Loading...
REVIEWED BLD RESUB 2-Structural Calculations1601h Street Residence Remodel Structural Calculations (Rev 1) 6907 160t" Street S.W. Edmonds, WA 98026 Snohomish County Sidesway Project No. 21019.03 Prepared By: SIDESWAY ENGINEERINGI 1601h Street Residence Remodel - Rev 1 August 9, 2021 Project No. 21019.03 TABLE OF CONTENTS DESCRIPTION PAGE NO. Project Summary Gravity System Framing & Load Tracing 1.01 - 1.03 Design Loads 1.04 Roof & Floor Framing Design 1.05 - 1.12 Foundation Design 1.13 Lateral System Wind & Seismic Loads 2.01 - 2.03 Lateral Load Distribution 2.04 - 2.06 Force Transfer Shear Wall Design 2.07 - 2.11 20305 87th Avenue W. Edmonds, WA 98026 S, 5WAY (425) 673-4160 ENGINEERING 1601h Street Residence Remodel - Rev 1 August 9, 2021 Project No. 21019.03 Project Description Sidesway Engineering was retained by 4UP-Wash LLC to perform analysis and design as necessary to obtain a building permit for the proposed exterior and interior remodel to the existing single family residence located at 6907 160th Street S.W. in Edmonds. The remodel moves an upper floor exterior wall and removes interior walls throughout the structure. Several new decks are being added to the structure. The structural design also accommodates a future remodel which will require a separate calculation and drawing package. The remodel and decks will be conventionally wood framed with existing and new joists spanning to stud bearing walls or beams. The structure bears atop an existing daylight basement with continuous exterior and interior footings. New spread footings are being added where required to accommodate the remodel. The lateral force resisting system consists of sheathed roof and floor diaphragms spanning to various wood stud shear walls around the perimeter and interior. The lateral system of the house is only changing along the west elevation and is being designed for this and the future remodel. All existing house framing and dimensions were provided to us on the architectural drawings or were obtained from the original 1994 construction drawings. Sidesway did not perform an as -built to verify the accuracy of the provided information. Scope of Work Provide gravity and lateral calculations for the proposed remodel as required to obtain a building permit. Provide structural plans, notes, and details as required for permit. Design Criteria 2018 International Building Code (IBC) 2018 International Existing Building Code (IEBC) ASCE 7-16 Minimum Design Loads for Buildings and Other Structures Applicable Material Reference Standards (ACI, AISC, NDS) This is a Risk Category II structure designed for the following loads: Dead Loads: 15psf (roof), 15psf (floor), 9psf (walls) Snow Load: 25 psf Live Load: 40psf (floor), 60psf (deck) Wind Load: 100mph, Exposure'B', KZT = 1.0 (refer to wind loads) Seismic Load: R = 6.5 (wood s.w.), Site Class D, SDC D (refer to seismic loads) Project Summary The proposed remodel to the single family residence as designed in the following calculations conforms to the 2018 IBC and IEBC. Refer to the calculations and the construction drawings for structural framing requirements. Disclaimer This calculation package is based on the documentation that was available to us. Sidesway Engineering did not perform an as -built to verify the accuracy of the provided data and we should be contacted if there are any discrepancies with the assumptions contained within these calculations. We assume the structure has no known deterioration or damage that would adversely affect capacity. 20305 871h Avenue W. Edmonds, WA 98026 SIDE5WAY (425)673-4160 EhGINEERI4G p� N J L ,-(3 5 pL /*Lf � golsi� �.�p .. 157 PL. f-s,1, BS ` pt t ct -4 S( 1 t r� l3 "z 1 ® 6 x-s-s-r o Co AV y F(?� `` - Ark 5�c u SUN S hsO e- p C -r AyL ?,p9 �6,c �� 1 tr- 55oc�) --� c��L 74 119915E EXIST SLAB -ON -GRADE 4o 4bf Ed O /,�ClvF (Y Sf Li-vG ; '10 5?S 6a -5 t= i-�oW-.): 2-si>5F RC-Ssd� �NT�.FL LATr--P-- z+ 6A(- L 7-5cK= too P=)4t92f 72-�15P5r �f �SPsrcOauy�y`l.e�(�` o� �ok�sr= L11--,j'-lU5R-z-(15-6(o)4�Ii�IT2'�l5 425�=`�6.6 (`aR z(_:7-e5r z M r � 12����� • �(5-Fta�-F SZ6F-r •rS�SF ,mac-e<- -39. IS 31. IBPSr— -�• k• P>3, =7 Q= z2 P5 F f3 5.?S f 4: z C= 11-1.6p5F o=-3z?5e N �6 r 0q—�OJ h za = r Ia S: A"r10,9 ?F65 L p=r36 G 'OIZGE�: LOOF=Z,2 �iPY�b•F tAr = S?IV ze-- (,oc1G2aS FPWF= 2t'(03� hF Z113 r-Ur- = S � )Nv(q" FrAr= 15Y6 Description s S 57 l_ B! �j Pro,00 No. O L�.Gj�J Date�c+l" Zr Z/O�l. Za I D E WAY Project Caked i Caked Sheet No. ENGINEERING Date I.�� V L -hlT �•�� c✓ I3'j>1-fPL f ziz�Lfs� eFSu47APJ �•���iZ=Gc � �S4I+G -fZl3J SL 7-1L !G(Z6�Sc 67 V-xP ; C4?!�Y9c+ rY26 SL it Z (�-f5 IS 471fop-T Goz 4r3Sr-fL VA�s LF(_ r Kz = u:� Hy: ,'. sr E: r-r1 rot_ iCr,J f z ( bJ, . �•N , r r . zt j WZrA •CIS ( 5� SN_g7iFp f I41.4zLfS w B �Z sty1 ?' / _ `Z $G+' r✓L f 2 OI I 5 L. t N 7, �. S CISfZs, S � F rulE N>c6 D+ Date � ,;. '� ,.��-7 IDE WAY prowt C>T �Owked ENO. ENGINEERING Dare )05 e .56S ~-Z ZAy, ((S—E z5) ,x- y gLf-2 I� gzaPL ss�j 136�s� AztS� OescnPGo^ BY — • Prolea No. Dare 71 a 5IDE5W�Y P��tl«�Cod �m. ENINEERING ) G/ &-- I.OZ f-opS6--Awl �40—k 1c— �,, = I ' � f S 4`60% r Ya�"o�f IY(,s�cc r-Z. P. H2c��Dr�-fr-r6s¢1-c 3q�u [cGo � .CJ ��2.�5 (I�SFpL f�FJPS� z.s T'Z=;?r->qTf t 1t�35L II �Nt(ti llll�J�J 3053 SL � �K�pL t. r ItSC /LT�T Z_3o�/Z0i 0-6 t Q• lgz7 Si� "-or "Y-L+,c.,j — Date I DE WAY P,oect o r hr Checked Sheet No. ENGINEERING Dare I VT LIJ IZ =G -z c` Z 2 1,L L�- = � • 9 -� I D. 6 - (rS f Y�� Fb�-0,5/) F7to `ow J,,F fs, W=2 S Crs�s-xfr�J 17Z n W, Uf?it C-��F �� -� w,- "r pyZ_ �t/j �aj--7flSC a 2� t1 '-3/ `Fq.tL �Q1°'� II -"flL 4 rJ -7 "t C- (/6-S i 3g1((;1 G5 AD(> l2'SG�lr6 4b/r 6 o. f Pit q �� I � cc W, = `7 Gl�ec++� zF wG6 ST_rr t�F4�� sufvdc; `�3 S. 4(r Pc--fL RzSc 1 f0 (Atol5El; PG 9-(-1 k56 r-o2 '-4 /jLi1 U. ( W-f25 Ln.IErS 6�L i ,C-Lp= P114L= ZD.S 4e).6Z'fO��ppL��.�//JJkzPS (l)E5 to .4L G¢_PPLy7J(T �Z�•S'fOG2.1'�zPS rm J No QEQd �SrL R"^SZf� � KSNlO) � e6f5� itSC- 3zx9z� .SSE �i-L �-`/�fj=c�•`15 Roll-) ��fi L �f3/DG q 76 SL 63SSL �f-cSG�zk�z� I.�Sr GSL 399 x 56 ZSc .4 I DE WAY Pmject < checked �. ENGINEERING Dare I'va VJ I', S[ ram `J — r 47-Z 6sl Z 0O 4: ('s --e zs) s'65 4Leo�f�7�5 �> 4,b �635Dcf1�65��e� )U6Po —0.kr2 ��513 P-0!` P ; 236 p L t3g3 Sz r-tom i� 1 6'=� x wi'3�7 5 CI Stzs� J E✓c- /' �jI . `C : 9 r F I • (rs tzs� rz. 8•riSfYo� 'SILOpL " Oz5DL Sx13r,c � ZLL gaSSr- � Z(� 5L k�s 3 qi ` L Ld5 IZ.S ��iSf25� C a /2-J ZioY USF 3iKg DPG-Lj yP.KC O 1 L4460 <d Ld� IK'C15 FzS> ---- S -7-ar- L,k Si K 16z DP(rL$ Oaf Z 1 1v�%�iz I D E WAY Proms I °ad S"°. ENGINEERING ol L`^L Wzf �IO�S DL IzgSotyv gk�LL 9q6 cc �%;✓,I CA iN Q r GF- LC U (a�,-�2 �JA G uL gfS: w cJi:2. 57, L t,.)Z- it 5 F2 S) DPP(—c>. RPer� �(' zSGS � 3B95L LtSc uxg p�z F =o.3z 4 U SUIPVM l/t C T .. oet 2.�'9�z z< IDE WAY P��t l �, Checked s tNo. ___]ENGINEERING Date Q rJl PZ �,.GC- z �L cf t3. •Ci�-�zS> -}-i �•(ISf�fa� w ; v Iti�,6— 6 � x-(z �So-sg-rs �SG-F-rr or 133 �j St-�Ft�ot2z SAtlA 6— -�) ,` No Foc+ cr FC70— +Bv 3 ` w Zf a P38co p i { �ZSo « f Z-: ,p' sc � �"(S OLfi LgjS SL �DySS a9z 3i,c for/ 1, SSA L-';Z Descnptian ,� I ,(y� V� C� A �T a By1�� Project No. /�1!'YY Y " Date ?, a (Q fG? OZ IDE WAY Project 60 y, checked sheet No. ENGINEERING Date I 1 / tkAj j�c00tz-Fi'--A i— x, j T <A- = 7007 DL { �/'Y6 LL= 555� -10, °r4 </361. 14( K= �h2Z L.-SxwvF -I�fb 44 C.eC- a�t LA rK xia rrFL �. 04 4 r �rGy tt l� i 1' T fir /2 LJ Lj *F42 Z,q"« �n�� ---....._.. �s y Date Z-/ rdc9'oy I DE WAY °�t T Dad �iC Sheet No. �' 1 r z ENGINEERING Dare 'AQ 7=0 15 L.vC `,' Fj ' if F "% '?ice " �Dkuv� 20oo `�5�. z�6� Pt Fr �V.,.kX' SzePL- L Fc 93��`r CZ56�PLF • � � • SwPF 'rc F 05 4-2 ' -2 ! to ra ZOA U :�,1� T zr �rz G' I (� HL-C k Ey ZS-r 5— Rat' F�-(iyQ9 e MAt� FGocA-Z- l3`; �= 3000 -PL z76d`SL +gH�n�tg56SL 1107,1 G�xls-r 3.5= i31 7S. LG/D� j[47E ASP�C-Aw�f LEa47rT4LG-a� �lozz" : 1i.13 6 « I,Z • 4 �-4 � D`-r �.4i • N75o µ f O. SS�3G iL tsc-= 1510't � 1,,� � I r s (D •es•.��.�):r�.y:,�6oEo ss2.s-i6� EYvS 7 F-r6- ,#s,G-�Pwt fF Hy uj=m.5 ---- fylz r I D E WAY Pm� TK �E °,wed �°"�. ENGINEERING oam 1'l3 SCE ASCE 7 Hazards Report Address: Standard: ASCE'SEI 7-16 Elevation: 39549nINAVD881 6907 1" st Sw Risk Category: It Latitude: 47.854203 Ldmonds. Washington Soil Class: D - Default(see Longitude: -122.326404 98026 sw on 11 4 3) D - Default (see Section 11.4.3) S, 1.33 S:: - N/A S. 0.473 T, 6 F. 1.2 PGA: 0 572 F , WA PGA ,,, 0.686 S, 1 596 F .. 1 2 S" N/A I 1 Srs 1.064 C, 1.366 Ground motion hazard analysts may be required See ASCEJSEI 7-16 Section 11.4.8. Data Accessed: Fri Apr 02 2021 rt.4. QL .nrs• USGS Seismic Des:an Maas ND"r C " 1 QN��(r1M L(%i �i4cL L vFLS Aar" (fit' G �rJG IJoT A Seismic Soil Data " JMD - - ------ ---- care 05/17/21 21019.02 I DE WAY -160TH Rev shatm, 5Deu (7 ENGINEERING MSFRS Seismic Loads Parameters: Latitude/Longitude = 47.854203, 122.326404 Risk Category = II (ASCE 7-16, Table 1.5-1) Importance Factor, Ia = 1.00 (ASCE 7-16, Table 1.5-2) Soils Site Class = D (Per geotech, else per 11.4.3) SDS = 1.064 (USGS) S, = 0.473 F = 1.87 Sol = 0.5897 Seismic Design Category = D (ASCE 7-16, Table 11.6-1, -2) Building Properties: Response Modification Coefficient, R = 6.5 (ASCE 7-16, Table 12.2-1) Overstrength Factor, no = 3.0 (ASCE 7-16, Table 12.2-1) Deflection Amplification Factor, Cd = 4.0 (ASCE 7-16, Table 12.2-1) Fundamental Period, T, = Cthnx Ct = 0.02 (ASCE 7-16, = 0.216 x= 0.75 Table 12.8-2) k = 1 (ASCE 7-16, Section 12.8.3) 1.5*T, = 0.831306 (If 1.5Ts > Ta, see 11.4.8) Seismic Response Coefficient, C,: V = 0.044SDsI (Minimum) = 0.047 W V = (SDSIW)/R = 0.164 W GOVERNS V = (SDII)/RTa (Maximum) = 0.420 W Vertical Distribution of Seismic Forces: Diaphragm DL Area wDL Story wjhjK wxhx Force Fx Sum Level (psf) (ft`) (kips) Ht. (ft) (k-ft) Iwih;" (kips) Fx Roof Framing 20 1492 29.8 23.9 713 0.365 5.28 5.28 3rd Framing 21.7 2611 56.7 16.2 918 0.470 6.80 12.09 2nd Framing 31.2 1277 39.8 8.1 323 0.165 2.39 14.48 1 = 126.34 1954 1.00 14.48 Base Shear (ULT) = 20.68 kips Base Shear (ASD) = 14.48 kips Im Design Forces: Diaphragm w; I w; F; I F; I F; . wp, FPx (Min) FPx (Max) FPx Level (kips) (kips) (kips) (kips) i w, 0.2S.,Iwp, OASo,Iw, Govern Roof Framing 29.8 29.84 5.28 5.28 5.28 4.44 8.89 5.28 3rd Framing 56.7 86.50 6.80 12.09 7.92 8.44 16.88 8.44 2nd Framing 39.8 126.34 2.39 14.48 4.57 5.93 11.87 5.93 MFSRS Seismic Loads JMD -- - Dare 7/27/2021 21019. 0 ."'.- I DE WAY P 160th Rev 2 _ _ _ chimed SWW Na ENGINEERING Dare ?.O - OAT FT% Elevation 10 L , �,111- Elevation 5e—c' KZT ]MD 04102/21 21019.01 1E WAY -Residence D Ch�ed Sh"r No, 55f6o-0f ENGINEERING 5z 8o if Z6t�3o win ko Lz,� 52so, Z tr- z L li�oor- — La-r ixr*-r \\77= 1 - � if St 3 1 2"x 9 1 ?_ RALLAIGI iIF ---- \ rold X p,/ a - --- --- -- - - -- i p� I f i d � r � h L �P �r G L!� �3o6F�2 0`( L 12 760 Z� 0 3� AIW II II II I II II II I �, li II II II II II II I II II it II II it II f wlap L-- fi,\) G V- �31 EXIST 5 1/4" x 11 71'8" a 2 I_ � j( It =-06 23IQl,F si��vz7 cLs z31_ Pam; : 3�2��F- 5�J3 --- >r,5 / �� i0� ouER-zuRNs�-�(r/ y�� FARCE rR�'NSFE� c'z�-r�u-r org-7 7 �rs57 F� e�� � r-Aa�s o� U� r. �3orsr �s r so 3912 EQ ", r 1.2 0. r- 7- asv aP� , 1 s33¢� Ex,S�Cz) qi rsT (FD6C:2 A-.E �/d �t°0.�8 444r 'ELT r 1,4 � �, vJ � ZGb Qom( PL -F�/ 001�LF L - ro5� r-r=2 2.5. �r66 - 183�f Lc ' IZ25' f 36`�S G� £ f�4GEni (: NAZ�G-o PO" 'J/GiiRGE ➢�w� T�pG� r aa) 4-A 7 z-- IZzs" C--� cJ iECs_ �%2�12r ZtDr4.pZ IDE WAY Project c Cneaed Sheet No. ENGINEERING Date 2,07-- L9V u9-. rI-)Cr: -9 rJFT� 18r��i--��s��.l _G7.v6.(Is•s.�-.r-�•s-�- � = I3,�3 U S's r-4DC�-2— c1�3 2 L 3 w�,IL- 4 S r3k, O tj_ -r, 4• 0!�LC /p, hJ a K o i�Eo (j Ly, ►c—� 1/= I doh r�-� P �✓ — Z �,? z/ 6 s Pe- r F_ ( (r(ou s 6 ) I v o -�,AiJ � C. T 64 SCO u, b 0- (c-9- ? c- ac nI sWil �l ® �o ��r� ��OG1 �SHorTPjE2_Ibv .Z.rO `{ZZ" So�����-��cE:. rJo HD 2 SSG FDtz Z 4z bwS`P=�YLF.2.y•g.l _�K6,(iS �b19L•) 1.2 r3112 rr�kz Ole -_'Ez --a1 �9J I DE WAY Project Check&d sheetft. ENGINEERING Date -Z.08 Fla R- 5kc--cFQi cx-,6-Ce 5 �$Su, " L-xss-7 w66L Td c-c-S j2oo�tF-Z• 0_4� = 552 56'DPe-r S c..� .DC a)uy-rc G- �JC-T�3r---7ps,F.8.r.� ii.LZ' goSS� (�� ��s cD S cttlG (z� 1FDAS� Cap_,) 3 ./6: 87 PFA VP GQP 22rc�K 2 = kkio t✓ i 33 f<;r 5'� Yr�i S Gl Sj FQ rvITE (2% 0.9 1 GcQ6 iN�, Nd SKf t��— GFCLG(w� . C �T�v� C� hN FLcx�CcL413c/ 5� (�SSu F� Za GAF nor rGc�vdz RGr>>; Tl �ds�® Inc �c zo N i LA5,--. �7t�Z jfSGL �FOC C��ikTG Z36O3-f- .'r6 •��S )H.r�r � O.S• OP DP" 0 .... 0�/2 zr Zlv lgoZ IDE WAY P,o, T°,�ed S, tml " ENGINEERING Date Z- Project Information [ode: 2018 RIC Date: 7/27/2021 Designer. )MD V(* LIMI lafrhl Ulfil 727 l Z L,,,enry L Hold-down farces: H = Vh„a/L„n 907 Ibf 2. Unit shear eaters +below opening First opening:val=vbl=H/(hal+hbl)= 363 Of 3. Total boundary force above+below meatless First opening: 01 = val x (Lot) = 2906Ibf 4. Comer forces F2=OI(Ll)/(Ll+L2)- 14531bf F2=Ol(L2)/(L3+L2)= 1453lbf S. Tribuary length of openings TI=(Ll-Lol)/(Ll+L2)- 4.01ft T2=(L2-Lol)/(LI.12)- 4.01ft 6. Unit shear beside opening VS=(WL)(LS+T3)/Ll- 231 p1f V2=(V/L)(T2+L2)/L2= 231 Of Check Vl'LI+V2.12=VP 138616f Oif T. Resltteme to comer forces Rl-V1eLl= 693 lbf R2=V2e12= 693lbf It. Dllleretce tourer force resistance Rl-F3= -260got R242= -2W 16f 9. Unit shear In comer Lorca vcl=(RI-Fl)/L1= -253 Of vc2 = (R2-F2)/@ _ -253 Of herb Summary of Shear Values for Ong Opening ne 1: val(hal+hbl)+VI(hol)=HP -633 1541 907 Ibf ne 2:vat(Mi.hbl)-v1(hal+hbl)-Vl(h.1)=07 90T 4f33 1541 0 ne3:val(hal+hbl)-vc2(hal+hbl)-VI(hol)N? 907 �33 1541 0 ne 4: vc2(hal+hbl)+V2(ho1)=HP 633 3541 907 Ibf Rep. Strip Facej 1453 lb Req. HD Force (H) W7IN Req. Shea Wag Anrhamge Force (Vw)l 99 pH *The Design Summary assumes that the shear wall is designed as blocked. 4-Term Story Drift%j 0.001% j 3Term Story Drift%( O.DD1% sx Pyex � See Pea= L4 = OAs65 C—AF ;rpG us L ►asT 3�- �5 `1.6 (0 project InfoFinatlon Code: 20181RC Dees: 7/28/2021 V @� L Hold-down forces: H=VK JL•,e Van taHM Met 2 e L S 145319 2. Unit sheer above+ leaders opening First opening: val=vat =H/(hal+hbl)= Sal pK 3. Total boundary fence above a below openings First opening: 01=va2 x(Lol)- 46541bf 4. Comer forces Fl-Ol(Ll)/(Llal2)' B271M F2. O1(L2)/(LI+L2)- 2327lbf S. Tributary length of openings n=(u•Lo1)/lu+u)= Cot it n =It2`la1)/(WL2)= 4.01R 6. Unit sheer baalde opening VI-(V/L)(LI+TIM- 3M p1f V2 = (V/U(T2+L2)/L2 - 370 pH Check VPLILWZ-hV7 2220 ibf OK 7. Resistance W comer forty RI-V3•LIe 2110IN R2=V2.12= 11101bf 8, Difference comer forte + resistance RI-F1= -1217I1A R242- -12171bf 9. Unit shear in comer cones ucl=(RI:1)n1= fog pH uc2=(R2.F2)/L2- i06 plf Check Summary W shear VOR far DIN Llpinktg Line l: vcl(hal+hbl)+V1(1hol)=H7 -SODS 2"S 145316f Line 2:val(h,I+hbI),cI(haI+hbI)-VI(ho1)W7 1453 -1015 2468 0 Line 3:va1(hal+hbl)-Q(holahb2)-VI(hol)-D7 1453 -1015 2468 0 U. 4:v (haI hbl)+V2(Fw1)=H7 -MIS 2468 1453lbf Rea. Strap Face 232) Ile( 4Term Slory OHR % 0.001 % 1-Terre SNry DrIR%� 0.0U1 % ) Rea.HD ForcejZ 16531bf seafa r2 sapw9r3 Reo. Shear Wall anchorage Force (amj ISB plf .� cµsTu, `TM Design Summary assumes that the&Mar wall is designed as blocked. p `_ ���R I��'�l/i5�=2�0� USF p.5f4/j �Fy� c�Au,S C_/ter uecr_� Wet, Ac-3v