Loading...
APPROVED ENG BLD2023-1244+Transportation_Impact_Form+10.5.2023_12.56.50_PM+3824061APPENDIX A �y of N Q_4f Page 1 of 2 Transportation Impact Analysis Worksheet ")C. I xqo PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: Owner/Applicant Name Street/Mailing Address City Telephone: Applicant Contact Person: Name Street/Mailing Address State Zip City State Zip Telephone: Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Contact Name Telephone: E-mail: i 1. PROJECT DESCRIPTION a. Location - Street address: (Attach a vicinity map and site plan.) b. Specify existing land use: c. Specify proposed type and size of development: (# of residential units and/or square footage of building) d. Date construction will begin and be completed: e. Define proposed access locations: APPENDIX A Page 2 of 2 f. Define proposed sight distance at site egress locations: 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. ❑ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. ITE Land Use Category New Use Prior Use Per Unit Fee Rate $ X $ X Units in square feet, # of dwelling, vfb. etc. Fee New Use Fee: $ - Prior Use Fee: $ $ 1 ❑ NEW DEVELOPMENT Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use $ X ❑ OTHER MITIGATION FEE RECOMMENDATION: INDEPENDENT FEE CALCULATION: $240.00 + consultant fee $ TOTAL TRANSPORTATION IMPACT FEE $ City of Edmonds, Engineering Division Approval Date 'No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.