Loading...
REVIEWED RESUB2 BLD2024-0072+75 PERCENT FORM+4.22.2024_1.01.00_PM+4211052RESUB Apr 22 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Address: BLD2024-0072 Permit # BLD2024-0072 341 12th ave N Home Owner: Bret & Jesse Niebruegge L Contractor: Self REVIEWED BY ITY OF EDMONDS This form may be used to help establish the percentage of demolition work performed to an existing home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing home's replacement cost (50% in a flood zone), the structure will be required to be rebuilt to the standards of new construction. See ECDC 19.00.045 Replacement cost of existing home $ How was the value determined? 785,000 budget written based on previous projects Component Value of Existing Component Percentage removed Replacement cost of removed component Notes Foundation $100,000 0% $0 Floor Framing $60,000 0% $0 Floor Insulation $8,000 0% $0 Wall Framing $75,000 50% $37,500 Wall Insulation $9,000 100% $9,000 Siding $50,000 80% $40,000 Roof Framing $45,000 100% $45,000 Roofing $25,000 100% $7&,Q8 25,000 Attic Insulation $8,000 100% $8,000 Windows $45,000 100% $45,000 Doors $15,000 100% $15,000 Plumbing $25,000 100% $25,000 Electrical $25,000 100% $25,000 HVAC $25,000 100% $25,000 Drywall $35,000 100% $35,000 Cabinets $65,000 100% $65,000 Painting, Flooring and Finishes $90,000 100% $90,000 Other $30,000 100% $30,000 Tota 1 $785000 $569,500 519,500 Percentage Removed (Total of Column 4 divided by Column 2) equals 72-5 6C/ Owner Date 3/21 /24 Contractor Date