Loading...
Building PermitType: PLUMBING Subtype: COMMERCIAL PLUMBING I Status: ISSUED Parcel No: 01050000010200 Site Address: 960 5TH AVE S 102 EDMONDS,WA 98020 Subdivision: 010500, 005820, 007725 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $0.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: PLUMBING -WATER HEATER Applied: 10/30/2024 Issued:11/4/2024 Final: Expiration Date: 11/4/2026 Issued by: NED I WA State Contractor L & I #: RESCUR*783BO I CONTACTS NAME TYPE NAME ADDRESS f PHONE EMAIL APPLICANT NAOMI DANIELS 175 ROY RD SW, PACIFIC WA (253)872-6944 NLTUCKER@ARS.COM 98372 CONTACT RESCUE ROOTER 175 ROY RD SW, PACIFIC WA (253)872-6944 nitucker@ars.com 98372 CONTRACTOR RESCUE ROOTER 965 RIDGE LAKE BLVD SUITE (425)771-7139 Nltucker@ars.com 201, MEMPHIS TN 38120 11804 MARINE VIEW DR, OWNER ANGEL STOKES EDMONDS WA 98026-3126 •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 11/4/24 R41131 PERMIT PLUMBING BASE FEE 001.000.322.10.000.00 $57.00 $57.00 11/4/24 R41131 WATER HEATER - INC EXPANSION 001.000.345.83.000.00 $17.00 $17.00 11/4/24 R41131 TANK TOTALS: $119.00 $119.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Monday, November 04, 2024 11:35:49 AM 1 of 2 PLUMBING Permit City of • • • �13298020 1 24-1432 www.edmondswa.gov - 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION Installation, use and maintenance of equipment and components shall be per EQUIPMENT USAGE FOR manufacturer's specifications, installation instructions, and applicable state codes. INFORMATION Provide manufacture's installation instructions on site for Building Inspector. FOR In addition to the required pressure relief valve an approved listed expansion tank shall EXPANSION TANK INFORMATION be installed on all hot water tanks per UPC 608. INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES B-3 PLUMB ROUGH IN X-0 PLUMBING FINAL" Printed: Monday, November 04, 2024 11:35:49 AM 2 of 2