Loading...
REVIEWED BLD BLD2024-0874+Structural_Analysis_or_Calculations+7.3.2024_4.40.24_PM+43588361 of 22 LONGITUDE ONE TWENTYO ENGINEERING & DESIGN calculation Package for Foundation Stablllzatlon/Left STRUCTURAL ENGINEER L120 ENGINEERING & DESIGN 1315091s'PLNE KIRKLAND, WA 98034-5901 503 9th A ve N Edmonds, WA 98020 Project no: S240327-1XR May 151, 2024 . ■ ■ • . •''� . T H URA' • ■ r •cc r�, vim• '. S�QNAL EN.' Prepared for: R&R Foundation Specialist 3409 McDougall Ave, suite 204 Everett, WA 98201 P: 425.760.5077 CONTACT: MANS THURFJELL, PE EMAIL: MTHURFJELL@L120ENGINEERING.COM PHONE: (425) 636-3313 (425) 636-3313 L120Engineering.com ._._._._._._._._._._._._.__—._._._._._._._._._._____._._ PROPERTY LINE .............. ................................. 177'.0"' — I ------------------------------- PILE SPACING & LOAD RE011IRMENTS TABLE MAX O.C. SPACING, R MINVERTICAL CAPACITY, kip. PROOFTESTING LOAD, kip. PILE PILE TYPE BTWN PILES END OFFSET ALLOWABLE LOADING 200%MINVERTN:ALCAPACffY (MIN ULTIMATE CAPACDY) LOCATION 1-19 HELICAL 60' TV 150 kip 30.0 kip PER PUN 2023 HELICAL B-0• 3'-0• 10.0 kip 20D1op PER PIAN NOTES: a. MINIMUM AND MAXIMUM INSTALLATION TORQUE FOR HELICALASSEMBLIES SHALL BE SPECIFIED BY THE PILE MANUFACTURER. THE MINIMUM INSTALLATION TORQUE SHALL BE HIGH ENOUGH TO ACHIEVE THE REQUIRED BEARING CAPACRY LOADING, INCLUDING A SAFETY FACTOR NO LESS THAN 2. THE MAXIMUM INSTALLATION TORQUE SHALL NOT EXCEED THEALLOWABLE TORSIONAL CAPACITY OF THE PILE SHAFTS OR ANY PARTOF THE PILE ASSEMBLY. MAXIMUM INSTALLATION TCRDUE RATING OF8,300FPLB8 FOR A 2-T18INCH DIAMETER HELICAL PILE WITH 0203INCH SHAFT WALL THICKNESS PER ESRdi50. b. HELICALASSEMBLIESAS MANUFACTURED BY IDEAL WNUFACTURING, INC., IN ACCOROANCE WITH ESR-3T50. c. PILE OR ANCHOR LOADS NOT TO EXCEED MAXIMUM CAPACITYAS DETERMINED BY THE MANUFACTURER FOR ANY PART OF THEASSEMELY. U. MAXIMUM ON -CENTER SPACING LISTED FOR TYPICAL PILE INSTALLATION UNLESS NOTED OTHERWISE ON PI -AN. i SITE PLAN NOTES 1. VERIFY EXISTING STRUCTUREBANDALL DIMENSIONS ON SITE. 2. FOUNDATION DIMENSIONS ARE TO OUTSIDE FACE OF CONCRETE STEM WALL PER MR FOUNDATION SPECIP 1U (MR) LEVEL SURVEY. I 3. REFER TO STRUCTURAL CALCULATIONS PACMGE BY L120 DATED MAY 15, M4, FOR ADDITIONAL INFORMATION, SPECIFICATIONS, AND i REQUIREMENTS. i 4. LEVELBURVEY PERMRPROPOSALDATEDMARCH6,2024.REFERTO STRUCK CALCOATIONSPACKAGEFORMODIF(CATIONSAND • • • • • • • • • • • • • • • ADDITIONAL REQUIREMENTS FOR LEVEL SURVEY. ......... .......... ;•;•T: :: :: :: ::; 5. PARCEL DIMENSIONS APPROXIMATED BY SNOHOMISH COUNTY ASSESSOR GIS MAPPING TOOLS& TUSIFTER INCLUDING THE SELECTED PARCEL. �'�{:::::::::• PROPERTY DIMENSIONSAREAPPROXIMATE FOR REPRESENTATIVE •;•;(•;•;•;•;•;•;•;•;•;• PURPOSES ONLY. NOTTOSCALE. NOTTO BE USEGFORLEGALPURPCSES •;•;(� •;� •;� •;� •;� • OR IN PLACE OF A FIELD SURVEY. .... 6. SITE FEATURES AND SOME UISTING STRUCTURES ON ADJACENT PARCELS i i i NOT SHOWN FOR CIARITY. I i 1 i Z LU W_1 Q rI. Wig H ' &i rn I 1 1 i i PROPERTY LINE PARCEL NO. 27032400220700 LEGAL DESCRIPTION SEC 24 TWO 27 RGE 03 E 190 FT OF S 110 FT OF S112 SE114 SEi/4 NW114 LESS BEG NE COR THOF TH S 11 OFT TH W 15.3FT TH NLY TAP 13.2FTW OF FOS TH E TO POB PER SC #104695 TO CITY OF EDMONDS AKA PAR A OFCITY OF EDM BLA REC AFN 200410195002 OWNER NAME & ADDRESS OLSON GREGORY V & VIVIAN A 503 9fh Ave N Edmonds, WA 98020 NOTE: THE PROJECT WILL NOT RESULT IN CHANGING OF SITE TOPOGRAPHY OR EXISTING DEVELOPED AREAS. NOTE: L120'S SCOPE IS LIMITED TO THE PERIMETER SUPPORT SYSTEMICONTINUOUS FOOTINGS. THE INTERIOR CRAWL SPACE SUPPORTED SYSTEM FOR THE FIRST FLOOR SHALL BE INSTALLED PER R&R. SITE PLAN LEGEND EXISTING RESIDENCE STRUCTURE EXISTING ADJACENT STRUCTURE AREA OF PROPOSED WORK --- PROPERTY LINE • APPROXIMATE DIMENSION 1 HELICAL PILE R&R LEVEL SURVEY STRUCTURAL CALCULATION PACKAGE FOR ADDITIO. REQUIREMENTS SITE PLAN 3 of 22 PROJECT NO. SHEET NO. ,0 PROJECT 503 9th Ave N, Edmonds, WA LONGITUDE SUBJECT Foundation Stabilization/Jackin ONE TWENTYO ENGINEERING & DESIGN BY PAM DATE 05/15/24 Scope/Objective: To determine the required pile spacing and geometry to stabilize and lift (where required) the existing structural foundation. These findings have been based upon the calculated strength of the existing foundation system and the current vertical loading from the existing structure above (based on as -built assessments). The R&R Foundation Specialists' (R&R) proposed pile layout can be found in the following pages with structural recommendations based upon the findings of L120 Engineering & Design. Note that cosmetic damages to rigid wall coverings/members and siding are expected during a foundation lift. Such cosmetic damages/cracks are to be repaired by others following the completion of the foundation stabilization and lifting and are not included in the structural scope presented here. It should be further noted that L120's scope is limited to the perimeter support systems/continuous footings. The interior crawl -space support system for the first floor shall be installed per R&R. This could include the use of some or all of the following: longer support posts, adjustable post -base hardware, and/or the addition of taller wood support members. Settlement in these interior support areas shall be monitored and further adjustments shall be made if necessary. Structural Summary: - The foundation of the residence consists of continuous cast -in -place concrete stem wall and concrete strip footings. Below the footings, piles are to be spaced at a distance no larger than 5-0" on -center at the locations indicated on the attached Level Survey. Piles to be installed in accordance with SSK-01. - End piles are to be placed as close to corners as possible and shall not exceed a max corner offset distance of 3'-0". - A maximum allowable loading of 2,900 plf was utilized in this analysis. This was determined through inspection of building geometry and conservative span/tributary loading assumptions based on standard construction practices - The following load values represent the maximum expected pile loads for the indicated spacing. R&R to provide pile and equipment assemblies with capacities equal to or greater than the indicated load values. Allowable Load Capacity Requirement: Piles 1-19 .............. 15 kip minimum vertical capacity (allowable load) Piles 20-23 ............ 10 kip minimum vertical capacity (allowable load) Note: Refer to the attached General Notes for additional requirements. - As determined by R&R, the site appears to have no lateral (horizontal) displacements or concerns. As such, the analysis and recommendations presented in this report have been strictly limited to vertical stabilization/jacking. If lateral movement is observed or expected additional structural analysis will be required. - Structural recommendations contained in this package are based on site photographs, dated March 8, 2024, and the geotechnical report, dated May 6, 2024, by Cobalt Geosciences. Both the photographs and geotechnical report were provided by R&R and are included within this package. Please inform L120 of site -specific conditions that were unconsidered by, may conflict with, or otherwise compromise the recommendations contained within this package, including, but not limited to, water drainage, slope stability, existing structural damage, or existing subsurface obstructions. In this instance, the structural assumptions, recommendations, and scope for this project will need to be revisited to consider and address the new findings Refer to the following pages for pile and connection specifications. L120 ENGINEERING & DESIGN 4 of 22 GENERAL NOTES HELICAL PILES 1. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED IN ACCORDANCE WITH THE 2021 INTERNATIONAL BUILDING CODE (IBC). 2. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED BY IDEAL MANUFACTURING, INC., AND SHALL BE IN ACCORDANCE WITH ESR-3750. 3. ALL MATERIAL PROPERTIES OF HELICAL PILE COMPONENTS SHALL BE IN ACCORDANCE WITH ESR-3750. 4. CORROSION PROTECTION OF ALL PILE COMPONENTS SHALL COMPLY WITH THE ICC-ES ACCEPTANCE CRITERIA FOR CORROSION PROTECTION OF STEEL FOUNDATION SYSTEMS USING POLYMER (EAA) COATINGS (AC228). 5. ALL HELICAL FOUNDATION COMPONENTS SHALL BE GALVANICALLY ISOLATED FROM CONCRETE REINFORCING STEEL, BUILDING STRUCTURAL STEEL, OR ANY OTHER METAL BUILDING COMPONENTS PER AC358 SECTION 3.9. 6. THE SHAFT SHALL BE DESIGNED AND FABRICATED TO SUPPORT THE SPECIFIED DESIGN LOADS. 7. ONLY MANUFACTURER -APPROVED CONNECTORS, ADAPTORS, AND ACCESSORIES MAY BE USED. 8. HELICAL PILES SHALL BE INSTALLED VERTICALLY INTO THE GROUND WITH AN ALLOWABLE ANGLE OF INCLINATION OF +/- 1 DEGREE FROM VERTICAL PER SECTION 4.2.1 OF ESR-3750. 9. MONITOR AND RECORD DEPTH OF PILE PENETRATION. PROVIDE TORQUE MONITORING DEVICE AS PART OF THE INSTALLING UNIT. MONITOR AND RECORD TORQUE APPLIED DURING THE INSTALLATION OF EACH PILE AT SPECIFIC DEPTHS. 10. HELICAL PILES SHALL BE INSTALLED TO THE MINIMUM TORQUE VALUE REQUIRED TO PROVIDE THE MINIMUM REQUIRED LOAD CAPACITIES INDICATED ON PLAN INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO (2). THE MAXIMUM INSTALLATION TORQUE SHALL NOT EXCEED THE ALLOWABLE TORSIONAL CAPACITY OF ANY INDIVIDUAL COMPONENT OF THE PILE ASSEMBLY. 11. ALL BRACKETS AND HELICAL PILE ASSEMBLY COMPONENTS SHALL HAVE ADEQUATE CAPACITY TO ACHIEVE THE MINIMUM REQUIRED BEARING CAPACITY INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO (2). 12. REPAIR BRACKETS MUST BE CONCENTRICALLY LOADED AND THE BRACKET PLATE MUST BE FULLY ENGAGED WITH BOTTOM OF CONCRETE FOUNDATION. 13. ALL HELICAL PILE ASSEMBLY COMPONENTS MUST HAVE ADEQUATE STRENGTH TO DEVELOP THE TORQUE REQUIRED FOR INSTALLATION AND ALL INDUCED STRESSES. 14. THE PILE QUANTITY, LAYOUT, AND SPACING INDICATED ON PLAN SHALL NOT BE CHANGED WITHOUT WRITTEN APPROVAL FROM THE ENGINEER -OF -RECORD PRIOR TO INSTALLATION. 15. CONTINUOUS SPECIAL INSPECTION IN ACCORDANCE WITH 2O18 AND 2021 IBC SECTION 1705.9 MUST BE PROVIDED FOR THE INSTALLATION OF THE HELICAL PILES AND FOUNDATION BRACKETS. ITEMS TO BE RECORDED AND CONFIRMED BY THE SPECIAL INSPECTOR MUST INCLUDE THE FOLLOWING: A. PRODUCT MANUFACTURER B. MANUFACTURER'S CERTIFICATION OF THE INSTALLERS C. PRODUCT TYPE AND CONFIGURATIONS FOR HELICAL PILE LEAD SHAFT SECTIONS, EXTENSIONS, BRACKETS, BOLTS, THREADED RODS, NUTS, WASHERS, AND TORQUES AS SPECIFIED IN THIS REPORT AND THE CONSTRUCTION DOCUMENTS D. INSTALLATION PROCEDURES FOR THE HELICAL PILE SHAFT, INSTALLATION EQUIPMENT USED, AND THE IDEAL FOUNDATION SYSTEMS INSTALLATION INSTRUCTIONS E. ANTICIPATED AND ACTUAL PILING DEPTH F. REQUIRED TARGET INSTALLATION TORQUE OF PILES AND MINIMUM DEPTH OF INSTALLATION G. INCLINATION AND POSITION OF PILES, TOP OF PILE EXTENSION IN FULL CONTACT WITH BRACKET, TIGHTNESS OF ALL BOLTS AND EVIDENCE THAT THE PILE FOUNDATION SYSTEMS ARE INSTALLED BY AN APPROVED IDEAL FOUNDATION SYSTEMS INSTALLER. 16. PILES IMPROPERLY INSTALLED BECAUSE OF MISLOCATION, MISALIGNMENT, OR FAILURE TO MEET OTHER SPECIFIED DESIGN/INSTALLATION CRITERIA ARE NOT ACCEPTABLE. ABANDON REJECTED PILES AND INSTALL ADDITIONAL PILES AS REQUIRED. HELICAL PILE PROOF TESTING THE CAPACITY OF THE INSTALLED PILES SHALL BE VERIFIED BY FIELD TESTING OF A MINIMUM THREE (3) PERCENT OF PILES UP TO FIVE (5) PILES MAXIMUM (ONE (1) MINIMUM) IN ACCORDANCE WITH THE PROCEDURE OUTLINED IN ASTM D1143 AND/OR THE 2021 INTERNATIONAL BUILDING CODE (IBC). THE MAXIMUM TEST LOAD SHALL BE TWO -HUNDRED (200) PERCENT OF THE SPECIFIED DESIGN LOAD. 5 of 22 GENERAL NOTES STRUCTURAL STEEL 1. REFERENCE STANDARDS: DESIGN, FABRICATION AND ERECTION ARE TO BE IN ACCORDANCE WITH THE LATEST EDITION OF THE AISC "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES". 2. MATERIALS: BOLTS - ASTM A307, UNLESS OTHERWISE NOTED ALL OTHER STEEL - ASTM A36 (Fy = 36,000 PSI) 3. ALL WELDING SHALL BE PERFORMED BY CERTIFIED WELDERS AND CONFORM TO AWS CODES D1.1 AND D1.3. WELDS NOT SPECIFIED ARE TO BE 1/4" CONTINUOUS FILLET MINIMUM. USE DRY E70 ELECTRODES. WHERE ON -SITE WELDING IS REQUIRED, SPECIAL INSPECTION IN ACCORDANCE WITH 2O18 AND 2021 IBC SECTION 1705.2 IS ALSO REQUIRED. CONCRETE 1. REFERENCE STANDARDS: ACI 301, ACI 318, IBC. 2. MINIMUM CONCRETE STRENGTH (28 DAYS): FOOTINGS AND STEM WALLS..................................................3,000 PSI - 5 SACK MIX BASEMENT FOUNDATION RETAINING WALLS .......................3,000 PSI - 5 SACK MIX SLAB-ON-GRADE........................................................................2,500 PSI - 5 SACK MIX SLAB -ON -GRADE... EXPOSED WEATHERING SURFACES ...... 3,000 PSI AIR -ENTRAINMENT 2.5% TO 5.5% FOR EXPOSED CONCRETE 3. MIXING: COMPLY WITH ACI 301. DO NOT EXCEED THE AMOUNT OF WATER SPECIFIED IN THE APPROVED MIX. PROPORTIONS OF AGGREGATE TO CEMENT SHALL BE SUCH AS TO PRODUCE A DENSE, WORKABLE MIX WHICH CAN BE PLACED WITHOUT SEGREGATION OR EXCESS FREE SURFACE WATER. 4. PLACING: COMPLY WITH ACI 301. PROVIDE A 3/4 INCH CHAMFER AT ALL EXPOSED CONCRETE EDGES, UNLESS INDICATED OTHERWISE ON ARCHITECTURAL DRAWINGS. 5. SLUMP: 4 INCHES PLUS OR MINUS 1 INCH. DO NOT ADD WATER TO MIX TO INCREASE SLUMP. GREATER SLUMP, ACCELERATED SET, OR HIGH EARLY STRENGTH MAY BE ACHIEVED BY USING APPROVED ADMIXTURES. 6. CURING: COMPLY WITH ACI 301. KEEP CONCRETE MOIST FOR SEVEN DAYS MINIMUM. 7. JOINTING: PROVIDE ADEQUATE JOINTING TO MINIMIZE EFFECTS OF VOLUME CHANGE. JOINTS SHOWN MAY BE ADJUSTED AT CONTRACTOR'S OPTION WITH PRIOR APPROVAL FROM ENGINEER. 8. WEATHER EXTREMES: COMPLY WITH ACI 305R FOR HOT WEATHER. COMPLY WITH ACI-306R FOR COLD WEATHER. 9. WATER/CEMENT RATIO SHALL NOT EXCEED 0.50 (BY WEIGHT), TYPICAL. 10. ALL SPECIFIED CONCRETE ANCHORS SHALL BE SIMPSON STRONG -TIE, HILTI, OR EQUIVALENT. SPECIAL INSPECTIONS REQUIRED. ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH MINIMUM EMBEDMENT, SPACING, EDGE DISTANCE, AND REQUIREMENTS PER MANUFACTURER. 6 of 22 PROJECT NO. SHEET NO. ,0 PROJECT 503 9th Ave N, Edmonds, WA LONGITUDE SUBJECT Foundation Stabilization/Jacki ONE TWENTY° ENGINEERING & DESIGN BY PAM DATE 05/15/24 Idea! Foundation Systems 2-7/8"0 Helical Pile (0.203-inch wall thickness) -Soil Capacity per ESR-3750 DIGGA 6K Drive Head Pressure Torque Correlation Factor, I(, Ultimate Axial Compressive Allowable Axial Compressive L120 ENGINEERING &DESIGN 7 of 22 LONGITUDE ONE TWENTY° ENGINEERING & DESIGN PROJECT NO. SHEET NO. .0 PROJECT 503 9th Ave N, Edmonds, WA SUBJECT Foundation Stabilization/Jacking BY PAM DATE 05/15/24 * Ideal Foundation Systems 2-7/8"0 Helical Pile (0.203-inch wall thickness) -Soil Capacity per ESR-3750 DIGGA 10K Drive Head Pressure (psi) Torque, T (ft*Ibs) Torque Correlation Factor, Kt [Compression] (ft-1J Ultimate Axial Compressive Capacity, P„ = Kc*T (kips) Allowable Axial Compressive Capacity, Pa = 0.5*P„ (kips) 500 1,740 9 15.7 7.8 600 2,088 9 18.8 9.4 700 2,436 9 21.9 11.0 800 2,784 9 25.1 12.5 900 3,132 9 28.2 14.1 1000 3,480 9 31.3 15.7 1100 3,828 9 34.5 17.2 1200 4,176 9 37.6 18.8 1300 4,524 9 40.7 20.4 1400 4,872 9 43.8 21.9 1500 5,220 9 47.0 23.5 1600 5,568 9 50.1 25.1 1700 5,916 9 53.2 26.6 1800 6,264 9 56.4 28.2 1900 6,612 9 59.5 29.8 L120 ENGINEERING &DESIGN 8 of 22 Friday, March 8, 2024 SCOPE OF WORK R&R CREW RESPONSIBILITIES & DETAILS: - Crew will install (20) Helical Piles and lift foundation to maximum allowable recovery. - Crew will remove and repour (4) concrete holes to allow pile installation. - Crew will drill 3/8" holes and inject Polyurethane Foam to lift and support slab. - Crew to remove soil down to bottom of footing and install (90') of 4" Tightline. - Crew will install (3) Downspout Tie ins and (1) Lawngrate. - Crew to drill (6) Weep Holes. HOMEOWNER RESPONSIBILITIES: - Have work area cleared where piles will be installed. - Have necessary plants removed. ADDITIONAL INFO: L;L.A,11s7,W@ - R&R will handle necessary permit and engineering coordination. - 25% deposit, 25% upon issue of permit and final 50% upon completion of project. - Permit cost is not included and will be billed on second 25% deposit payment. - Responsible party representative must be onsite during crew arrival, project completion and foundation lifting if applicable. - Permitting/scheduling times may vary beyond R&R control. - Crew should be aware not to use the north driveway under any circumstances. MATERIAL CLAUSE: - Depth Clause: Piles are bid to 25' maximum depth. $20 per foot charge beyond that. - Poly Foam Clause: Project is bid up to 300lbs of foam at current cost. $7 per lb charge beyond that. - Homeowner will be notified if any unexpected items arise and no additional work will be completed without homeowner approval. 9 of 22 Friday, March 8, 2024 ELEVATION MAP L120 is in concurrence with pile layout recommended by R&R provided that the proposed layout is followed as marked and that a maximum pile spacing of F-0"o.c. is achieved. Refer to attached SSK-01 for installation details. NOTES: 1. It is acceptable to install piles at the spacing shown with ± 0'-6" tolerance to allow for unexpected obstructions encountered during pile installation provided that no two adjacent spans exceed the spacing limitation of 6-0"o.c. 2. End piles are to be placed as close to corners as possible and shall not exceed a maximum corner distance of 3'-0" as marked. LOCATE PILE WITHIN 3' OF CORNER MAX CENTER PILE ON EXISTING SUPPORT 28, ADDITIONAL A 1 38 'a PILE TO REDUCE a SPACING U O s °D in N 1/2 J - 7 �5) PILES (q 5' OC MAX D 2 -3/4 7 -3I8 ADDITIONAL PILE TO REDUCE SPACING 3/4 -1/4 N 8.5' 1 ra 1 /2 -1/2 A 1-1/2 0 00 20' 23.7' 11r a' U O ... _. in Lawngrate (1) 7/8 in 5 J ¢ = 3" Helical Pile (20) D- ❑ = 4" Tight Line (90') 1 ❑ = Polyurethane Lift 6 O =Downspout Tie in (3) X Q 17 U O e @ —1� " aU in w J a 19 LO NOTE: L120's scope is limited to the perimeter support systems/continuous footings of the primary structure. All stabilization and replacement efforts of exterior decks and deck supporting elements are outside of 1-120's contract and scope and are not addressed in this package. - L120 10 of 22 Friday, March 8, 2024 JOB PHOTOS West side of home, Piles 2-4 will be installed here Crew will remove and repour (3) concrete holes. Piles 13-20 will be installed here on North side of home and North side of retaining wall. Crew will drill (6) Weep Holes. Crew to remove soil down to bottom of footing and install (90') of 4" Tightline. (2) Downspout tie ins to be installed here. South side of home, Pile 1 will be installed here. North side of home, Piles 5-8 will be installed here. Piles 9- 12 will be installed on West side of home. Crew to install (1) Downspout tie in here. Crew to remove soil down to bottom of footing and install (90') of 4" Tightline. Crew will install (1) Lawngrate. Photographs provided by R&R Foundation Specialists. Note that analysis assumptions such as building geometry, tributary areas, and loading were determined through examination of these photographs and industry knowledge of standard construction practices. - L120 11 of 22 PROJECT NO. NO. S240327-1XR SSK-01 PROJECT 503 9th Ave N, Edmonds, WA LONGITUDE SUBJECT Foundation Stabilization/Jacki ONE TWENTYO ENGINEERING & DESIGN BY PAM (E) WOOD FRAMED FLOOR SYSTEM, FIELD VERIFY ----------------- 8" MIN THICKNESS, CONTRACTOR TO VERIFY 0 a v d =Q� z�w o _ > V d z 0 d 0 N () ° N �111=IIII=IIII=IIII=IIII=IIII=IIII - - • "=IIII=IIII=IIII=IIII=IIII=III ° 'IIII=IIII=IIII �' d •. �' d IIII—IIII—III d d • =IIII=IIII • III=IIII=III ° ° IIII III=IIII=IIII=IIII= 11=IIII=IIII=IIII=1111— (E) CONTINUOUS — IIII=1il CONC FOOTING NOTES: 1. CONTRACTOR TO VERIFY NOTED MINIMUM EXISTING FOUNDATION DIMENSIONS PRIOR TO INSTALLATION. ENGINEER -OF -RECORD TO BE NOTIFIED PRIOR TO INSTALLATION IF MINIMUMS NOT MET. 2. ALL ASSEMBLY COMPONENTS SHALL BE FULLY SEALED BY A CORROSION RESISTANT SYSTEM. THIS INCLUDES ALL FINAL CUT ENDS AND DRILLED HOLES. CORROSION PREVENTION COATING SYSTEM BY OTHERS. PRIME AND PAINT PER MFR OR GALVANIZATION PER ASTM 153/A123. 3. AT CUT INSTALLATION POCKET ALL EXPOSED STEEL REINFORCEMENT SHALL BE SEALED OR COATED TO PREVENT CORROSION. DATE 05/15/24 (E) CONC STEM WALL T/STEM WALL = FIELD VERIFY T/FIN GRADE _ IIII=IIII=IIII=IIII VARIES 1=IIII=IIII=IIII=1 'llll`�1111=IIII=IIII' IIII=rill=rill= (E) FTG TO BE CUT FLUSH lilt=lilt=lill=rill- WITH FACE OF STEM WALL 1=IIII=IIII=IIII=11 lilt=rill=rill=i = WITH A 12" MAX WIDTH FOR _rill=_lilt=lil _lill INSTALLATION POCKET IIII—IIII—rill IIII— I—_IIII—_IIII— II —_III '',IIII=IIII=1 =IIII= 1=IIII=III _IIII=IIII- T/CONC FTG 11=lill-rill= FIELD VERIFY IIII=IIII=IIII II=IIII=IIII= IIII—IIII—IIII 11=IIII=IIII- IIII=IIII=1 = 11=IIII=III' IIII=IIII=IIII III=IIII IDEAL HELICAL PILE & REPAIR BRACKET ASSEMBLY PER R&R FOUNDATION SPECIALIST TO CONFORM TO ESR-3750 2-7/8" SHAFT W/ 10" DIAM DOUBLE HELIX W/ 3" PITCH L120 ENGINEERING & DESIGN 1 1/2 X 1 SLOT (TYP) 3 X 3/4 SLOT(TYP) 2 7/8" TRUFORCE BRKT BRACED BASE GALV. TOP 2 7/8" TRUFORCE BRKT BRACED BASE GALV. FRONT TRUFORCE UNDERPINNING BRACKET FOR 2 7/8" PILE SHAFT 7�6 1 1/2 X ] 2 7/8" TRUFORCE BRKT T-BRKT GALV. SLOT (TYI TOP 2 7/8" TRUFORCE BRKT T-BRKT GALV. FRONT NOTES: 1. PLATE STEEL TO MEET OR EXCEED REQUIREMENTS OF ASTM A572/A1018/A656, 50 KSI. 2. ALL WELDING TO BE PERFORMED BY SHOP QUALIFIED WELDOR TO AWS D1.1 STRUCTURAL WELDING CODE - STEEL. 3. GALVANIZING PER ASTM A153/ASTM A123. BARE STEEL IS ALSO AVAILABLE. 4. ULTIMATE STRUCTURAL CAPACITY IS 60 KIPS. 5. (2) 7/8"-9 X 3' GALVANIZED THREADED ROD - ASTM A193 (GRADE B7). 6. (4) 7/8" GALVANIZED HEX NUT - ASTM A194. 7. (6) 7/8" GALVANIZED FLAT WASHERS - ASTM F436. (2) WASHERS MUST BE USED ON THE TOP OF EACH THREADED ROD (ABOVE THE 'T' BRACKET) TO OBTAIN THE FULL BRACKET CAPACITY. B. HELICAL PILE ASSEMBLIES MANUFACTURED IN ACCORDANCE WITH ICC-ES AC358 ACCEPTANCE CRITERIA FOR HELICAL FOUNDATION SYSTEMS AND DEVICES. PICTURE PARKWAY STER, NY 14580 789-4810 1 WWW.IDL-GRP.COM NOT TO SCALE ALL UNITS IN INCHES U.N.O. 3 wrvrl VCIV � IH1 THE INFORMATION CONTAINED IN THIS � � � DRAWING IS THE SOLE PROPERTY OF 1 � IDEAL M NUFAC URIN IDEAL MANUFACTURING, INC. ANY REPRODUCTION IN PART OR AS A Group WHOLE WITHOUT WRITTEN PERMISSION OF IDEAL MANUFACTURING, INC. IS PROHIBITED. 27STFBPG SHEET 1 OF 1 N O M N N A 1 1 2 W ULTEMA CAPACITY IIS740.7EXCEEKIPS IMUM TORQUE NOT AS ON A CAPACITY TO 2 7/8" O.D. X 0.203'' W.T. HELICAL LEADS & EXTENSIONS TORQUE RATIO OF kt = 9 FT-1 ICC-ES AC358 -REPORT #ESR-3750 [L] EXTENSION FLIGHTED EXTENSION FLIGHTED EXTENSION (EX: 278203EXT[L]G) SINGLE HELIX (SH) DOUBLE HELIX (DH) (EX: 278203FESH[L][Di]X[T]G) (EX: 278203FEDH[L][D3D2]X[T]G) NOTES: 1. PILE SHAFT TO MEET OR EXCEED REQUIREMENTS OF ASTM A500, 80 KSI. 2. PLATE STEEL TO MEET OR EXCEED REQUIREMENTS OF ATSM A572, GRADE 50. 3. ALL HELICES ARE FORMED BY PRESS DIE. LEADING EDGE OF HELICES ARE TAPERED TO IMPROVE INSTALLATION CAPABILITIES. 4. HELIX SPACING IS THREE (3) TIMES THE DIAMETER OF THE LOWER HELIX. B SPACING OF LEADING HELIX ON FLIGHTED EXTENSIONS IS THREE (3) TIMES THE DIAMETER OF THE LAST HELIX ON THE PRECEDING SHAFT. 5. STANDARD HELIX DIAMETERS ARE 8", 10", 12", & 14". STANDARD HELIX THICKNESS IS 3/8". 6. ALL WELDING TO BE PERFORMED BY CERTIFIED WELDOR IN ACCORDANCE WITH AWS D1.1 STRUCTURAL WELDING CODE - STEEL. 7. HOT DIP GALVANIZING PER ASTM A153/ASTM A123. BARE STEEL IS ALSO AVAILABLE. 8. (2) 3/4" DIAMETER X 4 1/2" LONG GALVANIZED HEAVY HEX BOLT ASTM A325 AND (2) 3/4" GALVANIZED HEAVY HEX NUT ASTM A194 (GRADE 2H). 9. HELICAL PILE ASSEMBLIES MANUFACTURED IN ACCORDANCE WITH ICC-ES AC358 (IDEAL REPORT #ESR-3750) ACCEPTANCE CRITERIA FOR HELICAL FOUNDATION SYSTEMS AND DEVICES. Da p3 I �I �D3 �D= �{ �D� I I I p3 —Li LING NUTS 5% (TYP) ?� 1 SINGLE HELIX (SH) DOUBLE HELIX (DH) TRIPLE HELIX (TH) QUAD HELIX (QH) LEAD LEAD LEAD LEAD (EX: 278203SH[L][Di]X[T]G) (EX: 278203DH[L][DiD2]X[T]G) (EX: 278203TH[L][DTD2D3]X[T]G) (EX: 278203QH[L][D3D2D3D4]X[T]G) 2%O.D.X� 2 4 IDEAL PART # ABREVIATIONS: 0.203 W.T. 278 = SHAFT DIAMETER = _ 3 PITCH TYPICAL PILE 203 = SHAFT WALL THICKNESS ASSEMBLY EXT = EXTENSION (NP) FE = FLIGHTED EXTENSION O15l6 SH, DH, TH, QH = SINGLE, DOUBLE, TRIPLE, OR QUAD. HELIX [L] = SHAFT LENGTH IN FEET BOLT HOLE HELIX FORMED BY (EXAMPLE: 7' = 7) DETAIL PRESS DIE [D] = HELIX DIAMETER(S) IN INCHES (EXAMPLE: 10" = 10) X = X (SEPARATES HELIX DIAMETER(S) AND HELIX THICKNESS) [T] = HELIX THICKNESS (EXAMPLE: 3/8" = 38) G = GALVANIZED SINGLE HELIX EXTENSION TRIPLE HELIX LEAD TIP CUT AT 45° 4/3/2020 'D El A L rKurKIC I AKT AIVU U ivr1UCIV I1A1 THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF EKED 4/7/2020 1 IDEAL MANUFACTURING, INC. ANY REPRODUCTION IN PART OR AS A 1L MANUFACTURING, INC. PICTURE PARKWAY WHOLE WITHOUT WRITTEN STER, NY 14580 Group PERMISSION OF IDEAL 789-4810 1 W W W.IDL-GRP.COM MANUFACTURING, INC. IS PROHIBITED. NOT TO SCALE SIZE I DWG NO REV SHEET 1 OF 1 ALL UNITS IN INCHES U.N.O. B 278203 0 3 B W O M N N 14 of 22 LONGITUDE ONE TWENTYO ENGINEERING & DESIGN PROJECT NO. SHEET NO. ,0 PROJECT 503 9th Ave N, Edmonds, WA SUBJECT Foundation Stabilization/Jacki Vo LOAD ANALYSIS: IBC 2021 - 2-Story Building 5' SPAN MAX TRIB Condition Roof LL (snow ground): 25 psf Floor LL: 40psf Floor/Roof DL: 15psf Wall DL: 40psf Roof Trib = 0.5*26' max span = 13' Floor Trib = 0.5*24' max span = 12' Typical Flr Ht = 10' x 2 stories = 20' wpL = 15psf*(13'+12'+12')+40psf*20' = 1.35 klf wLL= 25psf*13'+40psf*(12'+12') = 1.29 klf WSTEM = 0.25klf wTL.A„ew. = D+L+Stem = 1.35kif + 1.29kif + 0.25kif = 2.9kif ■2T DATE 05/15/24 ---------------------- I ----------------------- L/2 L L/2 - IL 5' Span PoE = 1.35klf * 5' = 6.75 k 5' Span PEE = 1.29klf * 5' = 6.45 k 21-2" 5' Span PITEM = 0.25klf * 5' = 1.25 k ( 1$"+ $") 5' Span PTL.A„ow. = 6.75k + 6.45k + 1.25k = 14.5 k Case 1: Point Load 5'-0" Span: (Conc Only) Pt Load = 15k Refer to attached calculations for analysis. Case 2: Uniform Load 5'-0" Span: (Conc Only) Uniform Load DL = 1600 plf LL = 960 plf LL, (snow) = 330 plf Refer to attached calculations for analysis. Pile and connection requirements per Pile and connection requirements per contractor contractor 5'-0" max NOTES: 1. Both uniform and point loads analyzed in the following calculations. Uniform loads are assumed to be standard due to load distribution from bearing walls, however, the additional point load is conservatively considered here for any major beam supports from above. 2. Maximum loading on the grade beam was determined by inspection of the building geometry and through conservative assumptions regarding span lengths and support wall/foundation. All concrete walls assumed full tributary span of floor and roof members. Conclusion: Based on the loading and geometry of the structure we conclude that the foundation may be stabilized through the use of piles and connections per R&R. These are to be attached to the stem -wall (grade -beam) at an on -center (o.c.) spacing no greater than 5-0". L120 ENGINEERING & DESIGN 15 of 22 Project Number: Plan Name: Shee[ Number: S240327-lXR 503 9th Ave N Engineer: Subject: Date: PAM 26" Unreinforced Conc Beam 5/15/2024 DEMAND CALCULATION number ofstories # 2stories span L 5.0 ft [max on -center pile spacing] concrete area A 216 in2 *see attached concrete self weight Sw 225 plf [Includes total height w/o ACI14 §14.5.1.7 redux] w DL DL 1350 plf [2-story loading] w LL LL 960 plf [2-story loading] w LLr LLr 330 plf [2-story loading] **Assuming a single span between 2 piles - in reality continuous spans between piles will have reduced moments** momentfrom DL MDL 4,922 lb-ft 59.1 k-in momentfrom LL MLL 3,000 lb-ft 36.0 k-in Mmax = ewlx momentfrom SL MLI 1,031 lb-ft 12.4 k-in shearfrom DL VDL 3,938 lb 3.94k shearfrom LL VLL 2,400 lb 2.40 k vmax = ZwL shearfrom SL VL1 825 lb 0.83 k factored moment MLRFD 82.7 k-in 1.4DL MLRFD 134.7 k-in 1.2DL + 1.6LL + 0.5SL MLRFD 126.7 k-in 1.2DL + 1.6SL + LL controllingfoctored moment MR 134.7 k-in factoredshear VLRFD 5.5 k 1.4DL VLRFD 9.0k 1.2DL + 1.6LL + 0.5SL VLRFD 8.4k 1.2DL + 1.6SL + LL controlling factored shear V. 9.0 k controlling factored bearing BR 9.0 k Bmax = vmax STRENGTH CALCULATION concrete strength f'c 2.5 ksi assumed light wt concrete mod. factor A 1 normal weight concrete flexure strength red. factor IN . 0.6 ACI 318-14 [Table 21.2.1] shear strength red. factor Ch... 0.6 ACI 318-14 [Table 21.2.1] bearing strength red. factor �hear;Rg 0.6 ACI 318-14 [Table 21.2.1] *Note that per AC1318-14 Ch. 27.3.2 a phi factor of D.8 can be used if dimensions and material properties are confirmed. moment of ineritio Ip 11,016 in4 *see attached elastic section modulus Sm 1,001 in3 *see attached tensfiber to NA c 13.0 in *see attached nom flexure strength (Tcontrols) Mn 250.3 k-in M. = 52.V-f7cSm CONTROLS ACI 318-14 [Eq. 14.5.2.1a] nomflexure strength(C controls) Mn 2,127.1 k-in M,=0.85fS ACI 318-14[Eq. 14.5.2.1b] RESIDENTIAL CONCRETE Mn 375.4 k-in Mn = 7.55z1VfcSm X ACI 332-14 [Eq. 8.2.1.1] - not utilized flexure strength „ 150.2 k-in > Mu OK D/C= 89.69% nom shear strength V„ 14.4 k V.= 32� * A ACI14 [Table 14.5.5.1(a)] shearstrength 1 4,V„ 8.6k <Vu FAILED D/C= 103.91% WITHIN 5% ACCEPTABLE [IDEAL 2-7/8" Tru-Force Underpinning Bracket] [If the supporting surface is> than loaded area] ACI14 [Table 14.5.6.1(c)] loaded bearing area Ar 74 in2 supporting surface bearing area Az 74 in2 nom bearing strength B" 156.6 k 0.85fA L bearing strength dIBD 94.0 k > Bu OK Additional Verification Calc: max concrete tensile strength fr 375 psi f=7.S,jVI c max beam tensile stress FL 159 psi Ft = (M * c)/fxx f, > Ft OK D/C= 9.55% ACI 318-14 [Eq. 19.2.3.1] 16 of 22 Project Number: Plan Name: Shee[ Number: S240327-1XR 503 9th Ave N Engineer. Subject: Date: PAM 26" Unreinforced Conc Beam 5/15/2024 Final Section Proverties Total Area 216.0 inA2 Ixx 11.016.0 inA4 Sxx : - Y 1,001.45 inA3 lyy 1,631.93 inA4 Sxx : +Y 847.38 inA3 Calculated final C.G. distance from Datum : X cg Dist. 0.0 in Zxx 1.349.99 inA3 Syy : - X 271.988 inA3 SYY : +X 271.988 inA3 Y cg Dist. 0.0 in Zyy 504.0 inA3 Edge Distances from CG.: r xx 7.141 in +X 6.0 in +Y 13.0 in r ri 2.749 in -X -6.0 in -Y in Rotation of All Components Ca. 0.00 deg CCW `v N i0 11 N Zv XCG 1 L L _ 1 CV I 1 cc - - _ _ Per AC114 §14.5.1.7 - 1 : pl Xcg = 0.000 in Ycg = 0.000 in Rotation = 0 deg CCW Top Flange Width : 8.000in Top Flange Thick = 8.000in Web Thickness = 8.000in Bottom Flange Wid 12.000in Bottom Flange Thi, 6.000in Top Height - 24.000in 17 of 22 Appendix Parcel Details & Photographs 18 of 22 SnohomishOnline Government Information & Services County4* Washington Property Account Summary 5/15/2024 Parcel Number 27032400220700 jProperty Address 1503 9TH AVE N, EDMONDS, WA 98020-3038 General Information Property Description SEC 24 TWP 27 RGE 03 E 190 FT OF S 110 FT OF S1/2 SE1/4 SE1/4 NW 1/4 LESS BEG NE COR THOF TH S 110FT TH W 15.3FT TH NLY TAP 13.2FTW OF POB TH E TO POB PER SC #104695 TO CITY OF EDMONDS AKA PAR A OFCITY OF EDM BLA REC AFN 200410195002 Property Category Status Tax Code Area Property Characteristics Land and Improvements Active, Locally Assessed 100210 Use Code I I I Single Family Residence - Detached Unit of Measure Acre(s) Size (gross) 0.48 Parties Role Percent Name Address Taxpayer 100 OLSON GREGORY V & VIVIAN A 503 9TH AVE N, EDMONDS, WA 98020-3038 United States Owner 100 OLSON GREGORY V & VIVIAN A 503 9TH AVE N, EDMONDS, WA 98020-3038 United States Related Properties No Related Properties Found Property Values Value Type Tax Year 2024 Tax Year 2023 Tax Year Tax Year Tax Year 2022 2021 2020 Taxable Value Regular $1,979,700 $1,921,500 $1,627,900 $1,455,300 $1,3415200 Exemption Amount Regular Market Total $1,9795700 $1,921,500 $1,627,900 $15455,300 $1,3415200 Assessed Value $1,979,700 $1,921,500 $1,627,900 $1,455,300 $1,341,200 Market Land $1,3775000 $1,239,300 $1,053,000 $915,200 $8345200 Market Improvement $602,700 $682,200 $574,900 $540,100 $507,000 Personal Property Active Exemptions No Exemptions Found 19 of 22 20 of 22 Tax Year Total Levy Rate 2023 2022 2021 6.866028 8.351400 8.265232 Real Property Structures Receipts Description Type Year Built More Information I1 Story wBasement Dwelling 1939 View Detailed Structure Information Date Receipt No. Amount Applied Amount Due 04/24/2024 00:00:00 13228484 $7,047.70 $14,095.41 10/23/2023 00:00:00 12935966 $6,601.57 $6,601.57 04/18/2023 00:00:00 12662249 $6,601.56 $13,203.13 10/21/2022 00:00:00 12383941 $6,801.64 $6,801.64 04/21/2022 00:00:00 12116716 $6,801.64 $13,603.28 10/26/202100:00:00 11836872 $6,018.22 $6,018.22 04/27/202100:00:00 11566112 $6,018.21 $12,036.43 10/26/2020 00:00:00 11287402 $6,266.06 $6,266.06 04/17/2020 00:00:00 10985749 $6,266.06 $12,532.12 10/24/2019 00:00:00 10713663 $5,712.58 $5,712.58 04/18/2019 00:00:00 10416648 $5,712.57 $11,425.15 Sale Date Entry Recording Sale Excise Deed Transfer Grantor(Seller) Grantee(Buyer) Other Date Number Amount Number Type Type Parcels WOLGAMOTT OLSON 07/28/2005 08/01/2005 $765,000.00 298110 W S FREDERICK A GREGORY V & No & JUDITH S VIVIAN A Neighborhood Code Township Range Section Quarter Parcel Map 1605001 27 03 24 NW View parcel maps for this Township/Range/Section 21 of 22 � a t=4 O/ Existing building plan provided by Snohomish County records for Parcel #:27032400220700 for address: 503 9th Ave N, Edmonds, WA 98020 Note that analysis assumptions such as building geometry, tributary areas, and loading were determined through examination of these photographs and industry knowledge of standard construction practices. -L 120