Loading...
BLD2024-0960+WAIVER REQ Structural_Analysis_or_Calculations+7.24.2024_11.55.27_AM+4398564Arete Architecture 21806 2nd Ave W Bothell, WA 98021 www.arete-architecture.design 208-661-3253 July 24, 2024 Leif Bjorback Building Official Planning & Development Department City of Edmonds 121 5th Ave N Edmonds, WA 98020 RE: Ream Remodel — Submittal Requirements Waivers Dear Mr. Bjorback, The Ream project consists of construction of an unheated storage area in the existing garage, minor non-structural wall adjustments, installation of a pocket door in a non- structural wall, and replacing two small windows with a larger one where we have specified a header from the IRC table. Due to this limited scope, we are requesting a waiver from the following submittal requirements: • Structural calculations • Energy Code Compliance Information • Mechanical • Asbestos Abatement • Electric Vehicle Ready • Material Management Our reasoning for each follows. Structural calculations — there is no alteration to the structural integrity of the existing building. The header for the new window is code compliant based on the tables provided in the IRC and details for installation are included. No calculations need to be produced. Energy Code Compliance Information — There is no change to the existing building envelope, save the new window which has been provided with a note to ensure it meets a minimum U value of 0.30. The newly defined storage room is in unconditioned space and will be unconditioned. The door to this area is being enlarged (2'-10" to 3'-0") and notes have been provided to ensure code compliance. Lastly, we have provided a note that if there are new lighting fixtures they need to be L.E.D., which will be more energy efficient than the existing lighting, meeting the requirements of WSEC section R503 for alterations. Mechanical — Mechanical permits are listed on the Coversheet as deferred. No alterations to the mechanical system are expected. If there are alterations required to the mechanical system, the subcontractor will pull a separate permit. Asbestos Abatement — There are no demolition areas that we expect to encounter asbestos. This project is below the 750 square feet and $75,000 valuation thresholds. Electric Vehicle Ready — This project is below the 50% valuation threshold. Material Management — This project is below the square foot and valuation thresholds. If you have any questions about this project or the reasoning for these waiver requests please do not hesitate to contact Mike Garrett at 208-66-3253 or mike.g@arete- architecture.design. Sincerely, Mike Garrett, AIA Development Lead Arete Architecture, PLLC 2of2 Ream Renovation (24016)