Loading...
APPROVED ENG BLD PLN RESUB 1-BLD2023-1333+Architectural_Plan+11.20.2023_2.33.03_PM+3911088ALL WORK SUBJECT I APPROVED TO FIELD PLANS MUST BE INSPECTION FOR CODE COMPLIANCE ON JOB SITE max overage Site area Max allowed House (w/ roof overhang) Rear deck Front porch Tota I -------------- I I 1 I 0.4 acres (17,424 sf) 35% (6,098 sf) 2,733 sf 484 sf 195 sf 3,412 sf (19.6%) N89°24'36"W (160.001) -------------------------------------------------------- 10' - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - I I I OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE I I I' 1 ^I O OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING • I ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY 0 i UTILITIES MAY REQUIRE A SEPERATE PERMIT. o� I w 10� 1 :�o j � I I' I O 1 O Z 1 I I I I I' 1 I I I I ' ' L — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — / I I I � / I 10 / I / ------------------------------------------------------------------------------------------------------------------------------ City Of Edmonds Building Department ............................. Work DECK REPAIR .................................................................................. Address' 18810 92ND AVE W ............................................................................................ Owner CANNON .................................................................................................... : .................................................................................................... Approved Date � 11/21/2023 ................................................................................................... .................................................................................................. Building Official:................. Permit Number BLD2023-1333 ENGINEERING DIVISION APPROVED AS NOTED 11/28/2023 NO NEW IMPERVIOUS SURFACE AREA. NO STORMWATER MANAGEMENT SYSTEM REQUIRED AT THIS TIME. IF NEW AND/OR REPLACED IMPERVIOUS SURFACE EQUALS 2000SQFT OR GREATER, A STORMWATER MANAGMEMENT SYSTEM MAY BE REQUIRED PER CITY CODES AND STANDARDS RS-10 Zone Corner X: Flag Y Setbacks: Required Actual ------------ ------------ Front :________ ....f E Sides 1_�___ 'NwS: ex.: Rear ------------ ------------- Other Height 251 v� (25.001) N8505613911W N8902413611W (175.001 Nothing in the permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or APPROVED BY PLANNING unpermitted building, structure or site condition which is outside the scope of the permit application, regardless S�TE f::)L= N of whether such building, structure or condition is Nov 29 2023 shown on the site plan or drawing. Such building, '� structure or conditio9 n may be the subject of a separate action. 18 810 / 2 n d A V e W Edmonds, WA Zone: RS-10 Setbacks: Flag lot (10'along all boundaries) Max coverage: 35% 1 1.20.23 Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. RESUB Nov 20 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT S P 13'- I" PORCH PLAN (EXIST.) 3' —8" AREA OF EXISTING: DECK TO BE REMOVED (-13*) 1'-2" 6'-5" / L 3'-811 PORCH PLAN (PROPOSED) 6'-10 3/4" 00, 00 v 101 � EXIST. POST/PIER \ 9 / BLOCK REMOVED U ! \ \ C4 U / AREA OF EXISTING DECK TO BE REMOVED cD 2, / Ll X P \\] EXIST. POST/PIER CIA/ \ BLOCK REMOVED w w � / \ � j / \ 1 , lu Ledger to be attached and tension ties to be added per 2018 I RC standards. See MBP deck tip sheet for more information. O O EXISTING 4x4 POST ON DECK PIER BLOCK FTG. EXISTING 4x4 POST ON SONOTUBE FTG. ALL FRAMING LAYOUTS, MEMBERS AND FOOTINGS ARE EXISTING. SCOPE OF PORCH REPAIR IS TO REMOVE ONE SECTION OF THE PORCH AND REPLACE DECK SURFACE. ANY FRAMING MEMBERS THAT ARE FOUND TO BE DEGRADED ARE TO BE REPLACED. tI m a e t I D14 T U NI GRADE X O to Lu N I 3: EXIST. PORCH lu STAIRS MUST WITHSTAND 200 LB LtlLu Ci �„ L z HORIZONTAL CONCENTRATED �r '!U J LOAD AT RAILING TOP. l - N —1 f-- x X I 4 MUST WITHSTAND 50 LB F 0 1 = 3 HORIZONTAL LOAD AT (� 12"x12" SECTION OF INTERIOR l X I N RAILING PANEL. XI 1X u1 34" MIN. i _J SQUARE METAL TUBE/ 6'-1 3/4" 1 MAX 4" CABLE RAILING SYSTEM D IA. I I I I I I I 1 11 1 11 1 11 1 11 1 11 1 11 1 11 1 11 1 11 1 11 I I 1 11 1 11 11 111,��111���111-III=III=III=IIIIII=111,��111���111�� III���III,�,� LESS THAN 6," DIA. A 'A'- RAILING DETAIL PORCH FRAMING PLAN Cannon -Front Porch Repair 18810 92nd Ave W - Edmonds, WA RESUB Nov 20 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 10.20.23