Loading...
REV1 REVIEWEDBLD2022-0329+Structural_Calculations+5.27.2022_3.02.19_PM+2899306REVISION May 27 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2022-0329 Moats Residence Remodel Structural Calculations . The following documentation shall be available on ' site for the building inspector: ® COE APPROVED ARCHITECTURAL PLAN SET ' 9015 218t" Street S.W. : ❑ COE APPROVED STRUCTURAL PLAN SET ; Edmonds, WA 98026 ❑COE REVIEWED CALCULATION PACKET Snohomish County ❑ENERGYCREDITWORKSHEET . ❑ SITE PLAN ❑ CIVIL PLAN :® ORIGINAL STAMPED PLANS �❑ ■ CITY OF EDMONDS BUILDING DEPARTMENT 2021 ; Sidesway Project No. 22024.01 REVIEWED BY CITY OF EDMONDS BUILDING DEPARTMENT Prepared By: SIDESWAY ENGINEERING APPROVED PLANS MUST BE ON JOB SITE ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE o�/moo/zz Moats Residence Remodel March 30, 2022 Project No. 22024.01 Project Description Sidesway Engineering was retained by the homeowner to perform analysis and design as necessary to obtain a building permit for the proposed remodel at the existing single-family residence located at 9015 218th Street S.W. in Edmonds. The remodel work includes the removal of the interior bearing wall on the main floor to open up the kitchen to the living room. As part of this remodel, the brick/CMU chimney will be removed as well. The roof is a conventionally wood framed collar tie system and the floor is framed with joists spanning between existing exterior strip footings and central post and beam lines. Some of the roof rafter braces were removed at some point to accomodate attic storage and will be re -installed as part of the remodel. The pertinent existing framing and dimensions were obtained by Sidesway during a field visit by our firm, however we did not perform a complete as -built of the existing structure. The interior remodel work does not affect the existing lateral system of the house, therefore wind and seismic analysis was excluded from our scope of work. It is also our understanding that the homeowner is it the process of applying for a building permit for a small addition on the north side of house which includes a shed roof replacement with gable framing at the northwest corner of the house. This addition was prescriptively designed by the homeowner and Sidesway was not involved in that project. Scope of Work Provide gravity calculations for the proposed remodel as required to obtain a building permit. Provide hand drawn framing sketches and details as required for permitting. Design Criteria 2018 International Building Code (IBC) 2018 International Existing Building Code (IEBC) ASCE 7-16 Minimum Design Loads for Buildings and Other Structures Applicable Material Reference Standards (ACI, AISC, NDS) This is a Risk Category II structure designed for the following loads: Dead Loads Snow Load: Live Load: Project Summary 15psf (roof & Ceiling) 25psf 40psf (floor) The new framing as designed in the following calculations conforms to the 2018 IBC and IEBC. Refer to the attached structural sketches and calculations for structural framing requirements. Disclaimer This calculation package is based on the documentation that was available to us and information obtained during our site visit. Sidesway Engineering did not perform a complete as -built to verify the accuracy of data provided by the homeowner, and we should be contacted if there are any discrepancies with the assumptions contained within these calculations. We assume the structure has no known deterioration or damage that would adversely affect capacity. 20305 871h Avenue W. Edmonds, WA 98026 SIDESWAY (425)673-4160 ENGINEERII.G 'S4102Z-rJ(. arc2 CON"(2A-C-ro(Z. ZNS-(ALL S40aa JC p(LZotz 10 a ewLo J-LN r, LoKkO fBSA421+v (6 E.L , NEN'i'S . FntEVJ C'"Lf QooF Si5-(ffM ;"Na-( of /. n�Evv 4'vtiD'in-7�1 3y o'1AG+LS K15'Itik(o L9V'kN1i Sv,rcE. '. oVC& ()glL66Ey V'N(,a0.NG%4'7 S.tc9 QwF � SNED Qmf (Z�2Kti 1{r STUD gm ErsS'fsN6 21b Ccs L�-N6 7nMS G�'1 A'1 6Ek1"'� r�vD aTl.tcµc-� � % gr..Mn•t w/ 1 J52�t92 54"`^_• EKt-s�(�•r+b 2�4 2ooF ¢eF-rwQ-S '. R UJC,.Ff4N6ED. TNF'LLL WITH ZxyjUF *► e w lLUS kA Lf,,-S -t- $CAM AND µEAtee,3 - QeFFLAG AN`/ DP'MP.C.0 OQ M'LSS7•N% QooF Q41F1fQ-5 Oa UwowvQI.'Y.NI 51"TS W ZT F I L1(E-K1wD (MLN• Z DF rtz). �3 1f2 z � (272� FxSSI-IN1. 11"i PAFTE,as (rZKb Cf1L1NG lei 4Z5 �Ib'� O • C.l � uNLUFh'N6�D I 1�v3$E- I W \_GgZO g1eAP EAtkt Soss-T tCQoSS B¢Arn w�(io) o•131 * 2-1/Z sTdkca3 EAL,& S1'JE. SZe.AP LE/j614 DF GLE wI LC-6 ST "e S�p �I N£vJ Ouc2G(ffrM"1.N (. �t- 02 -J-NSS-CALL FQ' aN / WALL. rev . B¢A-rA •tp Q-LDGE $oYa-2-O ..... Framing Sketch LFM Qo C LEVCL Dare 03/15/22 22024p1 I D E WAY Pro; Checked Sheet No. Moats Remodel ENGINEERING De1B K'-L LIZ— E x15�1N6 Caa2A 6�� f\10 CHµJ IT, t� aQ n G[-is42nib n� ��'rv+6E pro F16 uNoflL �Msrwv CMJ. s1�e. nlrA7ily'I"�c` SN P,w:> �pJa.1 E{y51'LN (O bn S'r(NM OvE2 11V'v✓,bCt le 6" DEEP CoN �2N(, Ou$ (�O1ZN6. NF STua Conrf• (,37Zx16 pg.vf. Svc-K S-l. �C15 6 BEAD (ClQ.oPPED FxtS� 1 6 18 "t l8 D w N (� 2cf0 Flno2 tK15T'W (o T�s STS C� 16"o. c. Z`c101'C-/P x6 v2 (M jFi1.fie tb"o.�.-JLvs26 Mtn-Mc,e2 (Oa- Sznn") a{vH V F *, :a.' b�.gctCiwt6 wv� 9.51 DowN usE raSUN'g BAaE ywvm 5/8" g5 CJ" LoNb $IMP�ON Rrr TV QckQ BeLo�� A65-c ?-S Jni6RoJTED� F�u�- c^'"� uNOE2 fbs� P2to,(1 -tc, 'FNS CA.1.l Yf/ZOT.t, 5 '"""""..... Framing Sketch LFM ---------------- �q7.(J FLOJ(2. f �OVNPh?Z-J!� Dare 03/16/21 22024.01 ID E WAYNGara'a�r Moats Remodel cna�aa snaarao. EINEERING -Dare E x15�1N6 Caa2A 6�� f\10 CHµJ IT, t� aQ n G[-is42nib n� ��'rv+6E pro F16 uNoflL �Msrwv CMJ. s1�e. nlrA7ily'I"�c` SN P,w:> �pJa.1 E{y51'LN (O bn S'r(NM OvE2 11V'v✓,bCt le 6" DEEP CoN �2N(, Ou$ (�O1ZN6. NF STua Conrf• (,37Zx16 pg.vf. Svc-K S-l. �C15 6 BEAD (ClQ.oPPED FxtS� 1 6 18 "t l8 D w N (� 2cf0 Flno2 tK15T'W (o T�s STS C� 16"o. c. Z`c101'C-/P x6 v2 (M jFi1.fie tb"o.�.-JLvs26 Mtn-Mc,e2 (Oa- Sznn") a{vH V F *, :a.' b�.gctCiwt6 wv� 9.51 DowN usE raSUN'g BAaE ywvm 5/8" g5 CJ" LoNb $IMP�ON Rrr TV QckQ BeLo�� A65-c ?-S Jni6RoJTED� F�u�- c^'"� uNOE2 fbs� P2to,(1 -tc, 'FNS CA.1.l Yf/ZOT.t, 5 '"""""..... Framing Sketch LFM ---------------- �q7.(J FLOJ(2. f �OVNPh?Z-J!� Dare 03/16/21 22024.01 ID E WAYNGara'a�r Moats Remodel cna�aa snaarao. EINEERING -Dare '� rvy WaN. U2 5�¢qP ACq^SS Be�'Io.M of �,5 l�Q P1A-iJ //�`� VN�Q�U24'IN S'f¢J7S NEVJ 3FA,^ PE2 YLFFN F,00r 5E(,1�-Or) I i t I i 1t ' i i 2xL1 JCAC_c FA.51t£ &W,,,Enr. LNDof Bw/ A34 7- 3Fh y�uSl% -Toe P(AN1 i J �99Aj-\ ?CC- PLPI� A'5S ql- sib "� � 051 PE2 i7�1C1� END gCL�C�vV '�r�-rAZL Ex75'1 A6 Zxy RooF R4¢irc,2.S . CK1Si7-N6 Zxl- CCIUIZ'6 -3 S'5 wI LVS NA"6i-QeS ­6 NE Ol Sr A-,O Now �o scg�F. Description FZA-�-u�� SL(..ETC4F 6y LF^A Project No. r Date Z�r,%tl , 0� \2ooF 5E C11ov+1 3 -29 -ZoZ I DE WAY Project Checked Sheet No. Mo�,S Q�nnoaEl. ENGINEERING Date Sv.3 D61G J LOP,95 r �S PsF GEZLZNG 595E 20OF to p5F i2 IS PSF W A Ll5 `f p5F PSF (f x7L21o✓L I TNZ�a1a2) LS\jE rw:)<IL LIa c'sF Its CICS'9 tz-MG L4'r"A` Fv2c.E Q6:V5lZNG 5Y57liM 7N?PtCi • WV-'r-6wT i mu_ BE eEmoQca VJt7w fHE CkF"LMNrw/ � �+JD 'CH'E RAx D'LsP�vrt�L...t �.,i.� �E 5-rrFFwv� . P-e T� 7olfi -r-CRC, no f:Dei-t-c a"nwliS Ts acav-L `02 CNrz �KZSf2N6 llklE2At �¢uE (uSLS7ZNG SYS«.�� R OO;- NIOIC DvfL1-Nc> ovrz- S11-9tz vTSi� 5,";E Qcor 2A FlG,2.J o�v THE wFS7 57arz of -t�k£ M.xr,r, zaCvrcB"taaD 3fnAT�1, �rtzWrL.f. M.zID-SPar� v ND�Qy'�0�.'YtJ 5-ck.�zS N-A� gt✓�1 �Lrz,µ,ou� �¢- s'7vRN-sf. T4FE pWtuE2 C��Ntt✓tE� Zttf. SPM.r'c vnLL N.6 J aNl6E/t Be oSHZ 6w9- 5-T6CAW, vaJl �Pu¢LzW 5z2j75 5t AF L BF- "Pwc o wl ZXN HF Srvn ll�seu �ll ��-s-t Nall W E9,E TWfz VI-2£PLALC CAW VS Q.E,,Ouca A'( Flwz LEA7 f. Rrc PLPci, 3cIgj15 VJTN 2%b Vf 01 Z- "0 •L, 17c tt LW5L4 to CKu� N6 tLJs_ Fc"&S. IGEtM.oO GL. Ab'(� 51zst,wr.q FJJb'SNEE(LZIU(e LN," rLc[(.t os-%vEc,/ F2 woZv_ wJ--W%XwJ T kE 5 rtv 6 Naw�E, TuE Pzo fh� sE p RFAfL cwasnz a�J ., s r - _T,c Ve_A>_ Description - By Project No. I DE WAY ENGINEERING ZZo2y,o I Date 3-is z� Project M Q�Nto Checked Sheet No. 1pj Date � \IZ QaoF G,I\'� �� ��5P5F t ZSPSP 16' // * 12•C' w LiIZ6.6+,nL+ zll ESL ' t cc �7 •�. �zT-ST Z � 6 �F �Z �vEci�rrtE e f 6'r o . C �blfy =0•LI b= Ll2-q8 Z1 Zx L,33' LocSZo �(I.� FVoL6s Each szn� KZS I Ic QovG 2 n r-wo-S bF 6F.w w� o.\S\ c Z' y 51�4625 "�ISrSTQ.r,\-p LL-NGTH Ld' Z5asFrc� 2 +5.qlrL u>u. fj! Sltrnt , glk5L fit= 154WaL + A L R3- N6aT�t, + BifusL Nv vJ 3EA-O,\ W,+ w2 W M1Nr PoS� —LI= i0LlimL t 13o3 s x- fit= I-�'a9L+13�dcL ;.VSk qY'1 DF NZ - kZ+eN -bF Ct2 (d l6 o C A--4,0 U&fC v�in,o-sv�..t B¢.c-zNy �b IFb �- o.:A a = L /624 W1 030 ;# DL + (O 6 •" 5L1 yYr l� = 9�,5 FLFLL + �-WSL IC" IU' / I61, (.JZ- WI F-1/t X15 U-oF GLg l_ SE '�- j O=L��9Z �"-Jcf= O.y2 -�C/Oc o•14 Usk (2)?cLi -3T-V (HF) Fc 1FC(= 6-t Description ey Project Ne pp. Dare Z60z0 I DE WAY 315-70?7 Project Checked Sheet No. 1 oD L. ENGINEERING Date �PZ �p,l I aieo I 9NIN33NION3 ON laa4S PaN�a40 7340 �n }� SJ,ilO� Palad AVM(3aI (e'h 20� Zp2 �•� a�eo I.wJ7 •NccLi+„�iscvt. Ol 7Jotvd owL r,oCI—V�ol �-SQ:t aSQWO C+ Sx ow-) 1) :s 3JON C 5 x ib) -r.a to sdSN1 I - 3LVAv5g tl 9 �J- �N1 I SzX� 9L� !1 2! `I Glinz� L2oLYY� N �oo� = 1S#r to�1 + lalioCLLl -I- '� =a �2�) S Nmvw 7J3a(N0 qya I-vlaa-nyz ')"T-K2X3 rfa3 a9 < OS s („s +„bz r S 1)Z + (,s`o7 1 9y-nLd3a N'3iC IIIS ti2C2) Z1 _b3aq tZO7, S-J-ZMO10 LOVJ Wt.bb7, = 1S44 S0ahb9l �.C+21-'d4Nn�