PLYWOOD OR OSB WITH 10d AT 6" NAILING AT
FRAMING TO FRAMING TO REMAIN FRAMING AS NEEDED POST CAP OR SIMILAR EDGES & BLOCKING AND AT 12" AT FIELD
REMAIN 8. ROOF SHEATHING SHALL BE 1/2" PLYWOOD OR OSB WITH 8d AT 6" NAILING AT EDGES
7o & BLOCKING AND AT 12" AT FIELD
II I
FRAMING SYMBOLS:
SIMPSON WSW WOOD p CONTINOUS
SS24 STRONG WALL (24" WIDE) POST
EXISTING BEAM EXISTING POST
TO REMAIN TO REMAIN FRAMING PLANS
SW6 PLYWOOD POST STOPS
SHEARWALL BELOW THIS FLOOR AND DETAILS
A POST STARTS AT
p SHEARWALL HOLDOWN a THIS FLOOR
n Section 1
1 /2" = 1'-0"
LEGEND AND NOTES
1/4" = 1'-0"
S-1
Copyright b2 Structural Engineers 2008