REVIEWED RESUB1 BLD2023-0168+75% FORM+8.16.2023_5.20.23_PM+3730667RESU B BLD2023-0168
Aug 17 2023
Permit # L_D 2-O23
pF F D,I, CITY OF EDMONDS
O1, DEVELOPMENT SERVICES
v DEPARTMENT
n
xy° Address: 14 t W , E S 00, Z�
Home Owner:
Contractor: )
This form may be used to help establish the percentage of demolition work performed to an existing
home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing
home's replacement cost (50% in a flood zone), the structure will be required to be rebuilt to the
standards of new construction. See ECDC 19.00.045
Replacement cost of existing home $ If 1 3Q0 REVIEWED
How was the value determined? -T^ ( re porgy f BY
Component
Value of
Existing
Component
Percentage
removed
Replacement
cost of removed
component
Notes
Foundation
35 QW-c°
0
p
Floor Framing
`'-
Floor Insulation
z o - —
fa0
".
Wall Framing
OLD'
Q p ,
E0110
Wall Insulation
00
i 571>q ="
Siding
°"
lad7,V
aao
Roof Framing
(00 °"'
(Op
Roofing
too
2500au-
Attic Insulation
10 aca
"
143GO•
Windows
—
"
0 DO14'
Doors
1900:1uc
m
Plumbing
:3000.",
300a—
Electrical
'°e
loft
0001*0
HVAC
O
2-5b0.00
Drywall
O Q
1007
Cabinets
2500.'
b
ZSaO,°`
Painting, Flooring
and Finishes
®c
��,�
1007.
o0
Other
-00007
Total
Percentage Removed (Total of Column 4 divided by Column 2) equals%
Owner n Date
Contractor -IP "ACA 0" ��,C L-c.'' Date (0c,106 202�