BLD2024-0560+GEO REPORT+4.26.2024_3.26.37_PM+4222297NELSON GEOTECHNICAL ASSOCIATES. INC. BLD2024-0560 September 22, 2023 RECEIVED Apr 30 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT April Zepeda & Brian King c/o Gerald Redding Via Email: gredding@redarch.net Geotechnical Engineering Evaluation Redding Deck Remodel 1225 —11th Place North Edmonds, Washington NGA File No. 1462723 Dear April and Brian: 17311-135th Ave. N.E. Suite A-500 Woodinville, WA 98072 (425) 486-1669 www.nelsongeotech.com This letter summarizes our opinions, evaluation, and recommendations regarding the deck redevelopment project located at 1225 — 111h Place North in Edmonds, Washington, as shown on the Vicinity Map in Figure 1. The parcel number for the property is 00606600000900. INTRODUCTION The property is square in shape and covers 0.23 acres in area. It is currently occupied by a single-family residence. The property is bordered by 11th Place North to the east and by neighboring residential properties to all other sides. Topographically, the site is gently sloping down from east to west and steeply slopes down to the west on the western edge of the site. We understand the plans include demolishing the existing deck and constructing a new deck on the west side of the residence. The City of Edmonds has requested a geotechnical report to address the critical areas mapped within the site. SCOPE The purpose of this study is to explore and characterize the site surface and subsurface conditions within the vicinity of the proposed deck replacement and provide geotechnical recommendations for site development. Geotechnical Engineering Evaluation Redding Deck Remodel Edmonds, Washington Specifically, our scope of services included the following: NGA File No. 1462723 September 22, 2023 Page 2 1. Reviewing available soil and geologic maps of the area as well as other relevant geotechnical information, as provided. 2. Exploring the subsurface soil and groundwater conditions with hand tool explorations. 3. Mapping the conditions on the site slopes using shallow, hand -tool explorations where necessary to construct geological cross sections and qualitatively evaluate slope stability. 4. Performing laboratory grain -size sieve analysis on soil samples, as necessary. 5. Determining presence of geological hazards within the site. 6. Providing recommendations for mitigation of geological hazards. 7. Providing general recommendations for site drainage and erosion control, as necessary. 8. Documenting the results of our findings, conclusions, and recommendations in a written geotechnical letter. SITE CONDITIONS Surface Conditions The property is square in shape and covers 0.23 acres in area. It is currently occupied by a single-family residence. The property is bordered by 11th Place North to the east and by neighboring residential properties to all other sides. Topographically, the site is gently sloping down from east to west and is bordered to the west by a steep west -facing slope. We understand the plans include demolishing the existing deck and constructing a new deck on the west side of the residence. We measured a cross-section across the western slope using a hand-held clinometer and a tape measure. The western slope descends at a gradient of 35 degrees (77.8 percent of slope). The slope is partially covered by grass yard areas as well as landscaping vegetation, bushes, and young trees. Cross -Section A -A' is presented in Figures 3. We did not surface water within the site or seepage emitting from site slopes at the time of our visit. We also did not observe any sloughing or other indications of slope movement during our site visit on August 1, 2023. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Redding Deck Remodel Edmonds, Washington Subsurface Conditions NGA File No. 1462723 September 22, 2023 Page 3 Geology: The geologic units for this site are shown on The Geologic Map of the Edmonds East and Part of the Edmonds West Quadrangles, Washington, by James P. Minard (USGS, 1983). The site is mapped as advance outwash (Qva) with glacial till (Qvt) nearby. Advance outwash is described as well -sorted sand and gravel deposited by streams issuing from advancing ice sheet. Glacial till is described as a compact diamict of silt, sand and subrounded to well-rounded gravel. Our shallow explorations encountered silty fine to medium sand with gravel consistent with the description of glacial till. Explorations: We visited the site on August 1, 2023, to explore the subsurface conditions within the vicinity of the proposed deck replacement with three hand auger explorations extending to depths ranging from 1.5 to 2.5 feet below the existing ground surface. The approximate locations of our explorations are shown on the Schematic Site Plan in Figure 2. A geologist from Nelson Geotechnical Associates, Inc. (NGA) completed the explorations, examined the soils and geologic conditions encountered, and maintained logs of the explorations. The soils were visually classified in general accordance with the Unified Soil Classification System, presented in Figure 4. The logs of our explorations are presented as Figure 5. The following paragraph contains a brief description of the subsurface conditions encountered in the explorations. For a detailed description of the subsurface conditions, the hand auger logs should be reviewed. In all of our explorations we encountered dark brown, fine to coarse sand with gravel, organics, roots, and varying amounts of silt extending to depths in the range of 0.5 to 2.25 feet below the existing ground surface, which we interpreted as undocumented topsoil. Underlying the topsoil we encountered light gray, silty, fine to medium sand with gravel which we interpreted as glacial till soils at depth. Hydrogeologic Conditions We did not observe any seepage emitting from site slopes or groundwater within our explorations. If groundwater were to be encountered within the site, we would interpret it to be perched water. Perched water occurs when surface water infiltrates through less dense, more permeable soils and accumulates on top of a relatively low permeability material. Perched water does not represent a regional groundwater "table" within the upper soil horizons. Perched water tends to vary spatially and is dependent upon the amount of rainfall. We would expect the amount of perched groundwater to decrease during drier times of the year and increase during wetter periods. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation NGA File No. 1462723 Redding Deck Remodel September 22, 2023 Edmonds, Washington Page 4 SENSITIVE AREA EVALUATION Seismic Hazard We reviewed the 2018 International Building Code (IBC) for seismic site classification for this project. Since dense soils are interpreted to underlie the site at depth, the site best fits the IBC description for Site Class D. Table 1 below provides seismic design parameters for the site that are in conformance with the 2018 IBC, which specifies a design earthquake having a two percent probability of occurrence in 50 years (return interval of 2,475 years), and the 2008 USGS seismic hazard maps. Table 1— 2018 IBC Seismic Design Parameters Site Class Spectral Acceleration Spectral Acceleration Site Coefficients Design Spectral at 0.2 sec. (g) at 1.0 sec. (g) Response SS S1 Parameters Fa Fv Sos SDI r -7 D 1.293 0.456 1.000 null 0.862 null The spectral response accelerations were obtained from the OSHPD Seismic Design Maps website (ASCE 7-16 data) for the project latitude and longitude. Hazards associated with seismic activity include liquefaction potential and amplification of ground motion. Liquefaction is caused by a rise in pore pressures in a loose, fine sand deposit beneath the groundwater table. It is our opinion that the dense glacial deposits interpreted to underlie the site have a low potential for liquefaction or amplification of ground motion. Erosion Hazard The criteria used for determination of the erosion hazard for affected areas include soil type, slope gradient, vegetation cover, and groundwater conditions. The erosion sensitivity is related to vegetative cover and the specific surface soil types, which are related to the underlying geologic soil units. The Natural Resources Conservation Service (NRCS) of the City of Edmonds was reviewed. The soil in the eastern portion of the site is mapped as Alderwood gravelly sandy loam 15 to 30 percent slopes and the western portion of the site is mapped as Alderwood-Urban land complex, 8 to 15 percent slopes. The erosion hazard for these soils are listed as severe and moderate, respectively in areas where soils are exposed. It is our opinion that the erosion hazard for site soils should be low in areas where the site is not disturbed, and vegetation remains in place. Upon review of the Edmonds City Code (ECC) we have determine that site slopes meet the definition of an erosion hazard area as defined in ECC 23.80.020. A due to their classification by the NRCS as having a severe erosion hazard. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation NGA File No. 1462723 Redding Deck Remodel September 22, 2023 Edmonds, Washington Page 5 Landslide Hazard/Slope Stability The criteria used for evaluation of landslide hazards include soil type, slope gradient, and groundwater conditions. The steep slopes within the site descend to the west at gradients of 35 degrees (77.8 percent grade) and have a vertical relief of approximately 29 feet. Site slopes are vegetated with grass, shrubs, scattered young to mature trees. We did not observe evidence of surficial sloughing or erosion at the time of our visit on August 1, 2023. We also did not observe any seepage emitting from site slope while we were on site. Upon review of Edmonds City Code (ECC) we have determined that the steep slopes on the west side of the property meet the definition of a landslide hazard area as outlined in ECC 23.80.020.13, due to the having inclinations steeper than 40 percent and a height of more than 10 feet. The competent glacial soils interpreted to form the core of the site slope have high internal strength and are considered stable with respect to deep-seated slope failures. However, the loose surficial soils on and near the slope have potential to experience shallow sloughing failures, which could be triggered by intense rainfall or a seismic event. Proper site grading and drainage as well as slope maintenance, as recommended in this letter, should help maintain current stability conditions. CONCLUSIONS AND RECOMDATIONS General It is our opinion from a geotechnical standpoint that the proposed deck replacement feasible. Our explorations in the vicinity of the proposed decks indicated there was 0.5 to 2.25 feet of loose topsoil underlain by medium dense or better native glacial till soils. These soils should provide adequate support for foundation loads. We should note that deeper areas of loose or unsuitable soils may be encountered in unexplored areas of the site. if these conditions are encountered in footing areas they will require over excavation. We recommend that the replacement deck foundations consist of 12-inch diameter Sonotube foundations embedded a minimum of one foot into medium dense or better native till soils. At the time of our site visit the western slope below the existing residence did not exhibit indications of recent slope instability. We interpreted that the core of the site slope consists of native dense soils, which are considered stable with respect to deep-seated slope movements. There is a potential for shallow erosional events to occur within the loose near -surface soils. The proposed setback for the new deck is approximately 34 feet from the top of the steep slopes. In our opinion this set back should be adequate to protect the new deck from any failures originated within the steep slopes. Provided the new deck foundations are constructed per our recommendations, including proper foundation embedment, the proposed development should not negatively impact slope stability or neighboring properties. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation NGA File No. 1462723 Redding Deck Remodel September 22, 2023 Edmonds, Washington Page 6 Under no circumstance should water be allowed to concentrate on or flow over site slopes. Water that is currently directed below the deck should be collected and routed to a suitable discharge point, away from the slope. Earthwork associated with the proposed deck foundation should be minor. However, the soils encountered on this site are considered moisture -sensitive and may disturb easily when wet. To lessen the potential impacts of construction on the slopes and to reduce cost overruns and delays, we recommend that foundation preparation take place during dry weather, if possible. If earthwork takes place during wet weather, additional expenses and delays should be expected. These extra expenses could include additional erosion control and temporary drainage measures to protect the slope. Excavation spoils should be kept away from the slope or hauled off site. Vegetation on the slope should not be disturbed. Any areas within the site where vegetation is disturbed should be replanted as soon as reasonably possible. Erosion Control and Slope Protection Best Management Practices (BMPs) should be used to control erosion where exposed soils or disturbed areas are encountered. Erosion control measures may include diverting surface water away from exposed soils/excavations and the steep site slopes. If any vegetation is removed from the area above the slope, silt fences or straw bales should be erected to prevent muddy water from flowing over the site slopes. Disturbed areas should be replanted with vegetation and the vegetation should be maintained until it is established. Under no circumstances should runoff be allowed to concentrate on the slope either during construction or after construction has been completed. Protection of the slope areas should be performed as required by the City of Edmonds. Specifically, we recommend that the site slopes not be disturbed or modified through placement of any fill or removal of the existing vegetation. No material of any kind, such as excavation spoils, lawn clippings, debris, and soil stockpiles, should be placed on or near the slope. The exposed soils underlying the deck should be protected from erosion. This could be accomplished by placing jute netting across the area or filter fabric overlain by a thin layer of crushed rock. Any sloping areas disturbed grading activities should be planted as soon as practical to reduce the potential for erosion. The new vegetation should be maintained until it is established. Replacement of vegetation should be performed in accordance with the City of Edmonds code. Under no circumstances should water be allowed to concentrate on the slopes. We recommend NGA be retained to review final erosion control measures implemented after the fill is removed. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation NGA File No. 1462723 Redding Deck Remodel September 22, 2023 Edmonds, Washington Page 7 Site Preparation and Grading After erosion control measures are implemented, site preparation should consist of stripping the topsoil, undocumented fill and/or loose soils from foundation areas and other structural areas, to expose medium dense or better native bearing soils. The stripped soil should be removed from the site or stockpiled for later use as a landscaping fill. Based on our observations, we anticipate stripping depths of 1.5 to 3.25 feet, depending on the specific locations. However, additional stripping may be required if areas of deeper undocumented fill and/or loose soil are encountered in unexplored areas of the site. After site stripping, if the exposed subgrade is deemed loose, it should be compacted to a non -yielding condition and then proof -rolled with a heavy rubber -tired piece of equipment. Areas observed to pump or weave during the proof -roll test should be reworked to structural fill specifications or over -excavated and replaced with properly compacted structural fill or rock spalls. If loose soils are encountered in the pavement areas, the loose soils should be removed and replaced with rock spalls or granular structural fill. If significant surface water flow is encountered during construction, this flow should be diverted around areas to be developed, and the exposed subgrades should be maintained in a semi -dry condition. If wet conditions are encountered, alternative site stripping and grading techniques might be necessary. These could include using large excavators equipped with wide tracks and a smooth bucket to complete site grading and covering exposed subgrade with a layer of crushed rock for protection. If wet conditions are encountered or construction is attempted in wet weather, the subgrade should not be compacted as this could cause further subgrade disturbance. In wet conditions, it may be necessary to cover the exposed subgrade with a layer of crushed rock as soon as it is exposed to protect the moisture sensitive soils from disturbance by machine or foot traffic during construction. The prepared subgrade should be protected from construction traffic and surface water should be diverted around areas of prepared subgrade. Structure Setbacks Uncertainties related to building along steep slopes are typically addressed by the use of building setbacks. The purpose of the setback is to establish a "buffer zone" between the structure and the top of the slope so that ample room is allowed for normal slope recession during a reasonable life span of the structure. In a general sense, the greater the setback, the lower the risk of slope failures to impact the structure. From a geological standpoint, the setback dimension is based on the slope's physical characteristics, such as slope height, slope gradient, soil type, and groundwater conditions. Other factors such as historical slope activity, rate of regression, and the type and desired life span of the development are important considerations as well. We understand the proposed structure will be constructed close to the top of site slopes. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation NGA File No. 1462723 Redding Deck Remodel September 22, 2023 Edmonds, Washington Page 8 Based upon the conditions described above, it is our opinion that the potential for shallow sloughing -type failures exists on the steeper site slopes, while the potential for deep-seated failures is considered low. In our opinion the proposed setback of 34-feet from the top of the steep slope should provide adequate separation from the slope, in the event of shallow failures during a reasonable life span of the structure. We should be retained to review final structure locations and to observe foundation excavations prior to placing forms. Any proposed development within the setback area should be the subject of a specific geotechnical evaluation. Under no circumstances should water be allowed to concentrate on the slopes, during or after construction. Deck Foundations We recommend the new deck be supported on sonotubes extending below the surface. Our soil explorations indicated competent native soils should be encountered at depths in the range of 0.5 to 2.25 feet below existing grade; however, this could be deeper in unexplored areas of the site. Deck foundations should extend through any loose undocumented fill encountered and be founded in competent native soils. We recommend deck foundations be supported on 12-inch minimum diameter sonotubes extending a minimum 24 inches below the existing ground surface but no less than 1-foot embedded into competent native soils. The sonotubes should be analyzed for design soil bearing pressure of 1500 pounds per square foot (psf). A passive earth pressure of 150 pounds per cubic foot should be utilized in designing the deck foundations along the below grade portions of the deck foundations. Using the above passive pressure, the upper 1- foot of soil should be neglected in the design. We anticipate the embedded sonotube foundations should provide adequate protection from shallow erosional slide activity as well as vertical and lateral loading thresholds. If during structural design passive earth pressure is not sufficient to support the planned loads, we recommend grouted tieback anchors be utilized to pick up lateral loads for each planned sonotube foundation. We should be retained to review final plans and inspect the bottom of hole subgrade prior to placing the sonotube foundation. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Redding Deck Remodel Edmonds, Washington NGA File No. 1462723 September 22, 2023 Page 9 Site Drainage We do not anticipate that the new decks will significantly alter drainage patterns at the site. Adequately spaced decking on joist framing should not concentrate runoff from the deck. If the decking is tightly spaced and will concentrate runoff from the decks, the water should be collected in gutters and downspouts and be directed away from the slope. We should be retained to evaluate the drainage plans. The soil below the deck should be covered with erosion control matting. All runoff generated on this site, including roof downspouts, yard and footing drains, and hard surfaces, should be collected and routed into permanent discharge system at the bottom of the slope or an existing, approved system. Under no circumstances should water be allowed to flow uncontrolled over the slopes. All existing drainage systems should be inspected and maintained such that no water is allowed to reach the slope. Water should not be allowed to collect in any area where foundations are to be constructed. USE OF THIS LETTER This letter has been prepared for April Zepeda and Brian King and associated agents, for use in the planning and design of the proposed deck developments on this site only. The scope of our work does not include services related to construction safety precautions and our recommendations are not intended to direct the contractors' methods, techniques, sequences, or procedures, except as specifically described in our letter. There are possible variations in subsurface conditions between the explorations and also with time. Our letter, conclusions, and interpretations should not be construed as a warranty of subsurface conditions. A contingency for unanticipated conditions should be included in the project budget and schedule. We recommend that NGA be retained to provide monitoring and consultation services during construction to confirm that the conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes should the conditions revealed differ from those anticipated, and to evaluate whether or not deck support installation complies with our recommendations. We should be contacted a minimum of one week prior to construction activities. All people who own or occupy homes on or near hillsides should realize that landslide movements are always a possibility. The landowner should periodically inspect the slope, especially after a winter storm. If distress is evident, a geotechnical engineer should be contacted for advice on remedial/preventative measures. The probability that landsliding will occur is substantially reduced by the proper maintenance of drainage control measures at the site. Therefore, the homeowner should take responsibility for performing such maintenance. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Redding Deck Remodel Edmonds, Washington NGA File No. 1462723 September 22, 2023 Page 10 Within the limitations of scope, schedule and budget, our services have been performed in accordance with generally accepted geotechnical engineering practices in effect in this area at the time this letter was prepared. No other warranty, expressed or implied, is made. Our observations, findings, and opinions are a means to identify and reduce the inherent risks to the owner. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Engineering Evaluation Redding Deck Remodel Edmonds, Washington NGA File No. 1462723 September 22, 2023 Page 11 We appreciate the opportunity to provide service to you on this project. If you have any questions or require further information, please call. Sincerely, NELSON GEOTECHNICAL ASSOCIATES, INC. Faith K. Stelter Staff Geologist I Sarah L. Dunn, GIT Project Geologist .2023 Khaled M. Shawish, PE Principal Engineer SLD:FKS:KMS:dy Five Figures Attached NELSON GEOTECHNICAL ASSOCIATES, INC. - p Project _ Site THE BOwI OP EBOWL5 Edmonds Woodway Richmond Beach altwater Park 6-9 VICINITY MAP Not to Scale Lynnwood s SEATTLE MPGHTS WInCO Foods `;hiriy3ali Q Mountlake Terrace -COStCZS Wh'il�dlr �I c ECHO LAK ��NORTH CIT, s�s Md't�I LARCH WAY Alder Snohomish County, WA E Brie, Alderwood Manor Ic LL Bothell Project Number mSOn GEOTECHmCAL No. Date Revision By I cK 1462723 Redding Deck Replacement 11110111pSSOCIpTES, inc1 8/3/23 Original ABT ono Vicinity Map -•f,�, Wootlinville Office Wenatchee Office y Figure 1 17311-135th Ave. NE, A-500 105 PaInuse St. y Woodinville, WA 98072 Wenatchee, WA 98801 www.nelsongeotech.com (425) 486-1669 / Fax. 481-2510 (509) 665-7696 / Fax 665-7692 U Site Plan LEGEND HA-1 • — Property line _�_ Number and approximate location of hand auger A A' Approximate location of cross-section Reference: Site plan based on field measurements, observations, and aerial parcel map review. :\Users\Alexander(Alex)Baucc\OneDrive - Nelson Geotechnical Associates, Inc\2023 NGA Proiect\14627-23 Redding Deck Replacement Edmo Y O U o CO CO N0 .y E- N m ��+ N � M � Q � Z i V o N? W194 ttN 30� ■ CO O C to 40 CO Q vLL O oA>- - L I �m N r C 0 I 3 W ^E^' W CO U Q � _ � d Y N N U) 0 30 60 c' ry Approximate Scale: 1 inch = 30 feet West 80 T .e N C O > 40 a� w CU L a 20 0 a AN /_ Existing Residence I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0 20 40 60 80 100 120 140 Distance (feet) East — 80 All 40 20 n Exploration Hand Auger Designation-> HA-1 Groundwater Level ---> 1 NOTES: During Exploration 1) Stratigraphic conditions are interpolated between Geologic Contact --> ? _ —� the explorations. Actual conditions may vary. (approximate) 2) Elevations are arbitrary. Reference: Cross Section is based on field measurements using a hand-held clinometer and 100-ft tape measure. C:\Users\Alexander(Alex)Baucc\OneDrive - Nelson Geotechnical Associates, Inc\2023 NGA Project\14627-23 Reddinq Deck Replacement Edmonds\Draftinq\CS.dwq Y 0 U o co m a c 0 N o m @ m 0 m O Z w o"3� C V — = W cn 1.— W ® ~ W� o coo <o C Cn O Q dLL t� 1 M2 W 3m�� C E UNIFIED SOIL CLASSIFICATION SYSTEM GROUP MAJOR DIVISIONS GROUP NAME SYMBOL CLEAN GW WELL -GRADED, FINE TO COARSE GRAVEL COARSE- GRAVEL GRAVEL GP POORLY -GRADED GRAVEL GRAINED MORE THAN 50 % GRAVEL GM SILTY GRAVEL OF COARSE FRACTION RETAINED ON SOILS NO.4 SIEVE WITH FINES GC CLAYEY GRAVEL SAND CLEAN SW WELL -GRADED SAND, FINE TO COARSE SAND SAND SP POORLY GRADED SAND MORE THAN 50 % RETAINED ON MORE THAN 50 % NO. 200 SIEVE OF COARSE FRACTION SAND SM SILTY SAND PASSES NO. 4 SIEVE WITH FINES SC CLAYEY SAND FINE - SILT AND CLAY ML SILT INORGANIC GRAINED LIQUID LIMIT CL CLAY LESS THAN 50 % SOILS ORGANIC OL ORGANIC SILT, ORGANIC CLAY SILT AND CLAY MH SILT OF HIGH PLASTICITY, ELASTIC SILT INORGANIC MORE THAN 50 % PASSES LIQUID LIMIT CH CLAY OF HIGH PLASTICITY, FAT CLAY NO. 200 SIEVE 50 % OR MORE ORGANIC OH ORGANIC CLAY, ORGANIC SILT HIGHLY ORGANIC SOILS PT PEAT NOTES: 1) Field classification is based on visual SOIL MOISTURE MODIFIERS: examination of soil in general accordance with ASTM D 2488-93. Dry - Absence of moisture, dusty, dry to the touch 2) Soil classification using laboratory tests is based on ASTM D 2488-93. Moist - Damp, but no visible water. 3) Descriptions of soil density or Wet - Visible free water or saturated, consistency are based on usually soil is obtained from interpretation of blowcount data, below water table visual appearance of soils, and/or test data. Project Number nELSOn GEOTEnninl_ No. Date Revision By cK Aurora Avenue � , 7i2oiz3 Original ABT ono 1462723 Remediation Soil Classification Chart ASSOCIATES, inc ui " 135th"°e CA Wenatchee Office 17311-1351h Ave. NE, A-500 105 Palouse Figure 4 Woodinville, WA 98072 Wenatchee, WA 98801 98 www.nelsongeoiech.com (425) 486-1669 / Fax 481-2510 (509) 665-7696 / Fax: 665-7692 LOG OF EXPLORATION DEPTH (FEET) USCS SOIL DESCRIPTION HAND AUGER ONE 0.0-0.5 GRASS UNDERLAIN BY BROWN -GREY, FINE TO MEDIUM SAND WITH SILT, ROOTS, AND GRAVEL (LOOSE TO MEDIUM DENSE, DRY TO MOIST) (FILL) 0.5 - 1.5 SM LIGHT GREY, SILTY, FINE TO MEDIUM SAND WITH GRAVEL (MEDIUM DENSE TO DENSE, MOIST) SAMPLES WERE NOT COLLECTED GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED HAND AUGER CAVING WAS NOT ENCOUNTERED HAND AUGER MET REFUSAL AT 1.5 FEET HAND AUGER TWO 0.0- 1.0 LANDSCAPING UNDERLAIN BY DARK BROWN TOPSOIL 1.25 - 2.25 DARK GREY -BROWN, SILTY, FINE TO COARSE SAND WITH ORGANICS, ROOTS, GRAVEL, AND IRON OXIDE STAINING (LOOSE TO MEDIUM DENSE, MOIST) (FILL) 2.25-2.5 SM LIGHT GREY, SILTY, FINE TO MEDIUM SAND WITH GRAVEL (MEDIUM DENSE TO DENSE, MOIST) SAMPLES WERE NOT COLLECTED GROUNDWATER SEEPEGE WAS NOT ENCOUNTERED HAND AUGER CAVING WAS NOT ENCOUNTERED SAMPLES WERE NOT COLLECTED HAND AUGER THREE 0.0-0.5 GRASS UNDERLAIN BY BROWN -GREY, FINE TO MEDIUM SAND WITH SILT, ROOTS, AND GRAVEL (LOOSE TO MEDIUM DENSE, DRY TO MOIST) (FILL) 0.5 - 1.5 SM LIGHT GREY, SILTY, FINE TO MEDIUM SAND WITH GRAVEL (MEDIUM DENSE TO DENSE, MOIST) SAMPLES WERE NOT COLLECTED GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED HAND AUGER CAVING WAS NOT ENCOUNTERED HAND AUGER MET REFUSAL AT 1.5 FEET DJO:ABT NELSON GEOTECHNICAL ASSOCIATES, INC. FILE NO 1462723 FIGURE 5