Loading...
REV2 APPROVED BLD BLD2021-0869+Architectural_Plan+7.8.2022_8.55.53_AM+2976525i 1 A3.1 BASEMENT FLOOR DEMO PLAN 2 A3.2 REVISED PLAN APPROVED CITY OF EDMONDS BUILDING DIVISION lre,p-4 �or el BUILDING OF CIAL Jul 24 2022 APPROVED DATE ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE APPROVED PLANS MUST BE ON JOB SITE OBTAIN ELECTRICAL PERMIT FROM STATE LABOR & INDUSTRIES ---------------------------------------------- Interconnected Smoke Alarms Are A Requirement Of This Permit In Accordance With R314.2.2 --------------------------------------------- LEGEND 0 EXISTING TO REMAIN EXISTING TO BE REMOVED �XoMEL RES/pF ,�7 Ai Q Z • F 0 �TT o1�„w (F WA•2p65 O CN O 00 041. 0 Z W Q In LU 0 W o �Z (� CL 0 se L U ine Z LU o m LU O toLU 0 J O V a w LUCieZ (� . o � Q 0 w -> z �/ Q a i W = < z W LU LULU pe 04. w Z 00 cn w 0 = PRINT DATE: v DRAWING ISSUE: a PRELIM. PRICING SET Z PERMIT SET O CONSTR. SET o PERMIT REV. SET Z PERMIT REV. 2 SET a N DRAWN BY: OREVIEWED BY: 0 Z O ry W O cn O z Cie J Q W LL J O n CiezO O' a LU LU t— Q Z U) U Vic BLD2021-0869 7/6/22 DATE: 03.10.21 06.18.21 08.23.21 02.18.22 07.06.22 NC TLR REVISION Jul 08 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT AD2ml q I I ---------------------------------------------- Interconnected Smoke Alarms Are A Requirement !I Of This Permit In Accordance With R314.2.2 --------------------------------------------- ■ CARBON MONOXIDE ALARMS ■ !REQUIRED LOCATIONS PER IRC R315.3: APPROVED CARBON MONOXIDE ALARMS ISHALL BE INSTALLED OUTSIDE OF EACH SEPARATE SLEEPING AREA IN THE ' IMMEDIATE VICINITY OF THE BEDROOMS AND ON EACH LEVEL OF THE DWELLING ! ' IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. WHERE A ■ I BEDROOM OR ITS ATTACHED BATHROOM CONTAINS A FUEL -BURNING ■APPLIANCE, A CARBON MONOXIDE ALARM MUST BE INSTALLED IN THE BEDROOM. i I EXISTING DWELLINGS PER IRC R315.2.2 SHALL BE EQUIPPED WITH CARBON ! ■ MONOXIDE ALARMS IN ACCORDANCE WITH THE INFORMATION ABOVE (SOME I EXCEPTIONS MAY APPLY). AN INSPECTION WILL OCCUR WHEN ALTERATIONS, 0 ■ REPAIRS OR ADDITIONS REQUIRING A PERMIT OCCUR, OR WHEN ONE OR MORE SLEEPING ROOMS ARE ADDED OR CREATED. BATTERY POWERED ALARMS ARE i PERMITTED IN EXISTING DWELLINGS. 'COMBINATION ALARMS PER IRC R315.4 COMBINATION SMOKE AND CARBON ■ I MONOXIDE ALARMS MAY BE USED IN PLACE OF CARBON MONOXIDE ALARMS. ! ■ POWER SOURCE PER IRC R315.5 CARBON MONOXIDE ALARMS SHALL RECEIVE 0 I PRIMARY POWER FROM THE BUILDING WIRING AND, WHEN POWER IS ! ■ INTERRUPTED, SHALL RECEIVE POWER FROM A BATTERY. (SMOKE ALARMS/DETECTORS SHALL BE INSTALLED IN ■ ■ALL SLEEPING ROOMS, IN THE AREA OUTSIDE THE !SLEEPING ROOM AND IN OTHER LOCATIONS PER IRC ■R314 & NFPA 72. POWER SOURCE AND ! INTERCONNECTION PER CODE. ALARMS MUST BE A ■MINIMUM OF 36 INCHES AWAY FROM BATHROOM DOORS, ! ! HEATING OR COOLING REGISTERS, AND CEILING FANS. --------------- EXTERIOR WALLS SHALL BE FRAMED TO PROVIDE ADEQUP SPACE TO SATISFY 2018 WSEC INSULATION REQUIERMENTS L— — — — — — — — — — — — — — —I EXTERIOR WALLS SHALL HAVE AN R-VALUE OF R-15 FOR 2X4 WALLS AND R-21 FOR 2X6 WALLS. REFER TO 2018 WSEC SECTION R503 ------------------- co co (N)POSTS & FOUNDATION STRIP FTG PER STRL, TYP CONFIRMPOSTPOST 1 LOCATION CLEARS A3.2 FRENCH DRS @ STUDIO i I (N)DECKABOVE (N)BEAM PER STRL EXISTING WALKWAY & PATIO O (E)DS LINE OF SIDING ABOVE AT 1 ST FL (N)DS TIE INTO EXISTING / TIGHTLINE SYSTEM 10 1/4" T- 3/4" (E)DS LOCATION, R OCATE TOT E NORTH All F L J l (N)FOOTINGAND ?( 2X4 FRAMED WALL PER STRL (E)HOSfi BIE (E)BATH 007 A: 101.6 sq ft — — F-- - - J L �—————— — — — — —- (E)DS 2 . (E)STUDIO 005 P A: 142.73 sq ft IL _J (E)p� D I I � (E) ROOF ABOVE 1 A4.2 (N)CONC PAD, POSTS & BEAM PER STRL EJPILEI DO A: 16.55 8a ft (E)CLOSET 006 A: 48.39 sq ft (E)BEDROOM 004 A: 151.51 sq ft 2 A3.2 (E)DEN 000 A: 313.02 sq ft —1 1 L _J ) (E)DS f (E)LAUNDRY 002 A: 87.77 sq ft (E)UTILITY im A: 83.06 sq ft REROUTE (E)GAS BOILER EXHAUST AS NEED TO MAKE FIREPLACE FOTIONAL u I I I I (E)MUDROOM 001 A: 70.75 sq ft (E)CRAWLSPACE 009 A: 138.88 sq ft D D (N)BEAM & POST PER STRL D. P D D 1 A4.5 1 A4.3 BASEMENT FLOOR SrAI F 1/d" - 1'_n,, 1 A3.1 1 SEE SHEET A2.2 FOR A4.4 TYPICAL FLOOR NOTES LEGEND CO CARBON MONOXIDE DETECTOR SD SMOKE DETECTOR, SEE TYP. FLOOR NOTES #6 4 EXHAUST FAN ON SWITCH, SEE TYP. FLOOR NOTES #12. 0 EXISTING WALL SIDE SETBACK 0 NEW WALL NEW FLOOR AREA N GROSS SQ. FT.: (E) BASEMENT FLOOR: 1,269.47 sq ft \ 0_L RES/pF OAP 4TLij l J� i Q z RD 0 T�F OVA • 206 �'�1�^' 0 N 0 00 V� Z W Q LU LU w V) o 0 �Z_ � 0 LUJ ce zW L 0 1 LU CIO W t/) � J U 0 0 Q W LU � 0 w Cie Z cVi� Q o W > Z � � Q; w Q ce =o Q � w LU W o� w MM) LL � ce 011. LU z W 0 rl— (n LUJ 0 = PRINT DATE: 7/6/22 vDRAWING ISSUE: DATE: Q PRELIM. PRICING SET 03.10.21 Z PERMIT SET 06.18.21 0 CONSTR. SET 08.23.21 U PERMIT REV. SET 02.18.22 Z PERMIT REV. 2 SET 07.06.22 DRAWN BY: NC Z REVIEWED BY: TLR PZ Z: 0 Q V w H N Cie 0 w 0 Q 'LL Cie1� 0 < z Cie W II-_ 0 V rwn �./ MQ W REVISION 2 Jul 08 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT A201 +25'-4 1 l2" MAX ROOF RIDGE HEIGHT—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.— +16'-41/4",la SECOND FLOORi +8'-2" FIRST FLOOR BASEMENT FLOOR 281.38' +25-4 1 /2" MAX ROOF RIDGE HEIGHT �❑C REMOVE (E)BRICK FACADE, PROVIDE LJ NEW FOOTING PER STRL, AND NEW FRAMED WALL ABOVE. NEW SIDING TBD CRICKET BEYOND - DIRECT SHED ROOF DRAINAGE TOWARDS THE 278.30' APPROX. +22'-3 1l2"k (N)LIVING ROOM NORTH& SOUTH. SEE A2.4 & A4.4 (N) ROOF RIDGE HEIGHT — - — — — - SHED ROOF - — — - — 2 1 : 1.5 272.36' +16'-4 1 /4" 1. — — — — — — — — — — — — SECOND FLOOR N WATERPROOF INSULATED DECK 264.17' +8'-2",� FIRST FLOOR 256.38' + 0' 4 1 /2" AVERAGE GRADE 256.0' ±0",� BASEMEN I r Ei 1 111 1111 z- cD _ J Q 0 (N)UPPER EXTERIOR WALL BEYOND, ALIGNING - W/LIVING ROOM WALL W/ DROPPED CLG - — — — — — — — (N)SIDING TBD, DISCUSS W/ OWNER i u 1�1, 1 �[i a 1 �► ill I,1 I� 11 • • R• 1 III I■ -.I� -..� -L� �.I m■ -.I= m on� �.n It -.�� -..� -ino �.I1 I. -. IM -.._ -ln� �.I1 I �.Im u� �r�a I■ -.I= -mm� -L� III. -� •.= i- �� � � �! III■ � �� �� e A --A A k & PAINTED POSTS ■J MATCH (N) WINDOW, TRIM AND SILL W/(E) NEW DECK OVER ' W05 HEATED SPACE, St REMOVE \ (E)PORTION OF ao GABLE ROOF COORDINATE INTEGRATING (E)WINDOW'S (E) EXT FRAMING & SHUTTERS COORDINATE DEPTH OF GUTTER TO PROVIDE WEATHERING PROTECTION WINDOW +25'-4 1 /2" 281.38' MAX ROOF RIDGE HEIGHT APPROX. +22'-3 1/2" 278. (N) ROOF RIDGE HEIGHT +16'-4 1 /4" 272. SECOND FLOOR +8'-2" 264.17' FIRST FLOOR FINISH FL. 256.38' MENT FLOOR WEST ELEVATION CrAI F• 11A" = 1'-n" +25'-4 1 /2" MAX ROOF RIDGE HEIGHT (N)GLASS AWNING STRUCTURE STEEL OR WOOD SUPPORTS ---- . , , YSECOND FLOOR --I SLOPING•• DS (N)CONC SLOPING STOOP +8'-2" FIRST FLOOR FINISH FL. STAINED CLEAR CEDAR VERTICAL T&G SIDING AT ENTRY(OR IPE, TO BE CONFIRMED WITH OWNER) SOUTH ELEVATION SCAT P 114" = 1,-n" ce V` LUo0 W 0 = PRINT DATE: 7/6/22 v DRAWING ISSUE: DATE: Q PRELIM. PRICING SET 03.10.21 Z PERMIT SET 06.18.21 O CONSTR. SET 08.23.21 U PERMIT REV. SET 02.18.22 Z PERMIT REV. 2 SET 07.06.22 DRAWN BY: NC OREVIEWED BY: TLR H Z O U w N U) LU > O 0 c Q Q LU Cie J Z LU O U REVISION 2 Jul 08 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT A302 SEE' GUA N/S SECTION DECK SCAT F 12 ±6 NG TBD /A4.3 FOR TYP. RDRAIL NOTES _._._._._._._._._._._._._ _ _ (E) CHIMNEY PORTION OF (E)GABLE ROOF 12 (N) ROOF ±s I� la m •w Iw I} .w UNDERSIDE OF EAVE WD STAINED T&G I� NEW PONY WALL EXTENDING TO 36"H GUARDRAIL. EXPOSED WALL FACING DECK TO BE HORIZONTAL CEDAR STAINED SIDING; SOUTH SIDE TO BE SIDING PTD TO MATCH HOUSE. WOOD CAP TO MATCH GUARDRAIL I II I REMOVE (E) SHED ROOF +25'-4 1 /2" MAX ROOF RIDGE HEIGHT SEE SHEET A4.5 FOR ASSEMBLY LEGEND MINIMAL TRIM DETAILING AT CHANGE OF SIDING, TBD IX +16'-41/4" (N) GUTTERAND DS SECOND FLOOR PART OF (E) ROOF TO REMAIN; \ T I VENTED ROOF W/ R-49 BATT INSULATION DOWNSPOUT I11 11 � �� ,� ,IIII1111111111 EXISTING CONIC PATIO EXISTING CONIC PATIO (E) EAVE VENTING Ll — L-1 v . E S() TUDIO ■ IIIEXISTING SLAB: FLOOR +p° BASEMENT FLOOR O�,�C�MEL RES/pF�T'9 J G� Q RD Z Wq. 206 � O N O J 00 Z W Q LU 0 W (n O 0 �Z_ Cie f1 Q W ce Zw LU L W OLU 1 1w no z W LUCie � 0 W Z Q LU > z � Q > w Q ce =o Q � W LU W o� W mm) ce 011. W Z 00 W 0 = PRINT DATE: 7/6/22 H v DRAWING ISSUE: DATE: Q PRELIM. PRICING SET 03.10.21 Z PERMIT SET 06.18.21 O CONSTR. SET 08.23.21 U PERMIT REV. SET 02.18.22 Z PERMIT REV. 2 SET 07.06.22 DRAWN BY: NC OREVIEWED BY: TLR 0 Z O V W H Cie z W O o 1--- Cie o CU V LU Z O V .. ..Y .,. .«t .y r,• �� �� �� �!;'{.? Tw!T'T.... .. 7!t ..K .Ki!F' p W&OWWWWARivOt REVISION 2 CITY OF ... DEVELOPMENT SERVICES DEPARTMENT A402 (N) SKYLIGHT, LOCATION PER OWNER. CURB MOUNT INSTALLATION, FOLLOW MFR'S INSTALLATION INSTRUCTIONS (E) ROOF AND WALL 12 TO BE REMOVED �\ 2 F__ MTL EAVE FLASHING, R2 MATCH (E) (N) GUTTER, MATCH (E) i FASCIA BOARD AND T&G SOFFIT, MATCH (E) I I 2" CONTINUOUS STRIP SOFFIT VENT, W BATHROOM woe PROVIDE J-MTL AT SOFFIT EDGE, PROVIDE N POWDER CORROSION RESISTANT SCREEN, 1/4" MAX = OPENINGS ROOM � = I I z R 10 INSULATION @HEADER N z r?w Z TILE @ SILL, SLOPE AWAY • W I I 0 o FROM WINDOW 0 ~ W01 z I I PT SILL PLATE, TYP. I I MIN. CLR @ SIDING, TYP. CONFIRM EXACT HT OF GRADE SHALL SLOPE AWAY FROM _ SLAB FOR TILE TO ALIGN FOUNDATION MIN. 6" WITHIN FIRST 10' D.. .. p. FOOTING PER STRL. D F1 �' o . . .. . D E UTILITY P D. `y . P . D. . D D. D ... D D ly D. SECTION BATHROOM H - — — — — — 41 (N)EXPOSED WOOD DROPPED BEAMS W03 (N)EXTENSION OF NORTH & SOUTH WALLS, MATCH ADJ. r SURFACE & PAINT TO MATCH L BEAM PER STRL. (E) T&G CEILING (E) LIVING ROOM INTERIOR WALL & FINISH TO REMAIN O�,�C�MEL RES�pF�T'9 ij J G� Q Z RD, ITT<F tvA. 2 06 O N O J 00 O.. Z W - Q MAX ROO L V � o �Z � 0 0 w ce Zw 0 1 SEE SHEET A4.5 FOR ASSEMBLY LEGEND LU Uj O LU 1w o0 ; ............................................... 0 z i..0 T.O. PLATE Install per manufacturers w 4A o w01 p e z V 3 ; specifications. Have all z LL, Q PROVIDE PROTECTIVE ; F � 0 ENDS FLASHING manufacturer Z ENDS OF BEAMS, TYP � � Q \ Q 3 documentation on site. : � = o 5.1 ; Q SEE MFR'S DETAIL LU +41Uj A ` .—.—.—.—.—.—..—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—. SEE CONDD = V J ce) L.L. Q w LU M LUZ W = N W o LU 0 w +I Li GUARDRAIL, SEE =PRINT DATE: 7/6/22 1/A4.3 FOR TYP. GUARDRAIL NOTES v DRAWING ISSUE: DATE: Q PRELIM. PRICING SET 03.10.21 FINISHED DECK TO BE LOCATED 1" I BELOW FLOOR FIN. I R4 o M Z O 0 Z PERMIT SET 06.18.21 CONSTR. SET 08.23.21 PERMIT REV. SET 02.18.22 PERMIT REV. 2 SET 07.06.22 DRAWN BY: NC REVIEWED BY: TLR PT BEAM PER STRL r II 4 II Ilh IIII III (E)BRICK VENEER TO I I W01a BE REMOVED AND REPLACED WITH NEW I II FRAMED WALL WITH I II SHEAR AT EXTERIOR, I II PER STRL I II III IIII IJ � j TIE INTO EXISTING STORM -WATER SYSTEM, VIF BEST ROUTE. ROOF DOWNSPOUT DRAIN LINES SHOULD NOT BE CONNECTED TO THE FOOTING DRAINAGE SYSTEM \ 2 \ 5.1 EXISTING GLAZED FRENCH DOOR DOWNSPOUT IN FOREGROUND \ I , NEW CONC PADS & / DECK POSTS IN / FOREGROUND PER STRL. REFER TO GEOTECH REPORT FIRST 0 O V LU Cie N LL W O Cie Cie z O V +0" BASEMEN' REVISION 2 Jul 08 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT A404 (E) EXT. WALL WD TRIM (E) BEDROOM (V - co co 'v SECTION @ (E) ROOF (E) ROOF EAVE, FILL W/ R-38 INSULATION, (E)VENTING TO REMAIN +1 U-4 1 /4" SECOND FLOOR (E) OR REPLACED (N) GUTTER R-10 INSULATION @ HEADER (N) WINDOW SEAT W/ STORAGE BELOW W01 +8'-2" FIRST FLOOR FINISH FL. ;k:-- FILL W/ R-38 BATT INSULATION WINDOW SEAT ASSEMBLY LEGEND TAG DESCRIPTION TAG DESCRIPTION W01 TYPICAL NEW EXTERIOR WALL R1 NEW TORCHED DOWN SHED ROOF @ LIVING ROOM HARDIE PLANK SIDING TO MATCH (E) TORCHED GRANULATED SHEET DRAINAGE MAT SELF -ADHERED WATERPROOF PLY SHEET VAPORSHIELD "WRAPSHIELD SW MEMBRANE 114" DENSDECK PRIME, MECHANICALLY ATTACH W/ 3" PLATES & SCREWS PLWD. SHEATHING PER STRL. NAILED PLWD. SHEATHING PER STRL. 2X6 STUDS @ 16" O.C. RAFTERS PER STRL. R-21 BATT INSULATION MIN. R-38 SPRAY FOAM, R-7/INCH, SEE ASSEMBLY NOTES. NON -VENTED ROOF CERTAINTEED "MEMBRAIN" 1/2" GWB (FOR THERMAL BARRIER REQUIRED W/ SPRAY FOAM) I E I T E NS CEDAR OR FIR T&G - TO BE APPROVED BY OWNERS W01a NEW BASEMENT EXTERIOR WALL R2 NEW STANDING SEAM ROOF @ EAST ADDITION SIDING TBD MECHANICALLY SEAMED STANDING SEAM MTL ROOF, SEE SPEC LIST DRAINAGE MAT 'GRACE ULTRA' HIGH TEMP SELF -ADHERED PRODUCT VAPORSHIELD "WRAPSHIELD SA" MEMBRANE PLWD. SHEATHING PER STRL. PLWD. SHEATHING PER STRL. RAFTERS PER STRL. 2X4 STUDS @ 16" O.C. MIN. R-38 SPRAY -FOAM, R-7/INCH, SEE ASSEMBLY NOTES. NON -VENTED ROOF 4 4 R-21 BATT INSULATION (OR MAX) PTD 1/2" GWB R3 NEW ROOF DECK OVER HEATED SPACE (E)2X4, INSULATION & FINISH COMPOSITE DECKING W02 YPICAL N INTERIOR LL PT SLEEPERS, MIN 1/4"/FT GRADIENT PTD 1/2" GWB EXTRA LAYER SINGLE -PLY CONTINUOUS MEMBRANE 2X4 FRAMING PER STRL. SINGLE -PLY CONTINUOUS MEMBRANE, 80 MIL PVC OR SIM PTD 1/2" GWB DENSDECK COVERBOARD PLYWOOD SHEATHING PER STRL SLOPED JOISTS PER STRL W03 TYPICAL NEW INTERIOR WALL PTD 1/2" GWB MIN. R-38 SPRAY FOAM, R-7/INCH, SEE ASSEMBLY NOTES. NON -VENTED ROOF 2X6 FRAMING PER STRL. FURRING FOR FLAT CEILING PTD 1/2" GWB PTD. 1/2" GWB R4 NEW DECK FLOOR ASSEMBLIES COMPOSITE DECKING PER OWNER'S SPEC LIST TREX RAIN ESCAPE SYSTEM OR EQUAL, INSTALL PER MFR REQ'S F1 TYR (N) SLAB ON GRADE FOR TILE FLOORING: PT JOISTS PER STRL. FLOOR TILE PRE -FINISHED MTL PERFORATED PANELS, SEE SPEC LIST CRACK INSULATION MEMBRANE IMBEDDED IN THINSET THINSET *SPRAY FOAM INSULATION NOTE: CONIC SLAB PER STRL. PRODUCT: "NATURAL THERM HFO" BY NATURAL POLYMERS. INSTALLER: AT STEGOWRAP 10MIL VAPOR BARRIER FOAM, JOHN RAYL, P:425-330-6008. R-10 RIGID INSULATION UNDER ENTIRE SLAB 4" CLEAN COMPACTED GRAVEL ALL LOCATIONS WHERE SPRAY FOAM IS INSTALLED, THE INSTALLER MUST VERIFY THE SUBSTRATE IS PROPERLY DRIED, AND READY TO RECEIVE SPRAY FOAM, AND ALL ENVIRONMENTAL CONDITIONS ARE PROPER PRIOR TO APPLICATION. A COPY OF THE ICC-ES REPORT FOR THE INSULATION PRODUCT MUST BE PROVIDED ON SITE FOR THE FIELD INSPECTOR. THE APPLIED SPRAY FOAM MUST BE INSTALLED IN ACCORDANCE WTIH THE MANUFACTURER'S INSTRUCTIONS BYA CERTIFIED INSTALLER. REFER TO STRL DRAWINGS FOR ALL SHEAR WALL LOCATIONS \VMEL RES/pF OAP 4T l Lij_J i Q� Q z R F�TT`F WA • 20 6 .01�^� O N O J 00 Z W Q LU 0 w V, o �z Cie CL. 0 LU o ce Zw LU o O LU LU 19 o0J QLULU � 0 LU3Cie7 V� Q Z � Q Q LU Q w LU LUo� LU ~ �1 pe V` LU z W 0 r__ cn LU 0 = PRINT DATE: H v DRAWING ISSUE: Q Z O U Z Q PRELIM. PRICING SET PERMIT SET CONSTR. SET PERMIT REV. SET PERMIT REV. 2 SET DRAWN BY- OREVIEWED BY: 0 Z 0 LU co co H N w Cie`' (o C) LU U)z O < W 0 O W (J ~ LUzJ Cie O O � � U W 0 Q 0 7/6/22 DATF 03.1021 06.18.21 08.2321 02.1822 07.06.22 NC TLR REVISION Jul 08 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT A405 4 PLAN LEGEND CONCRETE SPREAD FOOTING PER FOUNDATION SCHEDULE BELOW (E) CONCRETE CONCRETE STRIP FOOTING (E) FULL HEIGHT CONCRETE FOUNDATION WALL (V.I.F. WHERE SUPPORTING NEW BEAMS OR POSTS) (E) CMU FOUNDATION WALL (U.O.N. @ BRICK VENEER) (E) STONE RUBBLE FOUNDATION WALL NEW OR EXISTING STUD WALL ABOVE FLOOR NEW OR EXISTING WALL BELOW FLOOR NEW OR EXISTING WINDOW BY ARCH (S.A.D.) 2" O W.S.P. SHEAR WALL _ L TYPEOX w/ MIN. S2 IS7 S8 LENGTH 'L' PER OR ���� POST ABOVE OR BELOW FLOOR PER S2 S7 S7 � K POST & HOLDOWN PER S2 EPDXY REBAR DOWEL NEW q �- TO (E) FOUNDATION PER S1 UNDERPIN (E) SLAB w/ NEW PAD FOOTING. USE 'ABAZ" UPF POST BASE w/ 2'0 EPDXY ANCHOR @ NEW POST THRU (E) SLAB w/ 8" EMBED. INTO NEW FOOTING FOUNDATION SCHEDULE F1 16" WIDE TURNED PERIMETER STRIP —DOWN FOOTING PER A S7 0 2'-0"SQ. STEEL ENTRY POST PAD FOOTING PER B S7 6 FOUNDATION WALL BUILD —OUT C BLW WINDOW SEAT PER S7 6 2'-0"SQ. DECK POST PAD FOOTING PER D S7 6 2'-0"SQ. INTERIOR PAD FOOTING PER E S7 6 16" WIDE STRIP FOOTING PER S7 NOTE: SEE SHEET S1 , GENERAL NOTE 4.3 FOR OVER —EXCAVATION REQUIREMENTS IF LOOSE SOILS ARE ENCOUNTERED AT FOUNDATION SUBGRADES WI I H UUMF'AU I tD 51 KUU I UKAL FILL MAY tat NtC;t55AKY IF NATURAL SUBGRADES ARE INADEQUATE. REFER TO SHEET S1, GENERAL NOTES 4.2 & 4.2 FOR MORE INFO. REVISION Jul 08 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PERMIT SET N Z Z O O N N w w of Z o W a_ H W d N > W 0! w N ~ Z O I — 0_ Of H H 5 U fn o N o J L I 0_ w V) W 0 0 0- in N N N N N N in M O N O O N N W I I I I F- r, O N O 00 O cO O Q W G_ N z O O O Q O w 0 > rn IW— Q O N Q) 00 > rn Y Q Q t 3:: C:6 z , o O a) E _0 W t p Q o p E 00 , -0 in w w Q O L Z O w O_' J 0_ U 311[e]1113131211110e3 3161e01:1R, U a00 � 0 WH z� LLJ p w =p WW NNE~ r 1-� OoNON N N ~ Ed SCALE: AS NOTED JOB NO. 21018 SHEET. NO. S3 PLAN LEGEND NEW OR EXISTING STUD WALL ABOVE FLOOR NEW OR EXISTING WALL OR FOOTING BELOW FLOOR NEW OR EXISTING WINDOW BY ARCH (S.A.D.) W.S.P. SHEAR WALL LA G— H —C E TYPE( w/ MIN. II S7 S7 S8 S8 LENGTH 'L' PER OR ���� POST ABOVE OR BELOW FLOOR PER SZ OR `1-�S GPOST & HOLDOWN OR TIEDOWN STRAP PER G —L _ S2 S2 EPDXY REBAR DOWEL NEW SLAB/FTG TO (E) L- SLAB OR FOUNDATION WALL w/ #3x24"LONG @18"o.c. w/ 4" EMBED. INTO (E) CONCRETE, PLACED @ (E) OR NEW SLAB MID —DEPTH — — — — — — — — METAL STRAP PER PLAN /_� ING 1ST1 � T.O. R B3FTOOT.O HRIIMHJOIST I 1 ST2 'MSTA30' STRAP ACROSS NEW TO (E) DBL TOP PLATE EAST END OF BEAM SHALL BEAR ON (E) CONCRETE FNDN (NOT CMU) SOG 4" CONCRETE SLAB ON GRADE C w/ 6x6—W4.5xW4.5 W.W.F. PER S1 SWO STRAP AROUND OPENING IN SHEAR WALL PER S2 EFB EHDR ESOG BEAM HANGER c ik (E) FLUSH BEAM (ASSUMED) (E) DROPPED HEADER OVER WALL OPENING BELOW (E) CONCRETE SLAB ON GRADE FLUSH —FRAMED JOIST OR BEAM CONNECTION; SEE FRAMING SCHEDULE FOR HANGERS, U.O.N. ON PLAN OR DETAILS (JOIST HANGERS NOT SHOWN ON PLAN FOR CLARITY) JOIST OR BEAM BEARING ON DROPPED BEAM OR HEADER (BEARING WALL SIM). POST DOWN TO HEADER WHERE OCCURS (POST WIDTH TO MATCH BEAM, NOT SHOWN FOR CLARITY). INSTALL FULL —DEPTH BLKG EACH SIDE OF JOIST OR BEAM OVER SUPPORT FERAWNG SCHEDULE CALLOUT JOIST/BEAM HANGER REFER TO DETAILS) (U.O.N. ON PLAN) (OR SEE NOTES BLW) 1 FB1 54x7 PSL 1 .8E (FLUSH) HUC68 N/A 1 FB2 (6) 14x74 LVL N/A C SIM (FLUSH) S2 32x94 PSL (HEADER, 1 FH3 TOP FLUSH w/ U/S N/A A L 3 S2 S8 DBL TOP PLATE DBL 14x74 LVL C F I—J RDJ1 @16"o.c. LUS48 S2 S7 S7 DBL 14x74 LVL C I—J RDB2 (FLUSH) HUC48TF S2 S7 54x92 PSL (TOP F RDB3 FLUSH w/ T.O. (E) N/A FLOOR JOISTS)S7 DJ4 2x8 PT @16"o.c. LUS28Z OR LUC26Z L— S7 D135 6x8 PT N/A L s7 INSTALL 2x4 CRIPPLE WALL ABOVE TO SUPPORT (E) RDB6 DBL 14xA LVL HUC48TF RAFTERS; HANG (E) CEILING JOISTS OFF SIDE OF RDB6 w/ 'LUS' HANGERS (V.I.F. FIT PRIOR TO PURCHASE) EHDR NOTE: ALL FRAMING MEMBERS SHOWN ON THIS PLAN BUT NOT EXPLICITY CALLED OUT ARE (E) 2x8 FLOOR JOISTS @16"o.c., U.O.N. FRAMING DIRECTION HAS BEEN ASSUMED IN SOME AREAS; V.I.F. FRAMING DIRECTION & PROVIDE 'LUS28' OR 'LU28R' HANGERS AT (E) JOISTS FRAMING INTO NEW BEAMS (V.I.F. JOIST SIZE & HANGER FIT PRIOR TO PURCHASE) R K :RS REVISION Jul 08 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PERMIT SET N — Z Z 0 0 L L > > w w O Z 0 ch w CL ck� w CL In > Uj Of - w N Z 0 I— a N O N O J Ii1 0:� w V) w d d L� d 0 N N N N N N I I I I O O N N w I I I I I- I" O N O o0 O c0 O Q w Z O 0 0 Q ck: (1) > Q 0 00 rn Z Y a� > Q 0 00 rn c;d Z O 00 o Q p 0 o p w w p Q F_ 0 w Z O II d' J a 0 hI►[e11�1��:S�l�:��K�l:�� U � z a ON ON C7 z� Z ww o z 0 o J W � �' � li Lv N O�NON SCALE: AS NOTED JOB NO. 21018 SHEET. NO. S 4 WSP SHEAR WALL PER PLAN AND S.W.S. 2x6 STUDS @16"o.c. SILL BOLTS PER 2x P.T. MUDSILL S.W.S. DE E.N. PER S.W.S� SLAB PERGPLAN z x x x x M EXTERIOR GRADE z m #3 TIES w/ 1 35* ♦ • • ----HOOK @12"o.c., ALTERNATED 2) #4 T&B BARS FOOTING PER PLAN TURNED —DOWN STRIP FOOTING n r TYP. TYP. BASE PLT'---,,, FINISHED GRADE OR TOP OF EXTERIOR SLAB z EXTERIOR SUB —GRADE 0z —:m zo �m 00 w 399 CLR STEEL POST FOOTING #5@12"o.c. EACH WAY 0 � J U EXTERIOR WALL SHEATHING SQUARE HSS 2x6@16"o.c. POST PER PLAN SILL BOLTS PER 12" MAX. NON —SHRINK, S.W.S. NON—METALLIC GROUT w/ MIN. 7500 PSI 2x10 P.T. MUDSILL COMPRESSIVE STRENGTH AT 28 DAYS E.N. PER S.W.S. LYWOOD E) SUBFLOOR kl- TRPL 2x E) RIM JOIST �(E) MUDSILL z_ m � • EXTERIOR GRADE 499 CONCRETE z BUILD —OUT (4) a"0 EPDXY #5 T&B ANCHORS; USE _ BARS LEVELING NUTS BLW CO BASE PL AS REQ'D �� • 3" CLR FOOTING PER PLAN (2) STAGGERED ROWS #4� HOOKED EPDXY REBAR DOWELS @16"o.c. FOUNDATION BUILD —OUT (E) FLOOR JOIST (E) CONCRETE FOUNDATION WALL 'PBSZ' POST POST PER BASE PLAN (E) OR NEW FLATWORK BY OTHERS EXTERIOR GRADE 4@12"o.c. BOTTOM BARS EACH WAY zo 0 0 FOOTING PER PLAN I� DECK POST FOOTING FOOTING PER PLAN PAD FOOTING SCALE: NTS - SCALE: NTS - SCALE: NTS - SCALE: NTS - SCALE: NTS - WSP SHEAR (E) EXTERIOR WALL PER PLAN STUD WALL E.N. PER S.W.S. WSP SHEAR 2x6 STUDS (E) SHEATHING---_.(E) FLOOR SHEATHING WALL PER PLAN @16"o.c. SOLE PLATE „ 2x BLKG @4 —0 o.c. WHERE 'LS50' CLIPS @ FRAMING SOLE PLATE 2x SOLE PLATE FASTENERS PER S.W.S JOISTS ARE PARALLEL TO CLIP SPACING PER S.W.S. d AT OBLOCK FASTENERS PER S.W.S. E) SUBFLOOR WALL, TYP. ALL AROUND ENTIRE BASEMENT PERIMETER w/ #6x2 SPAX SCREWS (DO EACH (E) 2x SOLE PLATE NOT PENETRATE ROOFING) E.N. PER S.W.S. E.N. (E) FLOOR JOISTS w/ E OR NEW 2x MAIN FLOOR FLOOR SHEATHING E.N. FLOOR E.N. HANGERS PER PLAN RIM JOIST OR BLKG 2x BLKG FRAMS.W,ING S LIPS FLUSH BEAM OR SHEATHING FLOOR � II 11 PER DBL 14 LVL RIM ROOF DECK FLUSH BEAM OR ROOF DECK SHEATHING FRAMING CLIPS I II DBL 14 LVL RIM PER S.W.S I II (E) ROOF EXTERIOR WALL —`-'EXTERIOR ROOF DECK (E) 2x MUDSILL II 11 SHEATHING SHEATHING WALL SHEATHING (V.I.F.) ROOF DECK m (E) FLOOR JOISTS E) RAFTERS E S.W.S. JOISTS PER E.N. PER � ~ ° (E) FOUNDATION a (ORIENTATION PLAN S.W.S. 6- WALL VARIES) (E) CEILING JOISTS 4„ (ORIENTATION VARIES) 14 LVL BLKG @4'-0"o.c. ROOF DECK JOISTS EAM PER PLAN EMBED. MUDSILL ANCHORS (E) WALL .N. PER S.W.S. (E) EXTERIOR WALL SHEATHING E) DBL TOP PLATE (E) EXTERIOR GERS TO HEADER N PER PLAN (PER PLAN OR SWS) S.A.D. FOR SLOPE 14 LVL LEDGER w/ EXTERIOR SIMPSON 'URFP' a STUDS E) DBL TOP PLATE E) 2x4 STUDS @16"o.c. WALL SHEATHING ROOF DECK JOISTS w/ (2) STAGGERED ROWS 'SDWS2250ODB' GRADE �„ PLATE w/ (2) 2 E) DBL TOP PLATE HANGERS PER PLAN TITEN HD (E) SHEATHING WSP SHEAR WALL @8"o.c. (4"o.c. NET) PER PLAN E) 2x4 STUDS @16"o.c. ROOF DECK AT EXTERIOR WALL F SHEAR WALL ON EXISTING G SHEAR WALL AT EXISTING EAVE H ROOF DECK I ROOF DECK =J SCALE: NTS - SCALE: NTS FOUNDATION - SCALE: NTS - SCALE: NTS - SCALE: NTS - (2) STAGGERED ROWS 'SDWS2250ODB' WSP SHEAR WALL PER @16"o.c. (8"o.c. NET). USE LONGER PLAN AND S.W.S.---,,2x STUDS @16"o.c' SCREWS IF NECESSARY TO ACHIEVE MIN. 2x P.T. RIM JOIST PROTRUSION BEYOND RIM JOIST SILL BOLTS PER S.W.S. 2x P.T. MUDSILL w/ (3) 16d END DECKING BY EXTERIOR WALL & E.N. PER S.W.S. NAILS CENTERED IN EACH DECK JOIST OTHERS (S.A.D.) z 2x P.T.LEDGER m FLOOR FRAMING ONT. 4 BAR # DECKING BY (E) SLAB ^I ARCH. (S.A.D.) ``� ON GRADE z z r a — U • 2x P.T. BLKG 2x RIM JOIST 'H 1 Z' TO EXTERIOR GRADE 1 EACH JOIST �� ?1. A" MIN. • V.I.F. z CONT. #4 BAR 1 � 1 . DECK JOISTS DECK2WALL SPACER SWS -j #3 TIES @12"o.c. ; PER PLAN MODEL D2W38 iv ALTERNATE SIDES 6" STEM BEAM PER DECK JOISTS w/ 0 1 STEP AT OPNG PLAN HANGERS PER PLAN � #5 CONT. BOTTOM BAR • 'DTT1 Z' w/ 'SDWH' SCREW w/ DBL TOP PLATE ®®® � MIN. 3" PENETRATION INTO (E) M DBL TOP PLATE AT ENDS OF WALL SHEATHING DECK AND @5'-4"o.c. BTWN FOOTING PER PLAN STRIP FOOTING AT STUDIO SCALE: NTS DECK BEAM Jl HL_L. Iv I J L 1 DECK TO HOUSE M - SCALE: NTS - ;All field welding shall be done by a WABO certified welder z� � w W H � o REVISION Jul 08 2022 W CITY OF EDMONDS N N OOP DEVELOPMENT SERVICES DEPARTMENT Vr CONT. 2x6 RIDGE 2x4 OVER —FRAMING OVER —FRAMING (NOTCH AROUN RAFTERS @24"o.c. ROOF SHEATHING SLEEPER 2x4 STRUT @ DBL PRIMARY RAFTER OR TRUSS SPACING ALONG EACH OVER —FRAMING RAFTER, STAGGERED TYP. (2) 1Od EACH END CONT. SHAPED 2x6 PLATE w/ (2) 16d TO EACH PASSING RAFTER OR TRUSS (3) 1Od TOE —NAILS W ' (3) 1Od, TYP. 2x4 @5'-0"o.c. (2) 1Od MAX. TO ALL TOE —NAILS STRUTS GREATER TO EACH THAN 5'-0" TALL STRUT TYP. 10d@6"o.c. 2x10 FLAT SLEEPER, _ TYP. ALONG ALL VALLEYS PRIMARY ROOF SHEATHING PRIMARY ROOF AFTERS OR TRUSS TOP CHORDS PER PLAN 2x4 SPANNING BETWEEN MIN (2) RAFTERS, w/ (2) 16d EA. END TO RAFTER BLW, TYP. UNDER STRUTS. FASTEN STRUTS TO 2x4 w/ (2) 1Od TOE NAILS, TYP \ ALIGN STRUTS OVER RIMARY RAFTERS OR TRUSSES, TYP. TYPICAL OVER —FRAMING SCALE: NTS 2'-0„ (4) 1Od AT EACH LOOKOUT RAFTER E.N. ROOF SHEATHING E.N. PER S.W.S. (3) 16d END NAIL INTO[RAFTERS PER PLAN DBL TOP PLATE EACH RAFTER WSP SHEAR WALL PER PLAN (CONTINUE 2x4 LOOKOUT RAFTERS @2'-0"o.c. UP AND NOTCH AROUND LOOKOUTS) 2x6 @16"o.c. TYP. RAKE SCALE: NTS ROOF SHEATHING (5) 1Od TO EACH BLOCK E.N. RAFTERS (RR1) PER PLAN E.N. (PLACED BTWN VENT RAFTERS PER PLAN 2x RIM JOIST NOTCHES) (CUT AT EAVES TO CREATE TAILS) E.N. PER ROOF S.W.S. SHEATHING -----_ FRAMING CLIPS DBL TOP — — — — — — — 2x BLKG PER S.W.S. PLATE — L SHAPED 2x BLKG (S.A.D. FOR @4'-0"o.c. VENT NOTCHES) SHI 2x6 CRIPPLE TUDS @1 6"o.c. BL TOP PLATE — — ROOF BEAM — — — — BTWN BEAMS — E.N. PER S.W.S (RB2) PER PLA — 2x6 @1 Cox. BEFORE/BEYOND WSP SHEAR WALL PER PLAN E.N. PER S.W.S. BL TOP PLATE WSP SHEAR 2x6 STUDS @16"o.c. WALL PER PLAN SHED ROOF SAVE E LIVING ROOM ROOF PEAK SCALE: NTS (E VSP SHEAR WALL ER PLAN PDXY SILL BOLTS ER S.W.S. .N. PER S.W.S. E) FOUNDATION PROFILE MAY VARY ROM THAT SHOWN) SHEAR WALL ON EXISTING I SCALE: NTS FOUNDATION - SCALE: NTS (5) 1Od AT ROOF EACH LOOKOUT SHEATHING E. PER PLAN 2x BLKG E.N. PERK S.W.S. RAFTERS WSP SHEAR WALL PER PLAN PER PLAN (NOTCH BL TOP PLATE AROUND LOOKOUTS) 2x6 STUDS @ 1 6"o.c. TYP. LIVING ROOM ROOF SAVE SCALE: NTS WSP SHEAR V 2x6 STUDS @16"o.c. WALL PER PLA AND S.W.S. 2x SOLE PLATE SOLE PLATE (5) 1Od TO EACH FASTENERS PE LOCK AT JOISTS S.W.S. PARALLEL E.N. PER S.W.S. E) FLOOR SHEATHING (E) OR 2x NEW RIM 2x JOIST BLK (V.I.F.) II II E.N. PER S.W.S.-----'.,III IXI � illl E.N. PANEL JOINT WHERE OCCURS i III E.N. PER S.W.S. (E) FLOOR JOISTS (E) DBL TOP PLATE ER PLAN (ORIENTATION VARIES) 2 x 4 STUDS @16"o.c. 2x BLOCKING @4'-0"o.c. AT JOISTS PARALLEL WSP SHEAR WALL PER PLA AND S.W.S. SHEAR WALL AT EXISTING FL00 SCALE: NTS BL TOP PLATE BRIM 1 JOIST m SIN WALL SHEATHING E.N. ROOF SHEATHING EXTERIOR WALL STUDS (2) 'SDWS2250ODB' CENTERED IN EACH ASSING STUD, (3) AT 2x10 OR DEEPER LEDGER 2x LEDGER (DEPTH SHALL BE ONE RAFTERS SIZE DEEPER THAN PER PLAN RAFTERS) / 'LRU' OR 'LSSJ' HANGERS RAFTERS PERPENMCUE R ROOF TO EXTERIOR WALL SCALE: NTS TEMPERED OR CONT. LEDGER EL3 LAMINATED GLASS PER PLAN w/ (2) ROOF PANEL & STAGGERED ROWS ATTACHMENT TO STEEL #12x22 FLAT HEAD FRAMING BY OTHERS —IN WOOD SCREWS @8"o.c. (4"o.c. STEEL RAFTERS ER1 NET), TYP. PER PLAN (COPE AROUND BEAM) STEEL BEAM EB3 / PER PLAN w/ $" FILLET WELD ALL AROUND TO EL3 E.N. PER S.W.S. EACH SIDE OF WSP SHEAR WALL POST a PER PLAN TYP. EACH s END CAP PL4 1 PP STEEL POST 8 PER PLAN EXTRY AWNING TO HOUSE SCALE: NTS TIEDOWN POST w/ STRAPS WHERE OCCURS ON PLAN -1'- ROPPED HEADER PER PLAN DBL CRIPPLE STUD DBL SILL AT (FACE NAILED PER WINDOW CONDITION GENERAL NOTE 7.1) FACE NAILED w 1 6d@12"o.c. --IT----T1-----IT---- Il____11_____11____ II II TIEDOWN TO DROPPED HEADER C(7�:L' SCALE: NTS - E.N. ROOF SHEATHING 2x RIM RAFTER w/ (3) 16d TO EAC PASSING STUD WALL SHEATHIN EXTERIOR WALL STUDS RAFTERS PARALLEL RAFTERS PER PLAN ROOF SHEATHING N. 2x RIM SHIM BLW HANGER ATTIC JOISTS w/ TOP FLANGE HANGERS PER PLAN DBL TOP PLATE 2x6 STUDS @1 6"o.c. ;All field welding shall be done by a WABO certified welder ' C AI RAFTERS PERPENDICULAR E.N. ROOF SHEATHINGS 1 Od@6"o.c.� CONT. 2x4 (OR RAFTER PER PLAN) RAFTERS PARALLEL ROOF TO EXISTING ROOF - SCALE: NTS E) ROOF SHEATHING E.N. OVER —FRAMING A (E) RAFTER NSFC; REFER TO _ (SHAPE VARIES, S.A.D.) E.N. PER S.W.S. 2x BLKG @4'-0"o.c. WSP SHEAR BL TOP PLATE WALL PE (5) 10d TO PLAN 2x6 STUDS @16"o.c. EACH BLOCK E.N. PER S.W.S. SOLE PLATE FASTENERS PER S.W.S ROOF SHAPED 3x SHEATHING SOLE PLATE — SHIM, ---- RIM JOIST TYP. INV. 'MSTC48B3' RAFTERS I.N.x EACH SIDE OF (RR1) PE 2x BLK OPNG ONLY PLAN PER S.W.S. WHERE HEADER SUPPORTS DBL TOP TIEDOWN POST PLATE 2x6 CRIPPLE STUDS WALL — — — — — @ 1 6"o.c. BTWN BEAMS STUDS ROOF BEAM (RB2) PERT HOLDOWNS PER PLAN BEFORE/BEYOND PLAN (TIEDOWN 2x6 STUDS @16"o.c. N. PER S.W.S. STRAPS SIM. WHERE OCCURS) SOLE PLATE W.S.P. SHEAR FASTENERS PER S.W.S. WALL PER PLAN 2x SOLE PLATE N. PER S.W.S. SILL OR E) ATTIC JOISTS F'z./pItR SOLE PLATE / HANGERS BEAM PER PLA PLAN LIVING ROOM ROOF GUTTER SCALE: NTS THING E) ROOF SHEATHING E) RAFTER z� w W z � � o REVISION tz ¢ Jul 08 2022 W 41, . CITY OF EDMONDS N N OOP DEVELOPMENT SERVICES DEPARTMENT Vr