REVIEWED RESUB2 BLD2024-0072+75 PERCENT FORM+4.22.2024_1.01.00_PM+4211052RESUB
Apr 22 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Address:
BLD2024-0072 Permit # BLD2024-0072
341 12th ave N
Home Owner: Bret & Jesse Niebruegge L
Contractor: Self
REVIEWED
BY
ITY OF EDMONDS
This form may be used to help establish the percentage of demolition work performed to an existing
home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing
home's replacement cost (50% in a flood zone), the structure will be required to be rebuilt to the
standards of new construction. See ECDC 19.00.045
Replacement cost of existing home $
How was the value determined?
785,000
budget written based on previous projects
Component
Value of
Existing
Component
Percentage
removed
Replacement
cost of removed
component
Notes
Foundation
$100,000
0%
$0
Floor Framing
$60,000
0%
$0
Floor Insulation
$8,000
0%
$0
Wall Framing
$75,000
50%
$37,500
Wall Insulation
$9,000
100%
$9,000
Siding
$50,000
80%
$40,000
Roof Framing
$45,000
100%
$45,000
Roofing
$25,000
100%
$7&,Q8 25,000
Attic Insulation
$8,000
100%
$8,000
Windows
$45,000
100%
$45,000
Doors
$15,000
100%
$15,000
Plumbing
$25,000
100%
$25,000
Electrical
$25,000
100%
$25,000
HVAC
$25,000
100%
$25,000
Drywall
$35,000
100%
$35,000
Cabinets
$65,000
100%
$65,000
Painting, Flooring
and Finishes
$90,000
100%
$90,000
Other
$30,000
100%
$30,000
Tota 1
$785000
$569,500 519,500
Percentage Removed (Total of Column 4 divided by Column 2) equals 72-5 6C/
Owner
Date 3/21 /24
Contractor Date