ENG2022-0523+Application_Instructions+10.22.2022_2.30.21_PM+3179908Application Type:Utilities
Project Type: Single Family Residential
Activity Type: New
Scope of Work: Side Sewer Connection
Based on your selections, the following information and requirements apply to your application.
Submittal Information
NEW SIDE SEWER CONNECTION
SUBMITTAL REQUIREMENT: Side Sewer application
Go to: Applications I Forms - City of Edmonds, WA (edmondswa.gov), the application will be listed within the Public Works - Engineering folder.
For properties in the Olympic View Water and Sewer District (OVWSD),please call 425-774-7769 for installation and permitting
requirements. If you are unsure who is the sewer provider for the property, check the city GIS Map. The sewer layer shows properties in
the OVWSD service area shaded gold.
Please Note: If proposing to connect to an existing lateral, the section of sewer between the property line and the public sewer
main, please call the city sewer division, 425-771-0235, to request an inspection to determine if the lateral is in adequate condition to reuse.
EDMONDS CITY CODE (ECC) 7.30.035 Water and sewer utility general facilities charges.
A general facilities charge (GFC) (formerly known as a "connection charge") shall be paid by each new customer connecting to the city's water or
sewer system in accordance with the following requirements:
A. Sewer System GFC. The sanitary sewer GFC shall be paid by the applicant at the time and according to the date of side sewer permit issuance in
an amount per equivalent residential unit (ERU) added as a result of the development as set forth in the table below; provided, that nonresidential
building permit and business license applicants shall pay sewer system GFC when the proposed structure and/or business activity would generate
additional probable sewer usage.
2012 before 2012 effective
effective date date forward 2013 2014 and beyond
Sewer GFC per ERU $730 $2,573.50 $3,495.25 $4,417.00
1. A single-family residential applicant shall pay a GFC equal to one ERU per dwelling unit.
2. A multifamily residential applicant shall pay a GFC equal to 0.67 ERU per dwelling unit.
3. Applicants for nonresidential development shall pay a GFC equal to the ERU determination that is made by the public works director. This
determination shall be made by estimating the probable sewer usage of the proposed development. In estimating the probable sewer usage, the
public works director may consider, among other factors, the average winter water consumption for similar existing development in the city. If the
applicant disagrees with the director's ERU determination, the applicant may submit additional information and analysis from a qualified engineer, with
an additional $200.00 review fee, in support of a request for an alternate ERU determination. The director shall review the request for an alternate
ERU determination and may accept the alternate calculation, revise the earlier ERU determination based on the new information, or uphold the
earlier
ERU determination. Once the director has made a final ERU determination, the applicant may pay the GFC under protest and appeal the
determination, along with the underlying permit, to the hearing examiner.
Required Supplementals
• Authorization and Acknowledgment - Utilities
View Supplementals
General Process Info
Application and Electronic Plans Submission Process
Once the application and plans are received, the engineering division will screen the submittal within two business days of receipt. There are
two possible outcomes for your application:
The submittal will be accepted, and an invoice will be sent to the applicant via email. Payment of submittal fees are due upon receipt of
the invoice.
The submittal will not be accepted, and an email will be sent to the applicant outlining what is required to complete the application. The
applicant will have 30 days to submit the requested documents through the MyBuildingPermit.com Plan Review Dashboard.
Re -submittals
• Include a response letter addressing each of the comments.
• Submit the revisions to Permit Processing, not the reviewer, through your MyBuiIdingPerm it.com Dashboard by clicking Submit Additional
Files.
• If the permit has not been issued, submit a full plan set.
Please direct any questions regarding application submittal to engineeringpermits@edmondswa.gov or contact the Engineering
Division at (425) 771-0220.
Please Note:
The property owner bears the responsibility for the accuracy and completeness of all information provided with or affecting the application submittal.
If the property contains or is adjacent to critical areas (streams and stream buffers, wetlands, floodplains, and geological hazard areas), additional
information may be required.