Loading...
REVIEWED-BLD2022-1081+Structural_Calculations+8.10.2022_7.05.40_PM+3044649RECEIVED Aug 16 2022 BLD2022-1081 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ............................................... REVIEWED BY CITY OF EDMONDS BUILDING DEPARTMENT Noorbakhsh Residence Addition Structural Calculations 7527 172nd Street S.W. Edmonds, WA 98026 Snohomish County Sidesway Project No. 20040.01 Prepared By: SIDESWAY ENGINEERING Noorbakhsh Residence Addition August 1, 2022 Project No. 20040.01 TABLE OF CONTENTS DESCRIPTION PAGE NO. Project Summary Gravity System Lateral System Design Loads 1.01 Roof & Floor Framing Design 1.02 - 1.09 Foundation Design 1.10 - 1.11 Seismic & Wind Loads 2.01 - 2.05 Lateral Load Distribution 2.06 Shear Wall Design 2.07 Diaphragm & Chord Analysis 2.08 20305 871h Avenue W. Edmonds, WA 98026 S, 5WAY (425) 673-4160 ENGINEERING Noorbakhsh Residence Addition August 1, 2022 Project No. 20040.01 Project Description Sidesway Engineering was retained by the homeowners to perform analysis and design as necessary to obtain a building permit for the proposed single story addition to the existing single-family residence located at 7527 172"d Street SW in Edmonds. The addition adds approximately 517ft2 of livable area over a new 130ft2 basement storage room and crawlspace at the southeast corner of the residence. A new deck will be added to the west side of the addition and the garage will be expanded to the north. The roof and floor systems will be conventionally wood framed with joists spanning between stud bearing walls and beams which stack down to both the existing and new foundation systems. The deck will be framed with joists spanning between a ledger alongside the addition and exterior beam lines. The lateral force resisting system consists of a sheathed roof diaphragm spanning to various wood stud shear walls around the perimeter. All existing framing and dimensions were provided to us from the 5ft2 Studio Architects plans and observations collected during a Sidesway site visit. Scope of Work Provide gravity and lateral calculations for the proposed addition as required to obtain a building permit. Provide structural framing plans and details as required for permit. Design Criteria 2018 International Building Code (IBC) 2018 International Existing Building Code (IEBC) ASCE 7-16 Minimum Design Loads for Buildings and Other Structures Applicable Material Reference Standards (ACI, AISC, NDS) This is a Risk Category II structure designed for the following loads: Dead Loads: 12psf (roof), 15psf (floor), 8psf (exterior/interior walls) Snow Load: 25psf Live Load: 40psf (floor), 60psf (Deck) Wind Load: 100mph, Exposure'B', KZT = 1.0 (refer to wind loads) Seismic Load: R = 6.5 (wood s.w.), Site Class D, SDC D (refer to seismic loads) Project Summary The proposed addition to the single-family residence as designed in the following calculations conforms to the 2018 IBC and IEBC. Refer to the calculations and the construction drawings for structural framing requirements. 20305 871h Avenue W. Edmonds, WA 98026 SIDE5WAY (425)673-4160 EhGINEERILG De5--c"3 LzpZ�3 W NWS `k Paf /-Psi (Erf. 1-Twi) �20OF Loo F1N (, (M,E,tAk At -A) IIZ" I•H reAo� co 3Lo Mcu4 It -Ec 1.5 -E NSOL 1. O MTsc. I. �5 Cti-sLZN G 2. ?- f i2P%-, J 'FL o0Z `AO cxF DFcu('O ?sF OvJ Z5p5F SOH- lg��M-IG I50O P5F (Assx) v-i:,) GOOF Roo t J-LODQ-LNG 3.0 3tii'SN�ar(Nu�16 Z• 5 �AR,nn-LN(o 3,0 PI\g.u+ 4L is . I M-SC 2. CMINIb SZ - z 15esF -(NV C-Lone- zS i3u7L7 ON -(A L�o�Unn rya UJa,u5 At zs No-c CdvSsDrcQ�D R SE19AAX ' STOC. ?Ee -ASCE, -f6,. Ni1GN� A3a� uescnption �o LFrn Hy Project No. .... SZ L Date ZZo` 0,0 -11-2oZZ IDE WAY Projea1N« Checked Sheet No. ENGINEERING Dd1e 1 01 Z0,1 9NI833NI9N3 AVM 3QI a.Ohclzzl alga ON 1060;d � .(g - u cb6/o=!� Zv -Q Zlnz CZ)-'� ,slg592+-"autzl Z�I 529.0 )(7st1 59L h, ap (is�"Sz 4 -)a Sa?d )a i UL/I sV hz._ 0)zr.01/,l 214 3Q ZIxZ 3Sr% Z S-2)3 Z +,a z 2 cU J° w�UcN S7litj vv=( �SJSdSZ+7QJfd21) =h 7 Z (a,+) 7?4'd3viJ a F+iss-+a=`,fdsaSZ+ xi -saZ�) -7Sao7.fi -s 141" Io2 -'-a �f9n•Cb >J Sz• f "•"'•�S �O i M E'��IgY Zh�Nrt+ y3q�t+ (L5� � 1/V'H3gc 1ks9�L1�S%IS - SSaZ� +-Sh/i : v (-) Wo 5-) -,4e 11 Z�i•a'{f��"�- h9'a=f�l'1 ,spho92f,ups5Z1`2b wrl �Jrnr Mn�p also 972(Z) <= ls�"dS25 + 'do gotZ ='Lf >�oa �hv"aj " M-a �aa 9fih s v,,.droa_ C,s �b5 z+ ,a if e2il * z,h1 =2M I z2j c ���b�91 w 7i£t•S p p s "' s, V-t-Z� r`�-VIasr=t z>� IWO Al qa =z� 0,'ha a zp --ICL ZI Z �s asp 1+f +7os+&t1 za �� �-is 45654 +,a 3saZ1) # hz = r 9 L SC`' T C7� ¢i Zx( WYtvl �L= ISRI�vL+ 2g6zus� . QL� ��pj {SDLt Ib lfl t#SL 90A- ✓\ ( S-raapF) - f-AST 5mfc- CL w• Ll'Ll 5.73'c• Ll 8,3V,i u LkG ?x'i cm�wry N Cl WARi 15 \ 3 *DL 4 28'�2-0's1 FZ --37 4 esl sL w= 13•Z° * �IZvrFoc+ZSvrft�� Z .'. U5E 3-1 CL r 13-TxF ;,(Z)Zx ",C- swD �PIFC'=o,43 V/ No fcrm/E G1= Ii•Zi Z * (17p,r DL i Z5P5rs L� t (is 3•'is .� �lZ FSF aL+ZSvSF SL� � S-vtt6�Fl Ow7rej 2 U3z p,L,(C�SS FVLLLGNWI-tCria'i 2A-F 7c4i' = 5_:31,f (IZIP5FDLf 2595f-y � Z - 201 k1DL +42o,ts( = S4y1264 r �nGtf2(SovtN SzoF�/ i Z /1 V kV DF CLg k6/4� j= 0.3b L,, <L�999 y-� UN�JER �lZ'1DbE 8�/Nv1 C� ec»F� knN(� twos-(� !s W IN'I'C, P = Z40y4lvL 4 SZSor SL 12i= u �4 sk��,433%451 &,Ecv- Ov-L- of - F-Lo aJ E V-riNt, .olv. N( 2.,•. G4G 1 � ?L •eyl = 1 la P5� % 5.3 TrczB uNFaLt� 7 3 (o—+ Nr (.,Li6t8LE l_ Fog "PNN w& tc . f�(B�'H-t Y.k-(, pb. cZi ZK F,i L. 4-1 PF a I � lk;l 0 4S Oescopoon 112S�1i-I� n�bb'-rang#16PsFt.�2^�" l = 0 (A AC By ' r I Project No. L I ZZo�o,o 1 IDE WAY ENGINEERING Project m 31�-A*A (�Jt>�irt of t=Z2.EPl,kC€ FM.(PIAIk rj tLl 2.4um4- QI 2z Qlc (01 1,"L+I;VO*L N65 avL + I146 x5L M-10 (t)ZxN ly c, �c��to.$5 CcV=a2o W\ _ �1.5Z if (\ZeSc DL + SS v5F5 L l = E1'ti-t Qa0F NW ArF"tQS- ?_ 95•SF2 A CZpSFDL +Z5 iEXiS( e.OF 3E,4,, Z wZ= 131 * (CZvv-- + Z5 vSFSL� _ rcrosT ¢,�w e*p-rre5 z :. L\XIp pF KZ iulYtt=D.L`� `°�fv�0.3i ULLk ��2 L Zy,b`�Gl w`�� s rZeK DLfi Z d = Ly4 eZ_ I�a�6#�DL.r3l88xsl �\ oS� 9 33 161 %.r it%>� 13�88 Vkri L w= V1 ,f O-Z sFSL+2S115F5L) CL 77 fir. tt9L -I 6l VTL .. 3 1I7_-X '15-.-zpr L'9 ,.... Z = I 'WA- +2Z5� AS I-o oop 7 v5f GCB 533 a Llll < V V,5� 11; mew -r, I n rr� 41��0,3L CYIk<-c G Mz. rr, st" b = L/ Q 5� uescription By Pro ect No. .... Date Z7--1D,- I (,-ly jazz I DE W�AY Project Checked Sheet No. ENGINEERING K Date blot{ �Q.�aAsrs6 (e- v- LEvF(-)1 7SE 2wr 2wF li NE�v S�UTtaEptgT������ Q, RZ c� ei LC eN Q,= S1 COL+ 1\�io$SL 3: 210 NVL+ S S 3 SSE (zyv;l (7 Fr- t,� V �,bClc� e � = 99 k9 Li z6 6 a sz �c R� 2 = 209u•flL+ Ng7 t: SL IZZ ` (z t (.i = 3•1IcL * (\2PSF DL4 25Ptf JL, �'tt-t of {JE,.v, RooF 5T1='IS i ', Z%IZ Tr :.-z e Z4 "o .r. �; k' �7asF +2SPrFs-L� ? = 2OAt�L +553 H sL ZX12 pGaZ Q 2V'`a•e. SrnLL A-rrQLlRE 4%6=0.65 b L/qn 11_ W i �IZO)FbL+2$FSf5L� 3' Ict Iz" zL 4aefr-•^ �,wea�t 0•40 �- 4as.9-3- lolPDLizlosL Qi- 18a) a s6*3 L ( F�rvE roc ou14U2 QpOF Description By L�Nn Project No. S� 2oU1G Date/ It{-ZJZZ ZZb LJOL0 IDE WAY P`Olect Noo2eA�N5+1 n �£SSDca.X� Checked Sheet No. ENGINEERING Dare �*-ts 6 I oUcvu&-'C2 5'Joa-au u�c�fi61oIA>L+210arc�= �6aroL+ 15fg.a(fsL R1= 313+sn-r b51#su 1-oFY+�f Yz -fir 'fog-(w� Ens¢. •^'��5ravv J' 2'� l Z \'S �4 D L t 651 r ly2 c Hos Df-#I a, at e,= le-7 I x.Z _ 513:0P L + (o514'-n -v fxa s l �F.0 �C ffCl _N ) NvQ. U N2 ILYrJ6 Q+h"� y1LL iz OZ ' 534 Aiv L-t-4,o4 #-5L Z' 6 5-r-m CA, BV (3) 5'7ubS AT cuZZ uCPS W= x 6 is ope 5L) 12" 6%CADL+ r4o7,V+st 'ki$ l}G1k2 Kc II'n hbl��,06 b L(949 C- ""-,-16 or LEv6c Lrl A C- f—' Date 6-16-70Z 22h`(0 O I DE WAY Project Checked Sheer No. 1Vo0R QPkFLS QEE3Yn1 , ENGINEERING Dere I, o( 40wz L-CCLAa L.) \ of 0"l E : 5M S H'I I,06 K.K f-f+4-4,L A*n+C BEfNtii �ES�f Ae� Fuca Zxb �Ew*� 0zs2S C6CAC a,J/%C" /'OZ w,a, LlAL) 'c c 12(_ Vf NWPO239ALl. Qz =a-t SokyN F1.C9(L2 S,,tsYs E-IS I w B�Ju tC) � (21 _ q 1 Wvl +Z 43u 5o'Jum-kw 3=-L s-ls p 8�u, o g�cL O Qi: jr6 'iC txb , z� �T,�t _zz Ssw Rz- 2oswvL+5474-A3L Q3,2, -cqp 4-De L � / (s tscuc� S abw Roob�� 4�1 el 47t1'mL+177 ttU Ct =e1 9.s' d 01.51 cL p 1631vv IL Q7_=3g6S PL41ST4k"4443gnsL cjv QJ5Psf + Llop;r- 12,• 2x6 DF A2 E 11 `.•c. �L(�! o,�l a=�/sss Zx src @ Ib"o't, Z(rg /co.31 0zLM9 W - 16., rF (15F5F v t + qo Fs ) 12" ... Zxlo bF e-Z @ 16"0•[. r„v`- 8.51 * (ISpSFOL+ yovsF u) cj = 91+` 13r5fDL vg vF tk2 -�-kC0,311 .,i/,v o,2S p z Lhq; = tw owtc2 Q+•'obL UN(Sw ¢ayc� kxJbRg� _ ZsyNr�o� 14339 qSL i w' :6� x (ISvr�-OL+ 6OnF«) = mot z u7„c �•"Lr . (1$PSF DL+ �ioPSE[L� _ kus2 Z w3= q' f6vsf�L G of Gus 4/f,7, i v,39 6- `(5z9 BY Lfw1 ZZo40 .o) IDE WAY ENGINEERING la s� w� l� b+cg� ¢ytl}�owc� Q-(� T`itDL 4294eLL �1 6V,4L i t"t3 1* LL_ GRN f"LLia��a F��2 7�-r s� S � La (G = Zl1 avL.l 591 � LL Ob•t = fD L + Sao L-LL EGG 5-T&i Z 5-rezN w4 5Lnis 131C� *"bct 2, QZ ei ISo qDL+emu etL1 I2L = 136 koL+5 So ttLL �ye� p1 31LL'� 1 ,5/CL. RI = 6x Rt..µn.Jb4t �1. 5?A'ADL 4 1ez(.* v. K1--33WDL4ZCf4LC L+' -3H�i F,<A�Fa lfaff4-1 (ISPsFmL + BO P5F LL.) =DEAL (2" 16;, O.C. ��(til_o 3b L1 Ll/4a9 Ly %elf cv* =411Z ie LPiPSF= 43aDL l2✓ ! (AN'1• PT Z)clo R+F447 rLo.c. 4L b e L,/vce Lj - (,O175F«) z • U% 91 14 Xq o Hf rtz 5''r/Zz"v6fe �°%iro.CS N =yYw ot1=43mDu—e-t4 + 6 Fz c 13((B��ttDlt $'Sod- LL. = 5-rhuL.\sTa �rrc w\ - O f (15PSF DL--F 60P FU-f CJ7, 6" >K /ISvSFmLfW5f LL) rz• � FT ✓lo N / /_ o B6 () 4 c L�799 Q c ZLAeq � F1�C/DFCLC cuyum, ^1N r y oy rro�ecuvo. Date IDE WAY 6k -zazz Project ^ r�-g��� ��AD�'/ Checked Sheet N,po, ENGINEERING V x L� Dare I,O0) emu. e-cr" P R,=6x QZc 6x �1ER.4+YL. `C1= '10CIOL I ZA(4A L. ¢z= 031 JyL +lzLu WLL 'PV-� cLC 6&Am (%+3-r) jLL v LL-c= 6r VIZ 2,9O&PL+ II6ZiYLL (RL =2-9NDL+ 111'1k -- 1�fk f3£AII (n-I-;= LC ) Wi iZt 29gWDL41("f+tC irk.,-7.4 6 Kootz 'peu-7-1111" (-/ ?k= 57kAVL+ IgZCirLI= SYA j 3kyl .0-- Z, Ks (Zo av L + PLGDL.L 4- 443 P(F LL 6)m7 of K--z �,`� I�l�" 3p d Z-L/q m 9'-T. L �(Zp+J�DL f 1lotiEk �t-53N# Fscr � 7.'.PI cvC NFts2 p..7 Ifc n,51 L + 60 PSFCC) L .PI �x12 wF.0z-ZJF,'�- o.(SI d=Ll96L/ 51-440L+ 73T4t�=L = 288L( # FArracw LUi- 6,51 1F ((5w PLrt 40KFCL z P1 6' zRIF�nZ --Jr, i=o.a9 n=L/ 5."5 r elFft-1 urvocf- c4-e-�c wk L w,kL�z*LJ3 �11 S.SS'CI QL �=y�SttoLiLl46aLc+ 1t,ewSL L.1(r 74`2F �IZ*sfcL+ZSPSFs�) _P,.aoF LJ3` 12 (b9evL,4- 185+ru) = SZpv P� + 139pirtL 116 Llein �•6C•r BCtw-S uwtgr'E CON-, 7vc-4'rs w bu y (Zo5411IL4 54-,-W5L) \5q"pU 4- yF (o PtL-( ixp 3. az 5�V#vLtl4-*iw.cL Description By L.F� Project No. �(GvMshf (m C�r,�L) Darer _1�-Z 2Zo40, 0� IDE WAY Project n 0��gau 1, � � Checked Sheet No. ENGINEERING V *J� Date �t6 14T I % �F ice= l`I5Z 7 Isaovs� ` o. �a �, eEa� use �'-6 X �Z'D�EP A w> % -0>1ct[ P= l(Al It -7use- Spr-f AS pgac M7vv-c 1rcS4 pact P 5S 1 tt 7 sit s Sw 5ra Qa� =Cs�aO V7- 3wkto L417aa*LL = ISWRq r7 As w„✓ r IZ"DEEP —/(3),r h wM b 0.% RO-1,4L 7- cs.Arrrrµ YxN i Z TV 7 Zo2 PAD 1� swr 1,0� 1,.666Fr �z = 43564 7 u5E z'iF B '6CCE F74 11(3)'WN FIA,,,," &WUL NIC(A coo+ nicQuws NG .. _ '816we x lb', N`Lof �} r T"S(L,UCC3 `MnY = 346S+�DL+I@36Ftui 4339asL = 5N, I�o�-�1L�-ea a �.�N�q UNOE¢ Fe- q. S Wplz eKN d-z _ $o9b �t �.c7�rz � (D + o s (L+S7 6 QD_ 49t, 6awa,,, c 5•S �+ Z(I 5"+ 60 t,+ e "� - J44- 5 % 6CCa'p a bxlo g"Div? -}' W� = zObV Pi,F h Z� # (12DL 5+yFiZ.s PSKL' �Qa�, Z4PLf'DL 4-' CJ PLELL+- 5I0T&';L 6•}5 IF ISPr'F +6O(-'"u = DEuc g 1 Ftf nL + 263 p Fa � _ 1142afoL +3L:Jp�fLL+ 50oL`5L r�ij (ISf D�+l(OP56w) = FwurL bl, W ID + 1Ly e)r U P�r— 1 4L � M-Q/ai{ (Br*lb`*%il *15oaF_ 1"ql 9�at ..y'aw,,, 7 wr„atc uescnpnen Hr Project No. iq�� 5 IDE WAY Project �I y Checked Sheet No. ENGINEERING �l Date 00 I-L>-,SZGn.J1 SLRB ADTArcWl -7e 11v� G�m,v,� _ $BTU rGA�'� t%c�Q_ "To'IR'�S �SHT (•a�-) = I Z ` ,�c. �4I H'D1, + 24 W i.l _ (,6 TkFflL_+ I ®ZRF cL 1i ILr, ZSO PLC �A�rl-ED Og��'` V-1C. ClA� Wwt C � t1S5�'an� 8tt BtG (5b O P5V= k- 8 rt 12 = I W o PLF 1 y4 �2 14-lutcNe L) SVe3 hDEo.�h-r< sfAzvz Description By Project No. Date I D E WAY j4 Zz Project Checketl Sheet No. vc5I26I�llksp� ` l' ENGINEERING Date Wind Analysis (Kzt) IDE 5WAY ENGINEERING / n. 1"}OOI FRa.n. V,I azEQ (7 l5`�r SJeF4tE Y) 7 ' SJIQFPC€ B 5S-(F� 260 YS 1-1h,= 0,064 o•Z Elevation Slope Mn a' A, 2IT Mar 4W m 45P .. 'elemfion Slope Mn O An ]31' Max 511' N59 reamwai�� n�..wo-lmur� Aspect Tree Cover , 5° 0 A • L W W. }>` LanJ Cover M Oavebpee Sow ■ wsue 3m ■ FuaM rib fg g� Y96 .10,wS k Aspect Tree Cover Lend Cover Mn 0° L Water T_ Epos, p A,5° I% Mer 30' ■ Fw 6% n. � Barton 3% I k��+ �•� CKQ�SJJ2-� \� (IRfC'L, ALL ACoJVJC7) Wind Analysis (Kzt) Noorbakhsh Residence LFM 6/9/2022 22040.01 Sheet No. Wind Analysis Wind Parameters: Risk Category: _ Exposure Category: = g Height Adjustment Factor (A): = 1.0 Topographic Factor (Kzt): = 1,0 See Kzt figures. Least Horizontal Dimension(x): = yg.S feet Mean Roof Height (h): = t t ,5 feet Basic Wind Speed (V): = loO mph, ASCE 7 Hazard Tool 2a Calculation: 0.1 * x = feet �0.4*h = yob feet C---o min = '-A-i feet a(checked) _ �-q feet 2a = 61 feet Wind Areas and Loads o Roof Factored ASCE 7-16 Ps30 Values, 100mph2A :12, (psf) Ps30 A= i ? . -{ Ps30 B= o Ps30 C= `1 Ps30 D= o Roof Wind Areas (ftA2) A= o`S B= 36� C= D= 3"4 .g Roof Wind Area Loads (#) PS30 A* A= 18I O Ps30 B* B= o Ps30 C * C= I1�yS 1 Ps30 D * D= b F (Roof)= OQ I # 5,'"DE5WAY ENGINEERING — 2a —" Check not less than max... 50.04 * x = 1 =1 feet (( 3 Feet = 3, 0 feet Mov max = 3.� feet ASD ASD 1546 # Fmin (Roof)= q8;0 # f D'b = Z9 Z # Gov£G�S 6y Project No, Wind Analysis LFM - - - — Dero 6/10/2022 22040.01 Noorbakhsh Residence cn.dwd Sheet No, Dam 2.02 Wind Analysis Wind Parameters: Risk Category: _ Exposure Category: _ Height Adjustment Factor (A): _ Topographic Factor (Kzt): _ Least Horizontal Dimension(x): _ Mean Roof Height (h): _ Basic Wind Speed (V): _ gis.�limiiiellllsls 7A 2a Calculation: 0.1 * x = H `i feet 0.4 * h = a, b feet min = 4 � feet 6 i.o I,0 See Kzt figures. H3 -5 feet 11,5 feet 10,0 mph, ASCE 7 Hazard Tool C.4 Wil a(checked) = 9 q feet 2a = 8::� feet Areas and Loads Roof ^� Factored ASCE 7-16 Ps30 Values, ^512, (psf) Ps30 A= 13 • y Ps30 B= Ps30 C= 9 .O Ps30 D= o Roof Wind Areas (ftA2) A= 53-Z B= C= D= O Roof Wind Area Loads (#) Ps30 A * A= losq Ps30 B * B= o Ps30 C * C= 665q Ps30 D * D= o F(Roof)= -4'}Ib # ASD y�z9 # OND Check not less than max... 0.04 * x = I feet 3 Feet = 3 ° feet max = 3 feet Fmin (Roof)= 22u S # —7 T_eP o•' Lor+wh� b[ $TF�c1..Kt' ASD `i944 # 6ovb;¢rJ S ..... . Wind Analysis LFM - - - _ _....-- - an - 6/10/2022 22040.01 5IDE5WAY ROM Noorbakhsh Residence Ch""`a sh"l W. ENGINEERING 2.03 ASCE ASCE 7 Hazards Report RMLN.W SOCIM U CNIL MINOS Address: Standard: ASCE/SEI 7-16 Elevation: 261.84 ft (NAVD 88) 7527 172nd St SW Risk Category: II Latitude: 47.843318 Edmonds, Washington Soil Class: D - Default (see Longitude:-122.334163 98026 Section 11.4.3) Seismic Site Soil Class: D - Default (see Section 11.4.3) Results: Ss : 1,316 SDI N/A S, 0.467 TL 6 F, 1.2 PGA: 0.565 F, N/A PGA 1, : 0.677 SMs 1.579 FPGA 1.2 SN„ N/A Ia 1 Sos 1,052 C 1.363 Ground motion hazard analysis may be required. See ASCE/SEI 7-16 Section 11.4.8. Data Accessed: Thu Jun 09 2022 Date Source: USGS Seismic Desian Maps °e�`P"°° ASCE 7 Hazard Tool Design Values BY LFM Projwt No. Date 06/09/22 22040.01 5 I D ESWAY Ptojx Noorbakhsh Residence Chft*e" � NO ENGINEERING Date 7°rI MSFRS Seismic Loads Parameters: Latitude/Longitude = 47.843318,-122.334163 Risk Category = II (ASCE 7-16, Table 1.5-1) Importance Factor, le = 1.00 (ASCE 7-16, Table 1.5-2) Soils Site Class = D (Per geotech, else per 11.4.3) SDs = 1.052 (SEAC) S, = 0.4678 F = 1.832 Sol = 0.5713 Seismic Design Category = D (ASCE 7-16, Table 11.6-1, -2) Building Properties: Response Moditication Coetricient, R = 6.5 (ASCE 7-16, Table 12.2-1) Overstrength Factor, no = 2.5 (ASCE 7-16, Table 12.2-1) Deflection Amplification Factor, Ca = 4.0 (ASCE 7-16, Table 12.2-1) Fundamental Period, T, = C1h " Ct = 0.02 (ASCE 7-16, = 0.122 x= 0.75 Table 12.8-2) k = 1 (ASCE 7-16, Section 12.8.3) 1.5*T, = 0.814648 (If 1.5Ts <Ta, see 11.4.8) Seismic Response Coefficient, C,: V = 0.044SDSI (Minimum) = 0.046 W V = (SDSIW)/R = 0.162 W GOVERNS V = (SD1I)/RT, (Maximum) = 0.718 W Distribution of Seismic Forces: Diaphragm DL Area WDL Story wjhjK wxhx K Force F. Sum Level (psf) (ft-) (kips) Ht. (ft) (k-ft) Ew,h;" (kips) F Roof Framing 16 3605 57.7 11.2 646 1.00 6.53 6.53 2nd Framing 0 0 0.0 0 0 0.00 0.00 6.53 Base Shear (ULT) _ Base Shear (ASD) _ Diaphragm Design Forces: E = 57.7 9.34 kips 6.53 kips 646 1.00 6.53 Diaphragm W, E W, Fj E F1 E Fi. WP. Fp, Min p(Max)Px Level (kips) (kips) (kips) (kips) E W, 0.2S sIwpu o.4spstwp= Govern Roof Framing 57.7 57.7 6.5 6.5 6.5 8.50 16.99 8.50 2nd Framing 0.0 57.7 0.0 6.5 0.0 0.00 0.00 0.00 ... Seismic Design Loads LFM DOW 6/10/2022 22040.01 5I DE 5WAY P, Noorbakhsh Residence chft*ad sh"tfp. ENGINEERING Date 2,05 LA IC�RL LOA& DSSf2Z8Ui1�1r) Fw�..fl = 2922 va A -- —7 0NW m Aoo-1-1'1�+ cc Fin -4V49vi 45.2 A w,tpl'l--4 �`wo cum p,VDVrWa ONE (J,iO C" fe(L D 21.2! i T "t4L A4-£A Z = 3b 0 $ Ft66��JJ LsNE,O L-iNE �'lgzo1!'Z G53oa= 2sazkea 151L,FiZ 653a'* = 2�96 E62 e6.N S 3105P' 7- = 3cosvrL ii x 242Z#= 59 4k Wrap n 29zz> = 86S wz D z N3.5' H3,si Oz 6yga" +f 653o es = 121Za 3�e5F'Z �vn.,,j� =u3• tizr24az,�=�461#Wv+�9 Z ueK ,p 5,DE5WAY Fkeat ENGINEERING Elcifil + kbbi�v.J 11/�ZZ�11 (N= C�tb in+� y LISA , L."1•ME a �0,s FZ �. LSyo rr= 147%l# ErR Go lza.-is 36.Sf Z F�acnrD _ 2b.-TS/z * wQ " = g6Zd 1.✓U•rD T3A5' L�nIE ®�� = I�lflF2 V. 653oer 3z04k" GaAAwS �05 F,z N949Itt� vwz Lateral Load Distribution By LFM Fmject No. Date 06/10/22 22040.01 Noorbakhsh Residence Z O to SN�iR-2 WM�I-S l Rscrc�-l�• L�Iy O=Z6b+1•I 1/ Z I6s =3B9 rF ib w� ne�F � � 3���F a 9.'��� Z.bc' _ O•yb� 2��(,9.3#vr�>� (2'x�sc•�)� = 4N55#Y -�o�,l = 43�5�4 WR��S• 2,bb'- o• ovrc¢ rturwr+�t 6 •. Ws reavF +Eq' — o.6 zk,-z' (8 9 �• = �,v 45g1+ r • do (•iO 5 rhJk 9 0Vu2-turzNSNC q'* 5�•`lar`A _ �ls4�kt � 5ook� NccLw�.a ••1`b ��S Rle�t� L7N� �JSw= 25.643.ZS - 21e1$5'' W—= illgf _y9P�F F� Swi 2£cn D ze.bs , C�Ar 29112n>•1N 6 ('�rZS' ✓M'�� 6C� = 4N I t 5'�0 is N Lzc�e� :. nlb "'S 04AR''D L9'* 144PAP — 0.46V ZZ-t do- C&W E` 9I t\13'* 12psFvL� = 1Z%uf — 116 �(k� Z L - 132H4 �S06N �yv E6l1L(zG},v yH�WR l ! 3e9 0.F :. ux SW3 (456a.F Ovti2'fueN�N 6 ; z ,� 4k -3 P F E a i•4' 0,6v 4.4 r (0.3,)t9o1c) + (I s�aFrz y.4 I — "5 or Z l�o� I I— ISbIF = 51310 �J0S -02- rA5160 slcm- S�FFPrIL wA-LS (0 < Lc�/rL. By LF,_l cxtZ 1270 Liao IDE WAY ENGINEERING rocpcf- 2.0-4 k SIMPSON X CALCULATION RESULTS Input Parameters REBAR DEVELOPMENT LENGTH CALCULATOR JULY 08, 2022 Concrete Concrete Compressive Rebr Reber Yeld Reber Spacing Minimum Cleo Seismic Design Aopticadon classSplice pees type Strength sim Strength Reber Cooling (Cemr-ta-Cemen Cover category fl�" M fv Prot) Sfin) C. on l.ep Splice pees A NWC 1 2.500 5 1 40 Uncoated / Zinc coated 18 3 C-F Excessive Relmorcemem -- s.n(lrlo) Ao,wm+aeelirl�l 0.31 0.31 Results Model No. Tension Development Length, ldt (in) Compression Development Length, Id, on) Drill BB Diameter, dh,te (in) SET-XPe 12.00 16.70 0.75 SET-3GTM 12.00 16.70 0.75 Notes 1. For SET-XF® the value off', used to calculate development lengths is limited to 2,5D0 psi when Seismic Design Category C-F is selected. 2. Adhesive installation instructions and parameters can be found at Anoll p Adhesives Technical and Installation Notes (hltQLdy ww.stronggg g&pmdumslanc igdng-systems/technical-notes/anchodtm-adhesives installabon-insbuct ons). Existing cast -in -place reinforcing bar - Existing concrete - New concrete Post -installed reinforcing bar Development length Lap Splice Application LIFO a-9-Zozz N00R8AVASA Z,oag 7��P6tKFlbN� k CGIofz9 171,4QNe.A Gvn I =7 b -o SQ,X k" �,J ALL COLL+ C."(@2_ V = 2-1 q G # EQ (tip= -2NLA = 31vkk -14' V Lk 6d � = 584acF C9.4'+2�60 m = ISZG�Z * 85ooq = y75og Faz c�J I97Y14 Z �2" looF S.r� rrN+�V vl8d e 6"A-Z, O.C. ) b 28s' = Z� Ibl3x co+p ' -�-/P Do�<3LE TAP Pur,�c A��uvert� —gvbv\ CS>Ll-EC.%a2 p1EE^y�� -( ' tom' LToP PLT USE MS'cT a ((y�C� ZDOO R� Vescoptton By Project Na —AP+4P -� i EioYZ.i L�lh ZZo-K�.ol Date IDE WAY Checked 2Ozz Protect Sheet No. No�2gAkHQ+ ENGINEERING Dare -Z,0`6