Loading...
REV1 REVIEWED BLD2023-1397+LETTER OF CHANGES+5.29.2024_9.11.24_PM+4289133PRIOR TO DEMO During the initial structural assessment prior to the demo, the structural engineers expected there to be a structural support beam running perpendicular to the joists in the main level ceiling / top level floor. L ............................................... REVIEWED BY CITY OF EDMONDS BUILDING DEPARTMENT; INFILL EXIST OPENING (NON-STRUCTURAL) N N LPL LL X X N N N N EXIST BEAM BM205 I POCKET BEAM J � PER 5/S3.1 � m BLD2023-1397 ./ °'" ,6 o `S3� 4x10 (V V o EXIST FLOOR z JOISTS 0 J EXIST BEAM Q LL N N X LOADS TO THESE POST DECREASING OVERALL HDR ✓IDE) REVISION May 30 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT EXIST BEAM Ln Ln 0 0 LL 0 0 0 J LL — — — — — — t — — — — CONNECT HOLDOWN — TO FOUNDATION PER DIET 1/S3.1 ST 4xg HDR (VFY/P POST -DEMO ADJUSTMENTS (3/21/24) y� , 1, �FILLEN ST PENING o After demo, it was discovered that I (NON- R URAI)i LL I s WL LL a x r there was not a beam where I 4x10JOIST BLKGW/HU C BEAM l g X LL00 I !Q ^ HANGER EA SIDE BELOW P expected. Instead, the joists ran the I POST ABOVE full width of the house. G I 0 o 1 4x10 4#2 ILI �I To ensure proper support for the top o HDR _F7 15,_31n„ i EXIST 4x6HDR level, structural engineers , (VFY/PROVIDE) N x N � recommended the addition of sister XVT x I EXIST FLOOR joists in main level ceiling /top level 'GISTS O SI NEW JOIST TO EXIST uX, - •+ W/ROWS 16d NAILS @ f l o o r. 12" 4C STAGGERED, TYP. (4) ao 0 EXIST BEAM LOC TIONS n ,.., N ;:� " X L N X 14 X v/ x c t; w X � W ` W IK1 M I I I VERIFY EXIST JOIST / MIN 2" BEARING ON WALL.INEW JOIST MAY BE CUT AT FACE OF — — — — — WALL, TYP. (4) �C TIONS EXIST BEAM BEAM Ln 0 O O LL h