Loading...
Roof Height Verification Letter 2023-01-27►"I GOLDSMITH LAND DEVELOPMENT SERVICES January 27, 2023 Lula Samuel 15827 70th Ave. W. Edmonds WA 98026 Re: Roof Height Verification Letter Dear Lula, On January 26th, 2023, a field crew from Goldsmith, under my direction, surveyed the as -built elevation of highest point on the roof of the house currently under construction at 15827 70th Ave. W. in Edmonds, Washington (Tax Parcel No. 00513100003716). Elevations are based on the published elevation of the sanitary sewer manhole rim in 70`h Avenue West, in front of the subject lot as shown on sheet A-1 for the approved design plans. Elevation = 342 feet. The average finished grade for the house as provided on said sheet A-1 is 363.35 feet. The highest measured roof peak elevation by survey is 387.97 feet. The difference between the highest peak elevation and the average finished grade is 24.62 feet which is below the maximum roof height by code of 25 feet. Because of the lack of documentation available defining the basis of the design elevation Goldsmith also established a new average finished grade following the same pattern and procedure shown on said sheet A- 1. Current ground elevations were collected at the envelope corners of the house. The average of the four elevations produced an average grade elevation of 363.34 feet confirming that the basis of the survey matched that of the design. Since ly, �1 Lee Nyquist, l Goldsmith Engineering Director of Survey 425.462.1080 Inyquist@goldsmithengineering.com 23007 Roof Height Verification Letter 2023-01-27.docx WA �ti. of �. \ • �e { z � o 8 8 Is Egli• L LA1�9� 11400 SE 811 St, Suite 450, Bellevue, WA 98004 PO Box 3565, Bellevue, WA 98009 T: 425.462.1080 1 F: 425.462.7719 www.goldsmithengineering.com