Loading...
APPROVED RESUB1 BLD2024-0359+STRUCTURAL PLANS +6.14.2024_7.18.33_PM+4324775SHEARWALL SCHEDULE SW EXP Notes apply as called out in table below. 1 Anchor bolts embedded at least 7", or'/z"0 *Titen-HD w/ 4" min embed. See detail SWB. 2 *MASAP can be installed instead of sill bolts with washers. When replacing 1/2"0 sill bolts use 7-10dx11/2" nails (minimum nailing) and when replacing 5/s"0 sill bolts use 9-10dx1'/2" nails (maximum nailing). 3 See detail SWE Connections vary depending on condition. 3a May substitute 16d toe nails @ 8"oc for #A35. 4 See detail CTS. 5 See detail SWB. 6 Abutting panel edges require a 2-2x (lamination connection same as WALL BASE PLATE), 3x, or greater stud. 8 The plate washer shall extend to within 1/2" of the edge of the bottom plate that receives the sheathing or rim. At double -sided shearwalls, stagger on both plate edges. SHEAR FLOW CONNECTIONS / SPACING S SILL -TO - FLOOR -TO - ROOF -TO - WALL BASE PLATE CALL FOUNDATION 1, 2 SILL &WALL WALL 4 5 OUT 5/8"0 @ 60"oc or #A35 @ $SDWS @ 16d @ 10"oc A /�i 1/2"0 @ 60"oc 32"oc 3a 12"oc 5/8"0 @ 60"oc or *A35 @ *SDWS @ 16d @ 8"oc B 1/2 "0 @ 48"oc 32"oc 12"oc 5/8"0 @ 48"oc or *A35 @ *SDWS @ 16d @ 4"oc 1/2"0 @ 32"oc 16"oc 12"oc HOLDOWN SCHEDULE Iv WALL SHEATHING CALL OUT SHEATHING THICKNESS EDGE NAILS 6 7/16" 8d @ 6"oc 2 7/16" 6 8d @ 2"oc 1 Deepen the foundation as needed to provide the required holdown embedment into the foundation wall. See Detail MHE 2 Fasten to the end framing members of the shearwall, u.n.o. 3 FOUNDATION ANCHOR may be extended with threaded rod and coupler as required. 4 Provide the minimum embedment and edge distances specified by the manufacturer. 5 Attach to (2) 2x studs minimum (lamination connection same as WALL BASE PLATE; stagger nails), u.n.o. 6 See detail HDNfor installation. HOLDOWN / STRAP 1, 2, 4, 6 FASTENERS 5 FOUNDATION ANCHOR 1, 3, 4, 6 END POST, TYP U.N.O. 6 COMMENTS *HTT4 18-10d common $SSTB16 3-2x6 8" Min Stem *HTT4 18-10d common 5/8"�T.R. 3-2x6 6" Min Stem, See Detail EPX GENERAL STRUCTURAL NOTES continued WOOD STRUCTURAL PANELS shall meet the performance standards of the "APA" DOC PS1 and PS2 for their intended application (group 5 species not allowed). SHEARWALLS are indicated on the plans with a bold dashed line and labeled SW. The following letter designation refers to the Shearwall Schedule's SHEAR FLOW CONNECTIONS / SPACING table, and the number designation refers to the WALL SHEATHING table. Multiple combinations of letter and number designations may be present. Wall Line numbers, shown inside triangles, refer to corresponding engineering calculations. Attach rated sheathing (indicated below) to 2x min STUDS spaced no more than 16"oc, u.n.o. See Shearwall Schedule for minimum thickness and fasteners (thickness at point of fastened edges governs shear values). All panel edges shall be blocked. Nail intermediate supports @ 12"oc. Do not penetrate nails past flush. Install squash blocks under the ends of all shearwalls where the framing below does not provide full bearing. Construct cripple walls same as the shearwall above, and gable -ends same as the shearwall below. Rated sheathing: 7/16" OSB rated with a 24/16 span rating. 1/2" CD with a 32/16 span rating. See applicable detail(s): SWE ROOF DIAPHRAGM Install either OSB or CD sheathing: 3/4" OSB rated sheathing with a 48/24 span rating; panel clips required when spacing is greater than 20" oc. 3/4" Plywood rated sheathing with a 48/24 span rating. Use 8' x 4' panels with long dimension perpendicular across supporting framing. Stagger panel rows half the long dimension. Nail all boundaries and supported edges with 10d @ 6"oc and interior supports with 10d @ 12"oc, blocking not required u.n.o. FLOOR DIAPHRAGM Install minimum 23/32" rated Sturd-I-Floor T&G with a 24oc span rating. Use 8' x 4' panels with long dimension perpendicular across supporting framing. Stagger panel rows half the long dimension. Glue and nail all boundaries and supported edges with 10d @ 6"oc and interior supports with 10d @ 12" oc, blocking not required u.n.o. COLLECTORS Diaphragms shall be nailed continuously to rims, drag struts, drag trusses and other collector elements at boundary spacing, u.n.o. See applicable detail(s): DTC CS CONNECTIONS and fasteners shall be per CODE Table 2304.10.1 u.n.o. The symbol, "*", indicates a hardware connector from the most current Simpson Strong -Tie Catalog. Hardware with equivilent or greater capacities from other manufacturers may be substituted, example you can use USP's Dual Specification Chart to make an equivilent or greater capacity selection. Install per the manufacturer instructions. Fasteners and hardware in contact with pressure treated wood shall be hot -dipped zinc -coated galvanized. NAILS All nails shall be "Standard Common" size per the latest edition of the National Design Specification for Wood Construction (NDS) u.n.o. HOLDOWNS See the HOLDOWN SCHEDULE. See applicable detail(s): HDN HOC POSTCAPS Provide a post cap on isolated columns that most nearly matches the actual member size(s) U.N.O. Each connection shall have a minimum of (3)10d to the post and (3)10d to the beam. HANGERS Model numbers will be specified on the plans for conditions that require more than minimum capacity, otherwise see CONNECTIONS. When a hanger is not specified on the plans, use any size specific model number that fits that member. Always use MAX NAILING. Hanger to match member size. Notching or shimming of beam not allowed unless specified. JOBSITE SAFETY Sound Structural Solutions Inc has not been retained or compensated to provide design and/or construction review services related to the contractor's safety precautions or to means, methods, techniques, sequences or procedures for the contractor to perform their work. The undertaking of periodic site visits by the ENGINEER shall not be construed as supervision of actual construction and not make him responsible for providing a safe place for the performance of work by the contractor, subcontractors, suppliers or their employees, or for access, visits, use work, travel, or occupancy by any person. OWNERSHIP OF DOCUMENTS These drawings and calculations are the intellectual property of Sound Structural Solutions Inc. These drawings may not be used in whole or in part by any person without permission of Sound Structural Solutions Inc. MISCELLANEOUS The contractor shall verify dimensions and conditions at job site. The contractor shall provide temporary bracing as required until all permanent connections and stiffenings have been installed. Do not scale drawings. Pre -fabricated items to be handled and installed per manufacturer's recommendations. GENERAL STRUCTURAL NOTES CODE All conditions, materials and construction shall conform to the code specified in the DESIGN CRITERIA, or other codes required by the governing jurisdiction. PROTECTION Through maintenance and current best practices, provide a building envelope that will preserve the integrity of the structure throughout it's lifetime. INSPECTIONS Notify Building Department for inspections required by local jurisdiction. SOILS Bearing capacity of soil shall be per DESIGN CRITERIA or greater. Footing shall bear on solid undisturbed level soil devoid of any organic material and below indicated frost line. COMPACTED FILL shall consist of predominately Well -Graded, granular soil, free of organic material and debris. Fill should be placed in maximum 8" loose lifts and compacted to a minimum of 95 percent of the maximum density at optimum moisture content determined by ASTM D-1557 test procedures. BACIGILL shall be free draining and without organic material and debris from one of the following soil classes SM-SC, SM, SP, SW, GC, GM, GP, and GW. FOUNDATIONS AND RETAB04G WALLS Extend footings to undisturbed bearing soil. Do not backfill until all slabs and/or horizontal diaphragms are constructed, otherwise provide temporary bracing to resist movement. See applicable detail(s): FTG SILL PLATES Use pressure treated 2x plates u.n.o. Embed anchor bolts at least 7" (1/2"(� t-Titen-HD w/ 4" min embed). Use 3"x3"x0.229" washers. There shall be a minimum of two bolts per piece spaced not more than 6 feet apart, with one bolt located not more than 12" or less than 4" from each end of each CONCRETE fc = 3000 psi minimum for environmental exposure (2500 psi used in structural design, or unless greater psi indicated on the plans). 5 1/2 sacks of cement per cubic yard of concrete and a maximum of 6 gallons of water per 94 lb sack of cement. Maximum slump is 4". Segregation of materials shall be prevented through proper handling and placement. REINFORCING STEEL #4 bars and larger shall be Grade 60 deformed bars, and #3 bars shall be Grade 40 (u.n.o.), in accordance with ASTM A-615. Lap splices 32 bar diameters u.n.o. Welded wire fabric shall conform to ASTM A-185 and shall be 6x6 - W1.4xW1.4. Lap one full mesh at splices. CLEAR COVER 3" clr when cast against Earth and 2" clr in all other locations, u.n.o. See applicable detail(s): RI FOOTING DRAINAGE Footing drainage per Building Code section 1805.4.2 & Residential Code section R405.1. WOOD FRAMING in contact with concrete or masonry, or exposed to weather, shall be pressure treated. Numbers in parenthesis, IE (1-1), refer to corresponding engineering calculations. CONNECTORS AND FASTENERS Fasteners, including nuts and washers, and connectors in contact with pressure treated wood shall be hot -dipped zinc -coated galvanized. EXCEPTION: Plain carbon steel fasteners, including nuts and washers, in SBX/DOT and zinc borate preservative treated wood in an interior, dry environment shall be permitted. SOLID SAWN LUMBER shall meetthe following minimum grades (u.n.o.) conforming to "WWPA GRADING RULES FOR WESTERN LUMBER', latest edition: BEAMS, POSTS, RAFTERS, JOIST 6X and wider DF#1 4X DF#1 2x 10 and greater DF#2 or SPF#2 2x 8 and smaller SPF#2 WALL STUDS 2x SPF#2 WALL FRAMING & BEARING Walls shall be 2x studs at 16"oc max with double 2x top plate, and 2x base plate (exterior walls shall be 2x6 u.n.o. & interior walls shall be 2x4 u.n.o.). Block all supports solid to the foundation. See applicable detail(s): BHS TPS Full cavity blocks shall be required where party walls intersect exterior walls. BEAM PENETRATIONS Allowable beam penetrations shall be made in the middle third of the span and the middle third of the depth. Contact this office for any penetration outside the allowable area. See applicable detail(s): BP POF ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE APPROVED PLANS MUST BE ON JOB SITE : THE FOLLOWING DOCUMENTATION SHALL BE : AVAILABLE ON SITE FOR THE BUILDING INSPECTOR: FXJ COE APPROVED ARCHITECTURAL PLAN SET FXJ COE APPROVED STRUCTURAL PLAN SET : []COE REVIEWED CALCULATION PACKET ENERGY CREDIT WORKSHEET : SITE PLAN CIVIL PLAN ■ CITY OF EDMONDS BUILDING DEPARTMENT 2021 ■ PLAN INSTRUCTIONS READ THIS FIRST These plans are organized so that more detailed or specific information is found in the same way by following the direction shown below: GENERAL STRUCTURAL NOTES SCHEDULES, DETAILS and PLANS will often refer to GENERAL STRUCTURAL NOTES for more specific information. SCHEDULES DETAILS and PLANS will often refer to GENERAL STRUCTURAL NOTES and SCHEDULES for more specific information. DETAILS PLANS will often refer to GENERAL STRUCTURAL NOTES, SCHEDULES and DETAILS for more specific information. PLANS See the SYMBOL LEGEND as well as ABREVIATIONS AND ACRONYMS for other additional information used on the PLANS. The term, TYPICAL (or TYP), used with a detail callout or plan note, indicates that the information specified shall apply in all similar conditions. IF YOU HA VEANY QUESTIONS OR CONCERNS CONTACT US IMMEDIA TEL Y! We can be reached immediately by phone: (425) 778-1023 For less pressing questions, email us: inbox@ssseng.com Please help us get to your plans by having this job number handy: S2312030 ABBREVIATIONS AND ACRONYMS ABV ABOVE E.S. EACH SIDE O.C. ON CENTER A. B. ANCHOR BOLT E.W. EACH WAY P.T. PRESSURE TREATED BLW BELOW EA EACH REINF REINFORCEMENT BILK BLOCK E.N. EDGE NAILING REQD REQUIRED BLKG BLOCKING EMBED EMBEDMENT SCHED SCHEDULE B.N. BOUNDARY NAILING EXIST EXISTING SIM SIMILAR BTM BOTTOM FDN FOUNDATION STD STANDARD BRG BEARING FLR FLOOR STRUCT STRUCTURAL BTWN BETWEEN FRMG FRAMING SW SHEARWALL CLR CLEAR FTG FOOTING THRU THROUGH CLTR COLLECTOR G.T. GIRDER TRUSS T.R. THREADED ROD CONIC CONCRETE GR GRADE TYP TYPICAL CONN CONNECTION HORIZ HORIZONTAL U.N.O. UNLESS NOTED CONT CONTINUOUS MAX MAXIMUM OTHERWISE CTR CENTER MFG MANUFACTURED VERT VERTICAL DBL DOUBLE MIN MINIMUM w/ WITH DET DETAIL o/ OVER w/o WITHOUT E.E. EACH END oc ON CENTER W.W.F. WELDED WIRE FABRIC DESIGN CRITERIA Governing Code 18 IBC Risk Category H Wind Design Data Earthquake Design Data Gravity Load Data Roofs: loads are psf Dead Live Snow Rafters' -Pitches < 8:12 15 0 25 Floors: loads are psf Dead Live Snow Joists5 12 40 0 Notes apply as called out in table above. 1 Rafters of sawn lumber or wood I -joists. 5 Joists of sawn lumber or wood I -joists. Assumed Soil Data Allowable Soil Bearing 2000 psf Basic Wind Speed (3 sec gust) mph 98 Surface Roughness B Wind Exposure Category B Seismic Importance Factor, 1,.1.00 Site Classification D 1-Second Acceleration, S1 0.453 Seismic Design Category D Spectral Response Coefficient, SIDS 1.029 Spectral Response Coefficient, Sol Seismic Base Shear, V (Transverse) 1534 Ibs SSS Number: s2312030 Project Name: 8722 Main Street (00 A rn E Owner: Glenn &Beth Farley Project Location: 8722 Main Street, Edmonds, WA Design Professional: Franklin Architecture M c.n N ZO O H � J O� "-I Ln J w � z O ~ U V rn p z � w O V O O u7 rn u7 O � TESL/F WAS 201 373 �,4 RF STEQ�� \+� 2� This space reserved for governing jurisdiction stamps RESUB Jun 17 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2024-0359 ORIGIN DATE: 3/14/2024 REVISED: 6/13/2024 Internal Pressure Coefficient 0.18 Topographic Factor, Kt 1.00 Ground Elevation Factor, � 0.99 BOTTOM PLATE #PSPN516 w/ 8-16d NAILS INTO FLOOR SHEATHING TOP PLATE, E.S. #PSPN58 w/ 1-8d NAIL INTO #PSPN58 PLUMBING BASE PLATE, E.S. PLUMBING O O FLOOR #PSPN516 NOTCH AS WALL STUD, REQUIRED TYP DBL TOP PLATE [!:7 WALL STUD, TYP ELEVATION VIEW TOP PLATE NOTCH BOTTOM PLATE NOTCH PLAN VIEW PLAN VIEW PENETRATION OF FRAMING - EXTERIOR WALL N.T.S. #CS16 w/ MIN (11) -10d FASTENERS DIAPHRAGM PER MEMBER, U.N.O. COLLECTOR COLLECTOR BEAM OPTIONAL STRAP LOCATION - COLLECTOR STRAP #CS16 w/ MIN (11) -10d FASTENERS PER MEMBER, U.N.O. DIAPHRAGM COLLECTOR COLLECTOR TIGHT -FIT SPLICE OPTIONAL STRAP LOCATION - COLLECTOR STRAP COLLECTOR SPLICE N.T.S. CSAB BOUNDARY NAIL ALONG LENGTH OF COLLECTOR COLLECTOR BOUNDARY NAIL ALONG LENGTH OF DIAPHRAGM PER STRUCT NOTES INTERMEDIATE FRAMING DIAPHRAGM TO COLLECTOR ABUTTING PANEL EDGES PENETRATIONS IN THIS AREA DO NOT REQUIRE APPROVAL FROM THE ENGINEER DO NOT MAKE PENETRATIONS OR NOTCHES HOLES MUST BE ROUND AND ARE LIMITED TO IN THE SHADED AREA OF THE BEAM WITHOUT MIN CLEAR SPACING V2"0 OR%o DEPTH OF MEMBER, UNLESS PRIOR APPROVAL OF THE ENGINEER SHALL BE 8x THE APPROVED BY THE ENGINEER DIAMETER OF THE L/8 —� LARGER HOLE L/B d//44 DEPTH d/2 O O U d/4 L/8 ) L/2 ) L/8 L DEPTH DO NOT MAKE PENETRATIONS OR NOTCHES IN THE SHADED AREA OF THE BEAM WITHOUT PRIOR APPROVAL OF THE ENGINEER DEPTH GLB MIN CLEAR SPACING SHALL BE 2x THE DIAMETER OF THE LARGER HOLE PENETRATIONS IN THIS AREA DO NOT REQUIRE APPROVAL FROM THE ENGINEER SPAN Y3 SPAN % SPAN s PAN SAWN BEAM PENETRATIONS, TYPICAL DETAIL Sib 1311 1 #HTT4 1 I � 411 (3) 2x6 r�115 U.N.C. 4 HTT4- A HDN HOLDOWNS N.T.S. BPAA I I N.T.S. HDNA EXTENT OF SHEARWALL EXTENT OF rnrnnl r rrl In SHEARWALL n„I Inl r Tnn nl "Tr fTPSTSWin VI\ll I LL JIVV V/lVL I Vll L OR HOLE THAT CAN BE ADDED TO AS HEARWALL SWE SHEARWALL ELEVATION DIAPHRAGM BOUNDARY NAILS ROOF DIAPHRAGM PER STRUCTURAL NOTES BEAM/COLLECTOR #SDWS 0.22" 0 x 6" PER SHEAR WALL SCHEDULE, SHEAR WALL 12"oc MIN COLLECTOR TO SHEARWALL DBL 2x STUD EDGE NAILING HOLDOWN EMBEDDED STRAP STUDS PER HOLDOWN SCHED EDGE NAILING 2x STUD HOLDOWN AT CORNER SW SHEATHING STRAP SHOWN AROUND CORNER __J N.T.S. MGKAT L__J N.T.S. N.T.S. HOCA (Q� 1 rA GVGnII v conrrn 4N SPLICE TOP PLATE SPLICE DOUBLE TOP PLATE SPLICE N 2x DISCONTINUOUS DBL TOP PLATE POST BEAM #CS16 w/, (13)10d NAILS EA END DISCONTINUOUS DBL TOP PLATE N.T.S. DTCA L N.T.S. TPSA WALL ANCH PER SW SCHED EDGE NAILS 2x SILL U.N.O. PER SW SCHED HOLDOWN SHEARWALL FDN THREAD ROD PER HLDN SCH SHEARWALLS TO FOUNDATION FRAMING 4x RIM 2'-0" MAX DBL STUD WALL BASE WALL 14" MIN EACH SIDE PLATE CONN PONY WALL, PER SW SCHED DIAPHRAGM PER CONSTRUCT PROVIDE COUPLERS AS STRUCT NOTES PER SW ABOVE REQD TO EXTEND RIM/BLKG ANCH PER U.N.O. THREADED ROD TO HOLDOWN SW SCHED EDGE NAILS 2x SILL U.N.O. FDN PER SW SCHED EMBEDMENT PER HOLDOWN SCH SHEARWALLS TO FLOOR TO FOUNDATION PONYWALL ADD'L REQUIREMENTS (IF OCCURS) SWB SHEARWALL BASE PLATE & FND CONNECTIONS N.T.S. SWBA ""l & #CS16 .6)10d HOWN Q STUDS REQUIRED STUDS BEAM 2x4 WALL 2x6 WALL 4x & 2-2x (SAWN) 3%x (GLB) (2) 2x4 (2) 2x6 3/2x (MANF) 6x & 3-2x (SAWN) 5%x (GLB) (3) 2x4 (3) 2x6 5%x (MANF) 8x (SAWN) 6%x (GLB) (4) 2x4 (4) 2x6 7x (MANF) GIRDER TRUSS (3) 2x4 (3) 2x6 REQUIRED TRIMMERS HEADER 2x4 WALL 2x6 WALL 4x & 2-2x (SAWN) 3%x (GLB) 2x4 2x6 3/2x (MANF) 6x & 3-2x (SAWN) 5%x (GLB) ---- (2) 2x6 5 qx (MANF) REQD TRIMMERS NOTE: BEAR BEAMS ON THE FULL WIDTH AND BREADTH OF THE MINIMUM SUPPORTS PER TABLES ABOVE UNLESS NOTED OTHERWISE ON THE PLANS BHS BEAM & HEADER SUPPORTS N.T.S. SSS Number: s2312030 Project Name: 8722 Main Street Owner: Glenn & Beth Farley Project Location: 8722 Main Street, Edmonds, WA Design Professional: Franklin Architecture M c.n N O � O H 0 J w Ln c.n (V J w � z E O V V H p z p w V) 0 V O O O C LESL/F WAS rn 201 373 c�,4 STEQ�� 1ss� �sS�ONAL��G This space reserved for governing jurisdiction stamps RESUB Jun 17 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT I BLD2024-0359 ORIGIN DATE: 3/14/2024 REVISED: 6/13/2024 S210 DIAPHRAGM BOUNDARY NAILS DIAPHRAGM PER STRUCTURAL NOTES JOIST/BEAM HANGER 2x12 P.T. LEDGER w/ (2) ROWS %" O x 6" #TITEN-HD @ 16" oc EXISTING FOUNDATION WALL 1 �1 1mm FLOOR LEDGER TO FOUNDATION N.T.S. PLAN VIEW 6x8 BEAM, U.N.O. A -I SECTION A -A #HGA10KT E.S. w/ (4) q" x 3" #SDS TO 4x8 BEAM (4) q" x 1%" #SDS TO 6x8 BEAM 4x8 BEAM 6x8 BEARS ON PLATE, 2" BEARING LENGTH BEAM TO BEAM CONNECTION DIAPHRAGM BOUNDARY NAILS JOIST HANGER 2x12 LEDGER w/ (3) #SDWS 0.22" x 3" SCREWS INTO EXISTING RIM @ 16"oc MAX SHEAR WALL LEDGER TO RIM N.T.S. RAFTERS L — — — r� 4x8 BEAM BEAM TO BEAM CONNECTION N.T.S. L-i N.T.S. EXISTING RIM 4x10 BEAM #HGA10KT E.S. w/ (4) q" x 3" #SDS TO 4x8 (4) q" x 1%" #SDS TO 4x10 SSS Number: s2312030 Project Name: 8722 Main Street Owner: Glenn & Beth Farley Project Location: 8722 Main Street, Edmonds, WA Design Professional: Franklin Architecture M c.n N ZO � O H o J w Ln c.n N J w � z E O V V H C� p z p w V) O V O O 07 C� O TESL/F WAS rn 201 373 STEQ�� 1ss� �sS�ONAL��G This space reserved for governing jurisdiction stamps RESUB Jun 17 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2024-0359 ORIGIN DATE: 3/14/2024 REVISED: 6/13/2024 S211 d D 180° 4d or 2%" MIN. BAR D #3 1 %" #4 2" #5 2 %" #6 4%" #7 5%" #8 6" LEGEND d = BAR DIAMETER D = FINISHED BEND DIAMETER Note: 1. STANDARD HOOKS SHALL CONFORM TO ACI 318 SECTION 25.3 12d 2. REINFORCING SHALL BE COLD BENT. STANDARD HOOKS N.T.S. SHA HOLDOWN ANCHOR e FOUNDATION WALL — MINIMUM STEM HEIGHT REQUIRED TO ACCOMMODATE ANCHORAGE PER HOLDOWN SCHEDULE FOOTING 1 L---J STD 900 HOOK INTO INTERSECTING GR BEAM • GR BEAM �....T*.�,.,. REINF MATCH HORIZ REINF V-6n CORNER BAR @ ALL OUTER REINF r REINF STD 900 HOOK INT MATCH HORIZ �o \ INTERSECTING GR BEAM REINF ALTERNATE EA BAR V-6n CORNER BAR @ ALL OUTER REINF l REINFORCEMENT AT INTERSECTIONS N.T.S. DIMENSIONS ASSUMED IN DESIGN VERIFY DURING CONSTRUCTION 14" MIN CONCRETE WALL 7 18" MIN 8" MIN CONCRETE FOOTING 14" MIN REM REMODEL VERIFICATION N.T.S. e HOEDOWN e ANCHOR e EMBEDDED STRAP I / / NOTES: , / -HTT4 holdown EMBEDDED STRAP -(18) 0,148" x i%" nails / -5/8" diameter threaded rod (A307) -12" embed into the concrete, u.n,o. -Simpson SET-3G epoxy t -Follow the manufacturers specifications for installing the anchor and hardware http://www.strongtie.com/products/anchorsystems/adhesives/adhesive_ anchorinq install.html# DEEPEN FOUNDATION AS REQD TO ACCOMODATE FOR HOLDOWN EMBEDMENTS INTO WALL MINIMUM HOLDOWN EMBEDMENT N.T.S. ? 4 cycles seconds (mina seconds [min.) — (min.) 80 80 psi min. psi min. EPDXY - HTT4 RETROFIT N.T.S. NON -SHRINK GROUT: SHALL MEET ASTM C 1107 2000psi in 24 hours 6000psi in 28 days PLACEMENT: Use a mixer large enough to permit continuous placement before any part of the grout has set. Place the grout quickly. Rodding the grout lightly will help move material. Avoid vibration which can cause bleeding and segregation. The air, mix & substrate temperatures should all be between 40OF (4.4°C) and 90OF NON -SHRINK GROUT TOP OF GROUTED BASE PLATE RIAA L__J N.T.S. #4 CONT w/in TOP 12" OF WALL FINISH GRADE 8 U.N.O. 8'-0" MAX 16" MIN #4 @ 48"oc VERT '� \ #4 AT BTM CONIC FTG 16" WIDE x 8" THICK w/ (2) #4 CONT, U.N.O. 3" CLR " M" MAX) } P.T. SILL PLATE & A.B. CONC STEM WALL CTRD ON FTG, U.N.O. 1 T-0" MAX FINISH GRADE BETWEEN �\\\\ j� GRADES I�� I #4 @ 48"oc DOWELS w/ 14" EXTENSION INTO WALL & STD HOOK IN FTG NOTES: -CENTER VERTS AND DOWELS IN STEM WALL -DEEPEN FOUNDATION AS REQD TO ACCOMODATE FOR HOLDOWN EMBEDMENTS FWSJ FOUNDATION WALL - STEM REM N.T.S. FWSC AMR EMBED REBAR INTO EXISTING FDN WALL (DRILL & SET-XP EPDXY 4" MIN) MATCH THE SIZE, SPA OF THE NE EXISTING WALL EXISTING FTG NEW FDN IS HELP ILLUS- THE NEW TO EXISTING FOUNDATION N.T.S. NEFA 5" I'%" w/ (4) %" 0 A.B. 8 MIN EMBED INTO FTG GBP 1011 3" i 4" i 3" STEEL ASSEMBLY PER ARCHITECTURAL GROUT SHALL EXTEND A -A TO FACE OF WALL 7 STEM WALL STEP, 8" MAX .. #3 TIES @ TOP, BOT & MID -HEIGHT, #4 VERTS (3 TOTAL) AT BRACED o P ENCLOSE VERTS & ANCHOR BOLTS FRAME CONNECTION w/ STD HOOK INTO FTG, TYP P • 2" CLR 10" THICK WALL (2) #4 HORZ @ TOP & BOT CONT. 12" THICK x 36" x 36" FTG w/ v o P (5) #4 EA WAY AT BOT . D � P 7° P. 'P•D. � D P P . P D P P 1'-0" P• • P V D . EMBED > ,� P 7 'v D v * . PD P Y' p P ° P. 411 �� =1 I I=1 11=1 I I� 11=1TI=1 I �I 11=1 11=1 I DBL NUT, TYP 3 CLR 1=1 I I=1 I I I BRG SOIL I I—III=1 I I=1 I I - BRACED FRAMED TO FOUNDATION CONNECTION N.T.S. 4" V-0" 4" 4" 4" STEEL ASSEMBLY PER TY2' w/ (4) %" 0 A B ARCHITECTURAL 8" MIN EMBED INTO FTG 'r,T GBP GROUT SHALL EXTEND A A TO FACE OF WALL P �p P ' P. a #3 TIES @ TOP, BOT & MID -HEIGHT, P 2" CLR ENCLOSE VERTS & ANCHOR BOLTS �, .. ' D. . P " 12" 0 PLINTH (4) #4 VERTS w/ STD HOOK INTO FTG 12" THICK x 36" x 36" FTG w/ P ; ; (5) #4 EA WAY AT BOT P y . 1' 0° EMBED b D. D P o D P• v. P b ' . b •° P 311 CLR 1=1 I I —III —I BRG solL I I —III —I 11=1 I- DBL NUT, TYP I I I I I I I I I I I I I'' III"I I II II I I I I I I - PLINTH ON FOOTING N.T.S. 2" MIN CLR SECTION A -A 2" C 2'-0" MIN 2'-6" MAX SECTION A -A SSS Number: s2312030 Project Name: 8722 Main Street Owner: Glenn & Beth Farley Project Location: 8722 Main Street, Edmonds, WA Design Professional: Franklin Architecture M o � o 1--I 000 J � O� w Ln 1714 J w � z O V U H ul) z 07 w O V 6 O 07 rn Ln O C TESL/F WAS rn 201 373 c�,4 STEQ�� 1ss� �sSIONAL��G This space reserved for governing jurisdiction stamps RESUB Jun 17 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT I BLD2024-0359 ORIGIN DATE: 3/14/2024 REVISED: 6/13/2024 S212 SYMBOL LEGEND SLEXP #HOLDOWN MODEL HOLDOWN Represents holdowns which are located at the bottom of the wall where it is called out. Connections are wall-to-wall or wall -to fdn u.n.o. Connections per the HOLDOWN SCHEDULE. CONCRETE WALL AND CONTINUOUS FOOTING See CONCRETE and REINFORCING BAR specifications per DETAIL FWS. 10" STEM WALL w/ (2) #4 CONT TOP & BOT, #4 VERTS @ 16"oc w/ STD HOOK INTO FOOTING F_ V-6" TYP I I BEAM CONNECTION PER ARCHITECTURAL, TYP I- 1' 0" � 5" FOUNDATION PLAN & FLOOR FRAMING 1/4" = V-O° DO NOT SCALE - VERIFY ALL DIMENSIONS WITH ARCHITECTURAL SHEETS PRIOR TO CONSTRUCTION SSS Number: s2312030 Project Name: 8722 Main Street Owner: Glenn & Beth Farley Project Location: 8722 Main Street, Edmonds, WA Design Professional: Franklin Architecture M c.n N O � O H o J O W Ln c.n N W Z E O ~ U V_ H CC � V) r) C z W V7 O U C: O rn O C TESL/F WAS rn 201 373 STEQ�� 1ss� �sS/ONAL��G This space reserved for governing jurisdiction stamps RESUB Jun 17 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2024-0359 ORIGIN DATE: 3/14/2024 REVISED: 6/13/2024 S310 SYMBOL LEGEND ------------------- DIAPHRAGM BOUNDARY Represents boundaries of the FLOOR DIAPHRAGM and ROOF DIAPHRAGM. DIAPHRAGM PROJECTION Represents elements such as roof eaves, facades, and the like. SHEARWALL Represents walls which are shearwalls and shows the extents of that wall. Connections per the SHEARWALL SCHEDULE. #HOLDOWN MODEL HOLDOWN Represents holdowns which are located at the bottom of the wall where it is called out. Connections are wall-to-wall or wall -to fdn u.n.o. Connections per the HOLDOWN SCHEDULE. JOIST, TRUSS, OR RAFTER Repetitive member symbol points in the direction of the span. The type, size and max spacing between members will be indicated in bold type with a symbol which is representative of the layout of the entire level. POST Indicates the location of a post within walls below framing. Sizes are indicated on the plan. Grades are indicated in the GENERAL STRUCTURAL NOTES, U.N.O. on the plan. Consult detail BHS for posts not indicated on the plans. INTERIOR BEARING WALL Indicates interior walls which support repetitive members. Construct per WALL FRAMING & BEARING in the GENERAL STRUCTURAL NOTES, U.N.O. on the plan. JL_ u HANGER Indicates hanger, standard or concealed flange. Provide fasteners in all holes. Reference the GENERAL STRUCTURAL NOTES for the minimum size hanger. If a different model no. is required, it will be noted on the plan. BEAM Represents the location of a beam or header. Sizes are indicated on the plan. Grades are indicated in the GENERAL STRUCTURAL NOTES, U.N.O. on the plan. (D- STEEL BEAM SECTION PE ARCHITECTURAL,TI 1Y4` MAX BOTTOM NOTCH F SUPPORT PERMITTED, T) POLYCARBONATE ROOF PA PER ARCHITECTURAL STEEL ORDINARY BRACED FRAME w/ %" O ROD BRACES & CLEVISES RATED FOR 14,000# (1.0E) ULTIMATE LOAD, 9800# (0.7E) ALLOWABLE, DETAILS PER ARCHITECTURAL 0 EXIST'G HOUSE TO REMAIN AS -IS, U.N.O. FIRST FLOOR SHEARWALLS & ROOF FRAMING ABOVE 1/4" = V-0° DO NOT SCALE - REFER TO ARCHITECTURAL SHEETS FOR DIMENSIONS SSS Number: s2312030 Project Name: 8722 Main Street Owner: Glenn & Beth Farley Project Location: 8722 Main Street, Edmonds, WA Design Professional: Franklin Architecture M c.n N ZO � O H 0 J O W Ln c.n N W Z E O ~ U V_ H CC 6 V) r) C Z W V7 O U r� X O c LESL/F WAS rn 201 373 c�,4 STEQ�� 1ss� �sS�OIN L This space reserved for governing jurisdiction stamps RESUB Jun 17 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2024-0359 ORIGIN DATE: 3/14/2024 REVISED: 6/13/2024 S411 0 M O ('V M C4 U, I V1 I 0 v [V