Loading...
RESPONSE 1 BLD STRUCTURAL BLD2024-0685+Applicant_Response+6.14.2024_3.45.22_PM+4324452Structural Works, PLLC 1412 Beach Dr NE Tacoma, WA 98424 253-533-0835 June 12, 2024 RE: Building Permit Application #BLD2024-0685 — 821 Bell St To whom it may concern: 6. Symbols for post and trimmers conflict in plan at HDR-1 and the schedule provided. Clarify and/or correct as necessary. Response: Trimmers of HDR-1 revised. 7. The header schedule calls out HDR-4; however, this is not indicated on any of the framing plans or structural calculations provided. Clarify and/or correct as required. Response: The schedule is revised. 8. It appears there are existing fenestrations at the Rec Room and Kitchen that will be widened as a part of the project; however, the revised framing and structural requirements have not been identified. Indicate framing and/or structural revisions for this work as required. Response: The header placement in the architectural plan was used & FB-1 is calculated and detailed for second floor framing plan. 9. It appears new headers are identified on the roof plan (ie HDR & RHDR-1). Clarify and/or correct the scope of work of the roof and framing. Response: Roof framing plan revised. 10. A shear wall schedule is provided; however, there is no indication of the shear wall(s) in plan. Correct and/or clarify as required. Response: Since there is no change in the existing structure, there is no need to change the existing shearwalls. But the newly added shearwall parts must be swl as seen in the legend. (ALL NEW EXTERIOR WALLS SHALL BE SW1 UNLESS NOTED OTHERWISE.). Regards, Ercin Sahin, PE Structural Works PLLC