3-27-23 Epxy SI reportPage 1 of 2 QK=an&Associates, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection DATE: 3/9/2023 Field Report NO.: 09623116392023MP Set Count: CONTRACTOR: PROJECT #: 09623116 PERMIT #: PROJECT: Gary Residence INSPECTOR: Madhab Paudel LOCATION: 855 Dayton St. JURISDICTION: City of Edmonds KA P.M.: Jeff Mercer WEATHER: Partly Cloudy TEMP: 39' F A Krazan and Associates, Inc. representative was on site today to inspect the adhesive anchor installation -epoxy. Upon arriving on site met with contractor. Location & design noted. Contractor drilled the total eight (8) holes horizontally on existing building wall & slab @ north side of building and installed #4 dowels with minimum embedment 4" with epoxy. All holes were cleaned with the appropriate wire brush and air compressor. Epoxy used was SIMPSON Strong -Tie SETAP with an expiration date of 05/02/2024. An adequate amount of epoxy was used to completely encapsulate the embedded portion of the anchor. All anchors were installed in accordance with the Manufacturers Printed Installation Instructions. 9�ctr e=o" r-------- ! — — — i .-------- —r-------.......—� I r---------'----- -- y---------, I I ! �. —' f I 7 I I ytp k 14' CONCRM I I H I SLAB-Ot -GRADE W/ H I L STEP I 1 WWF 64-W606 f fi l I—DOWELL. A x 24' LONG(4' EMBED) W/ SIYP$QH"SET-RP' ADHESIVEANCHOR— --_t ( 12 Y o Contractor did epoxy on mark area on plan drawing Offices Serving the Western United States M J4 WKL a 24' OND (4 QW) W/ W 'SET-W am ram' Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kmm & Associates. T1us report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject toreview prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. The test results apply only to the specific locations, and items inspected or tested Page 2 of 2 QKmwi&Associates, Inc. Field Geotechnical Engineering . Environmental Engineering Report NO.; 09623116392023MP Construction Testing and Inspection N b` Reviewed By: VV ASTM Test M Asset Number(s): To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Su erintendent/Re resentative: Technician: Madhab Paudel Offices Serving the Western United States Lynnwood (425) 485-5519 - Poulsbo (360) 598-21126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the eacIsolve me of the client This report may not be reproduced in any format without the written permission of the client and Kravan & Associates. This report indicates our inspectors observation and testing results based on site conditioner and contractor activities. This infonation is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information hu bow Dt"Ided by others on site. The test results apply only to the specific locations, and items inspected or tested.