Loading...
DNS RESUB1 BLD2023-0028+COST BREAKDOWN+4.15.2023_1.55.17_PM+3485292pF ED,y Permit # Address:_8023 2151" PI W Edmonds, Wa 98020 Home Owner: Ian Joseph Contractor: Sequoia Construction & Consulting, LLC This form may be used to help establish the percentage of demolition work performed to an existing home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing home's replacement cost (50% in a flood zone), the structure will be required to be rebuilt to the standards of new construction. See ECDC 19.00.045 Replacement cost of existing home $ 748,800 How was the value determined? _$864,00 market value from 2022 for 1500sf. The residence is 1300sf with a 200sf out building. The value per sf was determined to be $576._ Component Value of Existing Component Percentage removed Replacement cost of removed component Notes Foundation $79112 0% $0 Floor Framing $38,217 0% $0 Floor Insulation $5778.83 0% $0 Wall Framing $50,077.09 57% $28,543.94 Wall Insulation $6566 100% $6566 Siding $56,000 100% $56,000 Roof Framing $54,000 100% $54,000 Roofing $22,000 100% $22,000 Attic Insulation $5560 100% $5560 Windows $38,000 100% $38,000 Doors $22,000 100% $22,000 Plumbing $45,786 70% $32,050.20 Electrical $52,758.92 75% $13,189.73 HVAC $48,434.40 50% $24,217.20 Drywall $28,000 100% $28,000 Cabinets $55,000 100% $55,000 Painting, Flooring and Finishes $105,000 100% $105,000 Other $36,509.76 100% $36,509.76 Debris clean up/disposal, miscellaneous labor, management and supervision, exterior concrete and mist grading/landscaping Total $748,800 $526,636.83 Percentage Removed (Total of Column 4 divided by Column 2) equals_70 % Permit # Owner Address:_8023 2151h PI W Edmonds, Wa 98020 Home Owner: Ian Joseph Contractor: Sequoia Construction & Consulting, LLC Date Contractor Date