Loading...
RESUB 3-Storm Drainage SystemSTANDARD. DRAINAGE DETENTION SYST WORKSHEET OWNER -��i ! /1fY c. "? rn �!� 11 CALC BY: Pno ADDRESS I a E,_ r r S.W, PHONE:1,1,t <-, j �.' ; S DATE: *****DESIGN DATA***** IMPERVIOUS AREA PIPE DIA PIPE LG DETENTION PIPE LENGTH WASHED zOUTFL TOP RIM ELEV +�'^ 1'MIN COVER O'MIN SAKE ' 2'MA%COVER RIM ELEV3fi9_s CONTROL Y L OUTLET •.ram � �s✓ - 4'0 MIN 4'PEI .5%-r'. SLOPE 9' 0 RPE MIN. f f ORIFICE, RUNOFF SPREAI INV ELE F0. 3� 7 OUTLET 6PmR CATCN INV ELEV_ BASIN CONrBOL CATCH BASIN SYSTEM CROSS SECTION FROM CONTROL OUTLET RIPRAP OUTL -try C FOOTING DRAINS SHALL NOT BE CONNECTED TD DETENTI1 NOTES. 1. Call Engineering Division (771-0220) for a tightline and detention system inspection before backfilling and for final inspections. 2, Responsibility for operation and maintenance of drainage systems on private property is the responsibility of the property owner. Material accumulated in the storage pipe must be flushed out and removed from the catch basins to allow proper operation. The outlet control orifice must be kept open at all limes. rrTT i/Q7 Tl- A nF r