Loading...
REVIEWED RESUB1 BLD2023-0168+75% FORM+8.16.2023_5.20.23_PM+3730667RESU B BLD2023-0168 Aug 17 2023 Permit # L_D 2-O23 pF F D,I, CITY OF EDMONDS O1, DEVELOPMENT SERVICES v DEPARTMENT n xy° Address: 14 t W , E S 00, Z� Home Owner: Contractor: ) This form may be used to help establish the percentage of demolition work performed to an existing home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing home's replacement cost (50% in a flood zone), the structure will be required to be rebuilt to the standards of new construction. See ECDC 19.00.045 Replacement cost of existing home $ If 1 3Q0 REVIEWED How was the value determined? -T^ ( re porgy f BY Component Value of Existing Component Percentage removed Replacement cost of removed component Notes Foundation 35 QW-c° 0 p Floor Framing `'- Floor Insulation z o - — fa0 ". Wall Framing OLD' Q p , E0110 Wall Insulation 00 i 571>q =" Siding °" lad7,V aao Roof Framing (00 °"' (Op Roofing too 2500au- Attic Insulation 10 aca " 143GO• Windows — " 0 DO14' Doors 1900:1uc m Plumbing :3000.", 300a— Electrical '°e loft 0001*0 HVAC O 2-5b0.00 Drywall O Q 1007 Cabinets 2500.' b ZSaO,°` Painting, Flooring and Finishes ®c ��,� 1007. o0 Other -00007 Total Percentage Removed (Total of Column 4 divided by Column 2) equals% Owner n Date Contractor -IP "ACA 0" ��,C L-c.'' Date (0c,106 202�