Loading...
REVIEWED BLD2024-0193+CALCS+2.13.2024_12.18.15_PM+4056980RECEIVED Feb 14 2024 CITY OF EDMONDS B LD2024-0193 DEVELOPMENT SERVICES DEPARTMENT ..........REVIEWED ,.,.,...,. BY CITY OF BUILDING DEPARTMENT Dudley EDMONDS Ross Residence ............................................... Remodel Structural Calculations 1055 Daley Street Edmonds, WA 98020 Snohomish County Sidesway Project No. 23111.01 Prepared By: SIDE5 WAY ENGINEERING Dudley Ross Residence Remodel February 12, 2024 Project No. 23111.01 Project Description Sidesway Engineering was retained by PNW Design & Remodel to perform analysis and design as necessary to obtain a building permit for the proposed remodel at the existing single family residence located at 1055 Daley Street in Edmonds. The remodel work includes the removal of the interior bearing wall on the main floor to open up the kitchen to the dining room. The existing home is conventionally framed with wood atop a continuous exterior daylight basement wall and footing. The original house plans were not available for our use and the existing house framing and dimensions were obtained during a site visit performed by our firm. During the site visit, we observed that the upper floor framing consists of 2x6 rough sawn joists at 21"oc spanning approximately 12'. These joists support the floor and roof framing above. Since the framing will be exposed during the kitchen remodel, we recommend upgrading these joists to meet current code requirements by adding 1.75" x 5.5" LVLs between each existing joist. Similarly, the main floor system consists of 2x8 joists at 24"oc. These meet code requirements, however deflect 0.51" or L/269. To increase stiffness and prevent non-structural damage in the new kitchen, we also recommend doubling up these joists as well for the extent of the remodel. Scope of Work Provide gravity calculations for the proposed remodel as required to obtain a building permit. The interior remodel work does not affect the existing lateral system of the house, and therefore wind and seismic analysis was excluded from our scope of work. Design Criteria 2018 International Building Code (IBC) 2018 International Existing Building Code (IEBC) ASCE 7-16 Minimum Design Loads for Buildings and Other Structures Applicable Material Reference Standards (ACI, MSJC, AISC, NDS) This is a Risk Category II structure designed for the following loads: Dead Loads: Snow Load: Live Load: Project Summary 12psf (roof & floor) 25psf 40psf (residential) The new framing as designed in the following calculations conforms to the 2018 IBC and IEBC. Refer to the construction drawings as well as the following calculations for structural framing requirements. Disclaimer This calculation package is based on the documentation that was available to us. Sidesway Engineering did not perform a complete as -built to verify the accuracy of all the provided data and we should be contacted if there are any discrepancies with the assumptions contained within these calculations. We assume the structure has no known deterioration or damage that would adversely affect capacity. 20305 871h Avenue W. SIDE5WAY Edmonds, WA 98026 (425)673-4160 E NG I NE E R I I.0 SIGN t4"S (A C OVCAW Iic 6 R.OaF 7V R6 Fuv2 /Z )03F t' l v� �r IaG�J it A �/Q Ps F sNoW zs PS F (;uoPC— -1 4MOU6 WNvL, k7r.�61v ro opoo Hou�6 UP, Wll�t secp '%KT VP(.Mhf, Lc sm POP - Pl), PZ, S 8 P 2,,q Ord L vvl, Tv ILEA k'//'C t1 sL = tl 7 c.gS (Lo"5 P r OF �' F�t-UM RrSuJ c. X SP�cn► � W Z = CI ZPSF pLfi 4o PSF �� = 1SR gip(.+ 69�Q,I- 15�%- = %'ff 109'OL t-165 "LL 4-9(o'39c : 3,-)�# Sk, STA- OF- "D i37wti G-4csT IaIS73 C 2.('`oG R(k 1 Ott 0 N, : 0r23 f�h 0" 5 ( '(� 7 O'R �` USE 1-0 LIMIT L�S' < -1171Y0 � SY UsC_ Hu (ill/5 1 Ccr5j. JbI Ic (IYY?C Description By Project No. --• � (i�u` � �N� C�C3 t1 Date .7 lq 2 � , U ID E WAY Project �v��� ��� �� Checked Sheet No. ENGINEERING V Date N(V Ph# I w Ozx 9 t %�� 666 k� Zx �a � Us 33o Rf L,+ 07 P�5L) 79 y -7 f5sy 4dt+ )Oy& "�C j- fil -� .S(�PfM-,r lam/ q?(6 DF fi5T 64, C,,% , CWT. Powy ! (, /C W& Fv071N & F N(� ►N Q1+ � ,' ltv� c (��ih�( J(� 1S00P&F i- 110 fcf - 6 ( ; Zl�MF USG 2= PS oc 19 tt x rs' 1 k 21! PrG LJ/ (7) #-� (A PJA-.,J O�WG- RLYT)0rO ON 3' Tltit Ste:N\ 2- (Z'' OAJT , M, ADOVAS, Ay MP&t;no&J ctufV C.c.) v = S�SUsS ev sT. 2x 2`1,0C, A4> WAMfiE LS, Mf F� — !(( MIN, MWV&G - WC a--t-oAlo"D UPG1La IO& TZ' AOU(C ktD crOC, Oi&T- 12('00 d - 0,Z,Ir= 'P(,ilZ- �( JCS l� Pj riz W" 1Z`�IZrs� tuorSf=� U5C�-gk� % _ -7 ``lr, = D,YZ p = D,oS�i ... Description 6 N, v 1 Ty _n ^ r1V ! By n , Project No. 1 v�l- � l� Date 2 f V, Z'I IDE WAY Project ^ U�� �� �� S Checked Sheet No. — Date u Date (/