APPROVED BLD2023-1397+Architectural_Plan+11.9.2023_6.17.11_PM+3892946Main Floor — as built
Deck 1
Laundry Room Balhr
60.90 sq ft 44.05
q Vestibule
sgft (16'13/4'Y 13')
Dining Room
6'7".9'3'
7'31/2
93.54
140.92 sq ft
Living Room
8'41/4'. 17'
426.73 sq ft(21'91/4'+21'73/4')
Hall
48.75 sq ft (14'31/4'.3'5')
16
O
Dining Rm/Bar Living m Roo
124-77 sq ft 196.39 sq ft (14' 11' s 13' 2")
t ,
Dimensions are approximate.
;separate Plumbing
i
permit is required for thisproject. Please obtain a I APPROVED ALL WORK SUBJECT OBTAIN ELECTRICAL
■Plumbing permit from the PLANS MUST BE TO FIELD PERMIT FROM
■ INSPECTION FOR STATE LABOR &
City of Edmonds J ON JOB SITE INDUSTRIES
■ ■ ■ ■ CODE COMPLIANCE
' • The following documentation shall be available on '
site for the building inspector:
® COE APPROVED ARCHITECTURAL PLAN SET
® COE APPROVED STRUCTURAL PLAN SET
: ❑ COE REVIEWED CALCULATION PACKET
■
❑ ENERGY CREDIT WORKSHEET
❑ SITE PLAN ;
❑ CIVIL PLAN
■ ❑
L • ......... 1.,Ti °::°: °:°::::°:N: °:P:::M::T:::............ .
City Of Edmonds
Building Department
Work REMODEL
Address 729 MAIN ST
Owner AUSTIN
Approved Date 11/29/2023
Building Official 'Daszovtzst W. V Vfk.a-,L
Permit Number BLD2023-1397
r■�■�■�■�■�■�■�■�■�■�■� RECEIVED
iLOCAL
Nov3
EXHAUST FANS SHALL BE PROVIDED IN of oEPaR.ME, ES
(EACH KITCHEN, BATHROOM, WATER CLOSET. I
1
1
L
1
1
1
1
Z<O
Main Floor —after remodel
A JF_ V_
40
Dining Room
140.76 sq ALiving Room
8'33/4"x17' 431.84 sq ft(21'91/4' x 22'1/4")
I�
Butler pantry Bathr om
60^^sq tt 44.05 qf# 459 sgft(1('Sex 13'1-
1 / 6' 9' 3' T 3 12 9
Hall
48.76sgft(14'31/4'x3'5')
DIning Rm/Bar Living Room
124.77 sq ft 196.44 sq ft (14' 11' x 13' 2")
t
Dimensions are approximate.
1. Convert laundry room to pantry w/ cabinets on 3 walls & sink/counter on outside wall. Leave window
in -place for cost savings.
- Cutting in new doorway from hallway
- Closing in two existing doorways
- Relocate existing plumbing as necessary
- Add countertop outlets and wall outlet
RECEIVED
Nov 13 2023
111ELOP1111 I'll "I
Main Floor, Butler Pantry — overhead lighting plan after remodel
Pendant / sconce over
sink, switched at sink
Under counter
S
outlet for disposer
O
Wall outlets
above counter
Wall outlets
above counter
7
Ceilingfi ure,
switched door
U,,„,rcabinet lighting,
5 wall switch
switched at door
(Da 0 wan uun�t
Q ce,imQflush --tea light
SSg«ems
d light
X wall mounted light
RECEIVED
Nov 13 2023
Main
Floor, Butler Pantry — elevation after remodel
gg
Full depth
counter
5 wall switch
os M wmioun,,s
Q ce�hoQ nosh m000aa light
a«�scd light
Right wall cabinets
Back wall cabinets
X wallmoomeehaht
pen shelvin
(adjustable)
Full depth
counter
Deep
rawers
Possible
beverage
fridge
•
•
French glass /brass
bistro shelving
Backsplash covers
entire wall
Counte
RECEIVED
Nov 13 2023
Main Floor, Butler
Pantry — elevation after remodel
OpeR
Under -cabinet
lighting
Small counter
SWall switch
Qor M wml ounet
0 CeJmg flush mounted light
RRecessed light
Right wall cabinets X wall mounted light
SERVICES
cub
ies
Pantry
II -outs
Appliance shelf w/ backspl ash
(Coffee, Ice Maker, Instapot, toaster, blender)
•
•
i i i i
• Wide
drawers f
deep •
r platters
•DEVELOPMENT
RECEIVED
Nov 13 2023
Main Floor, Kitchen & Family Room — lighting plan after remodel
Esisbg wlEoor wa
1^e waM ^eeoem
Nyh mount
aNN Ip N
S /
Wn Downlphl
N �� urtlar raYb i
1yMalaaa i
Eail111paily6Me i
Im+a{Ryn}tla) � `_ e____.. MaYOVght
l C;
ssss
LenJ� Lan Unh
�l Fbv o-- �l
L�aala��,�,
rn g SSSS olalal
�Eaismg oNOoor scanws �
I^o+m^`^��Ir Oullel la under S wall switch
� — — raeinel lgms
wr aeabe
}0 cellmg nosh moulten light
i X T accessed light
X wan mounted light
RECEIVED
Nov 13 2023
OEPARTMENT
DEVELOPMENT SERVICES
Second Floor —as built
Guest Bedroom
Closet
8
Porch v
Guest Bedroom
G st
Walk-in closet
o Closet
u
Office
z<0
Dimensions are approximate.
RECEIVED
Nov 13 2023
LOCAL EXHAUST FANS SHALL BE PROVIDED IN
(EACH KITCHEN, BATHROOM, WATER CLOSET.
Second Floor —after remodel
a o
2
3 r 6
os " ❑ 4 Closet
Porch v
Guest Bedroom
l� Batst
o � Closet
v
Office
z<0
Dimensions are approximate.
Changes on Second Floor
Second Floor
1. Relocate toilet to new location in existing closet
- Add door to toilet room
2. Divide extra bedroom. Use a/ space to create laundry room; use remaining % to expand master bath.
3. Full bath remodel; new cabinets, countertops, floor and shower tile, sinks, tub
- Close both existing door openings. Create new opening across from toilet room
- Close up existing small window
- Install new exterior window — size and exact location tbd
- New electrical for outlets and lighting
- Add or reuse HVAC register in new master bath
4. New laundry room w/ new cabinets, utility sink, and LVT flooring
- Move existing bedroom door slightly left to accommodate new laundry room cabinets
5. Install new hardwoods in master bedroom, hallway and new toilet room
- Materials already on site
6. Remove existing carpet on stairs and convert treads to wood + runner.
- stain -grade bull -nosed treads, espresso stain treads and handrail
- Paint spindles and risers white to match trim
7. New wall paint throughout
- New trim paint to match downstairs trim
Notes:
- Reusing existing door and window casing and baseboard trim
RECEIVED
Nov 13 2023
I
Second Floor —after remodel
Confirm no Changes (inside wall to inside wall dimensions)
to this wall 164 1/2" 96"
? ?
6
• "' Closet
? --►� � ••
106" 28„
_ Guest bedroom
0 L ,�1 Geest
Q Bath
� 7 closet
\ CMl to
z
Dimensions are approximate.
RECEIVED
Nov 13 2023
OEPARTMENT
DEVELOPMENT SERVICES
Second Floor — main bath & laundry room lighting plan after remodel
Laundry
basket & Linen
folding ontge
R
sewing
work
space
oa
RI
1
I I
R
Iv
W/D
stacked
l
240V
I
I
S wall switch
\
O CeJmg flush mounted light
* light
Dimensions are approximate.
X wall mounted light
LOCAL EXHAUST FANS SHALL BE PROVIDED IN
(EACH KITCHEN, BATHROOM, WATER CLOSET.
RECEIVED
Nov 13 2023
10
Master Bath, vanity — elevation after remodel
Wall sconces
Ar
SWall switch
o� wml o.net
0 CeJmg flush mounted light
RRecessed light
Back wall cabinets X Wall mounted light
X
x X
RECEIVED
Nov 13 2023
OEPARTMENT
DEVELOPMENT SERVICES
11
Second Floor —toilet room & guest bath lighting plan after remodel
b
S wan switch
`gr= or N wall outlet
\ '-" JOB Ceiling flush mounted light
���—�)
2 4- Recessed light
Dimensions are approximate. X Wall mounted light
RECEIVED
Nov 13 2023
D—OPMENT SERVICES
OEPARTMENT
12