Loading...
REVIEWED BLD2023-0501+GEO REPORT+7.20.2023_7.21.57_AM+3678316■------- - - - - - - Reviewed by City of Edmonds ; Planning Division '--------------- ,.,.,.,.,. REVIEWED BY CITY OF EDMONDS BUILDING DEPARTMENT Win Group Northwest, Inc. July 19, 2023 Chris and Pauline Lane 16120 72nd Ave. W Edmonds, WA 98026 Email: twinpilot@gmail.com RECEIVED Jul 20 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Subject: Geotechnical Report 16120 — 72nd Avenue West Edmonds, Washington 98026 Geotechnical Engineers, Geologists & Environmental Specialists G-5936 BLD2023-0501 Ref: "Geologic Engineering Study, Sequoia Ridge Short Subdivision, Edmonds, Washington 98026, G-1061-1, GEO Group Northwest, Inc., February 29, 2000." "Plan Set, Addition and Alterations to Lane Residence, 16120 72nd Ave. W, Edmonds, WA 98026, Mike Shoffner Architect, May 2, 2023." "Critical Area Determination (CRA2023-0079), 16120 72nd Ave W, City of Edmonds Planning & Development Department, May 16, 2023." Dear Chris and Pauline, Based on our discussions with Mr. Shoffner and our review of the referenced critical area determination, we understand the City of Edmonds has requested an updated geotechnical report and critical areas report be provided for the project. In 2000, we prepared the referenced geotechnical report that included our evaluation of the mapped geologically hazardous areas at the project site, and have prepared an addendum letter to the referenced geotechnical report regarding the proposed addition and alterations to the existing residence at the subject property. This report includes our description of the site, evaluation of the mapped geologically hazardous areas at the project site, our geotechnical conclusions & our recommendations regarding the project. 13705 Bel -Red Road • Bellevue, Washington 98005 Phone 425/649-8757 • Fax 425/649-8758 July 19, 2023 G-5936 16120 — 72nd Ave W, Edmonds, WA Page 2 SITE CONDITIONS The project site (Parcel No. 00513100005204) is located in the Meadowdale neighborhood of Edmonds, Washington. The project site is approximately 37,897 square feet (0.87) in size, and approximately wedge shaped. The existing approximately 2200 square feet large two-story residence and detached garage were constructed in 2001 near the south-central limit of the site. Public utility improvements (sanitary sewer, stormwater) were also constructed during previous development of the project site. The project site is bounded by developed residential lots to the north, east & south, and is bounded by the Lorian Woods residential property to the west. The site is characterized by steeply sloping topography near the site's eastern and western limits, and relatively flatter topography near the site's south-central limit. The sloped area near the site's western limit slopes downwards to the west, and the sloped are near the site's eastern limit slopes downwards towards the northeast. The sloped area near the site's western limit has an average grade of approximately 100 percent (1H:IV), and an average vertical relief of approximately 80 feet at the project site. The sloped area extends downwards towards 73rd Place West, and has an average vertical relief of approximately 150 feet for the entire slope. The sloped area near the site's eastern limit has an average grade of approximately 50 percent (2H:1 V), and an average vertical relief of approximately 70 feet at the project site. The sloped area extends downwards towards North Meadowdale Road, and has an average vertical relief of approximately 85 feet for the entire slope. Sloped areas at the project site are generally undisturbed, and are heavily vegetated with shrubs, vines, grasses & deciduous trees. PROJECT DESCRIPTION Based on our review of the referenced plan set, we understand the proposed construction at the site consists of alterations and additions to the existing residence that includes replacement of the existing roof, repair of the existing main floor & upper floor decks, replacement of the existing concrete steps and landing area near the residence's front entry, and repair of the existing covered entry area. It is our understanding that the proposed lot coverage is approximately 32 square feet greater than the existing lot coverage, which includes the enlargement of an existing upper floor deck (approx. 11 SF) & the residence's roof (approx. 21 SF) near the south-central extent of the residence. It is our understanding that minimal exterior grading or earthwork is proposed, and five interior concrete footings are proposed near the center, and southern extent of the residence. GEO Group Northwest, Inc. July 19, 2023 G-5936 16120 — 72nd Ave W, Edmonds, WA Page 3 GEOLOGIC CONDITIONS According to published mapping of the project site and its vicinity (Geologic map of the Edmonds East and part of the Edmonds West quadrangles, Washington, Minard, 1983), the site is underlain by Quaternary age advance outwash deposits. Advance outwash deposits typically consist of sands and gravels deposited by meltwater streams during the advancement of the Puget glacial lobe into the region during the last glacial period, approximately 13,000 to 11,000 years ago. From our referenced geotechnical report, the site is located east of the Meadowdale Landslide Complex, which was mapped and characterized by Roger Lowe and Associates (RLA, 1979), GeoEngineers (GeoEngineers, 1985), and Landau Associates (Landau Associates, 2007). The Meadowdale Landslide complex is a large area of historical landsliding (slumps and debris flows) extending approximately 3,200 feet from north -to -south, and approximately 650 feet from east -to -west. The sloped area at the western limit of the project site is a portion of the eastern margin of the landslide complex, and is the headwall of the landslide zone. The initial movement is believed to have occurred approximately 7,000 years ago. Historic landsliding in the area has primarily occurred within an approximately 400 feet wide zone located immediately east of the Burlington Northern railroad tracks (approximately 800 feet west of the project site's western limit). The most recent movements in the landslide complex (in 1946-47, 1955-56, 1970-71, and 1996-97) have occurred in the central and western portions of the landslide complex, away from the project site. Based on the reported findings from our subsurface exploration performed at the site, the project site and existing residence are underlain by up to approximately 30 feet of dense to very dense brownish gray fine-grained sand, consistent with the published mapping of the site. Groundwater was not reportedly encountered in the boring during its advancement. A log of the soils reportedly encountered in the boring we completed at the site has been included in Appendix A — USCS Classification and Boring Log. The approximate location of the boring is illustrated on the attached Plate 1— Site Plan. GEOLOGICALLY HAZARDOUS AREAS IDENTIFICATION AND EVALUATION The City of Edmonds' definitions for geological hazard areas are provided in Edmonds' Community Development Code (ECDC) Chapter 23.80.020. It is our understanding that the existing residence is located in areas mapped by Edmonds as erosion and landslide hazard areas. An earth subsidence and landslide area is mapped near the project site's western limit. A map GEO Group Northwest, Inc. July 19, 2023 G-5936 16120 — 72nd Ave W, Edmonds, WA Page 4 illustrating locations of the mapped geological hazard areas, existing, and proposed site features are provided on Plate 2 — Geologic Hazard Map (ECDC 23.80.050). Erosion Hazard Area Approximately 30 percent of the project site is mapped as an erosion hazard area by the City of Edmonds. The existing residence is partially located within a mapped erosion hazard area. The proposed addition is located near the south-central extent of the residence, which is not mapped as an erosion hazard area by the city of Edmonds. Mapped erosion hazard areas at the project site extend onto the adjacent residential properties to the north, and east of the project site. According to the U.S. Department of Agriculture's Soil Conservation Service (SCS) soil survey, surficial soils at the project site consist of Alderwood gravelly sandy loam on 8 to 15 percent slopes and Alderwood-Everett gravelly sandy loam on 25 to 70 percent slopes. Surficial soils underlying the proposed project area at the project site (existing residence's footprint) consist of Alderwood gravelly sandy loam on 8 to 15 percent slopes. Each of these soil types have moderate to high erosion potential, according to the SCS soil survey. Alderwood soils have medium erosion potential and can be susceptible to sheet flow and rill erosion, if exposed. Per ECDC Chapter 23.80.020(A), areas with Alderwood soils on slopes of 15 percent or greater are identified as erosion hazard areas. Per this criterion, the proposed project area near the center of the site that underlies the existing residence is not an erosion hazard area. As such, we believe the potential for soil erosion has been minimized by the proposed project's design, as minimal work outside of the existing residence's footprint is proposed (replace existing concrete steps and landing area), and the proposed work would not result in increased impervious surface coverage. Landslide Hazard Area Approximately 60 percent of the project site is mapped as a landslide hazard area by the City of Edmonds. The areas at the project site that are mapped as landslide hazard areas include the steeply sloping topography near the site's eastern, and western limits, as well as landscaped areas near the site's north central limit. The north-eastern extent of the existing residence is located within a landslide hazard area, as mapped by the City of Edmonds. Proposed construction within this area consists of repairs to the existing residence's entry porch, concrete steps, and landing. Landslide hazard areas mapped at the project site extend onto the adjacent residential properties to the north, east, south, and west. The proposed enlarged deck addition near the residences south-central extent, is not located within a mapped landslide hazard area. GEO Group Northwest, Inc. July 19, 2023 G-5936 16120 — 72nd Ave W, Edmonds, WA Page 5 According to the geotechnical reports by RLA, GeoEngineers, and Landau Associates, the slope mapped as a landslide hazard area near the project site's western limit has a five (5) percent probability of failure within 25 years, and the slope mapped as a landslide hazard area near the project site's eastern limit has a two (2) percent probability of failure within 25 years. The criteria used in these reports for determining the landslide risk included steepeness of slope, height of slope, soil types, presence and evidence of previous landsliding, and the presence of groundwater seepage or springs. Previous studies of the mapped landslide hazard area determined the primary cause of sloughing and small slumps near the site's western limit have been caused primarily by erosion by groundwater springs and seepage. Based on the criteria described in ECDC 23.80.020(B), hillsides with a slope greater than 15 percent that have intersecting geologic contacts with a relatively permeable sediment (i.e., advance outwash) overlying a relatively impermeable sediment (i.e., glacial till), and springs or groundwater seepage are considered a landslide hazard area. Based on this criterion, the slope near the site's western limit is a landslide hazard area. Based on the referenced plan set, and available mapping of geologically hazardous areas at the project site by the City of Edmonds, the western extent of the existing residence is located approximately 35 feet from the mapped landslide hazard area (approximately 50 feet from the earth subsidence and landslide area), and the proposed deck addition is approximately 60 feet from the mapped landslide hazard area (approximately 75 feet from the earth subsidence and landslide area) located near the site's western limit. Per our referenced geotechnical report, our recommended building setback of 50 feet from the top of the slope for the project site was previously approved by the City of Edmonds. The proposed addition and alterations incorporate this setback in their design as well. Our previously prepared "Geotechnical Declaration and Statement of Risk" dated December 20, 2000 for the project site included tabulated numerical factors of safety for shallow sloughing and deep failures for the slope near the site's western limit. The slope stability calculations analyzed the factors of safety for the west facing slope against deep seated slides and shallow sloughing. Based on our previous analysis, the west facing slope had a factor of safety of 1.1 against shallow sloughing, indicating that some shallow sloughing was anticipated over time. The west facing slope had a calculated factor of safety of 1.8 against deep seated slides, indicating a low probability of deep-seated slope failure that would affect the existing residence. As minimal ground disturbance is proposed for the project, we believe the previous analysis is sufficient for GEO Group Northwest, Inc. July 19, 2023 16120 — 72nd Ave W, Edmonds, WA G-5936 Page 6 characterizing the probability for shallow sloughing and deep-seated slope failures at the mapped earth subsidence and landslide area near the site's western limit. Due to the minimal work proposed outside of the existing residence's footprint, and the incorporation of our building setback recommendations in the project's design, It is our opinion that the proposed addition and alterations to the existing residence can be completed as proposed without increasing surface water discharge or sedimentation to adjacent properties beyond existing conditions, without decreasing slope stability on adjacent properties, and without adversely impacting other critical areas, so long that our geotechnical recommendations have been incorporated in the project's final design (ECDC 23.80.070). Hazard Mitigation Statement Per the requirements described in ECDC Chapters 23.80 and 29.10, we recommend the following measures be incorporated during construction to reduce hazards and mitigate impacts at the project site: - No ground disturbance outside of the residence's footprint should occur during Edmond's seasonal grading restriction (October 1st to May 1') - Although no areas are proposed for the project, areas of ground disturbance outside of the residence's footprint that will not to be covered with impervious surfaces upon completion of the project should be amended with topsoil (6" min. thickness) and planted with non-invasive plant or shrub species. SITE SEISMIC DESIGN CLASSIFICATION AND EVALUATION Per the procedures specified in ASCE Standard 7-16, the project site can be assigned a seismic design classification as Site Class C (Very Dense Soil Profile). This conclusion is based on review of the geologic mapping of the site vicinity, the reported conditions encountered in the boring drilled on the site, and our understanding and interpretation of deeper subsurface condition at the site. Seismic design parameters applicable for the site are as follows: Ss = 1.326g SMs = 1.591g SDs = 1.06g Si = 0.47lg SMi = 0.707g SDI = 0.47lg The peak ground acceleration for the site, adjusted for the assigned site class, is 0.684g per current seismic hazard design mapping and calculations conforming to ASCE Standard 7-16. GEO Group Northwest, Inc. July 19, 2023 G-5936 16120 — 72nd Ave W, Edmonds, WA Page 7 CONCLUSIONS AND RECOMMENDATIONS It is our professional opinion that the site is geotechnically suitable for the existing residence's proposed addition and alterations without increasing the risk of soil instability at the project site or adjacent properties. Based on the reported results of our subsurface investigation, the property is underlain with dense to very dense, native advance outwash deposits that are consistent with available geologic mapping of the vicinity. These competent soils were previously anticipated below depths of approximately 3.0 feet below ground surface at the existing residence, and their presence was verified during previous geotechnical inspections during construction of the existing residence. Details of our recommendations regarding the geotechnical aspects of the proposed addition and alterations are described in the following sections of this report. Subgrade Preparation Soils in areas to receive concrete slabs should be prepared to a firm, unyielding condition. The prepared subgrade should be observed and approved by the geotechnical engineer. Any detected soft spots or disturbed areas should be excavated and replaced with a clean crushed rock (minimum 1/4" clast size, maximum 1 1/4" clast size) as directed by the geotechnical engineer. Interior Concrete Foundations Soils that are acceptable for building support are anticipated to be encountered at depths of approximately 3.0 feet below the ground surface at the existing residence, as reported in the attached Appendix B — Geotechnical Field Inspections. If soft soils are encountered following the excavations to the foundation elevations, we recommend over excavating locations where soft soils are present and replacing these soils with clean crushed rock, which can adequately support interior concrete foundations. Interior Spread Footings Interior spread footings should bear directly on undisturbed, dense to very dense native soils or on clean crushed rock that has been placed on a dense or very dense native soil subgrade. Our recommended design criteria for interior spread footings constructed on native soils or clean crushed rock are provided below: - Allowable bearing pressure, including all dead and live loads: Undisturbed, dense native soil = 2,000 psf Crushed rock placed on dense native soil = 2,000 psf GEO Group Northwest, Inc. July 19, 2023 G-5936 16120 — 72nd Ave W, Edmonds, WA Page 8 - Minimum depth to bottom of interior footings below top of floor slab = 12 inches - Minimum lateral dimension of column footings = 24 inches - Estimated post -construction settlement = %2 inch - Estimated post -construction differential settlement across building width = %2 inch A one-third increase in the above allowable bearing pressures can be used when considering short-term transitory wind or seismic loads. Lateral loads against the building foundations can be resisted by friction between the foundation and the supporting compacted fill subgrade or by passive earth pressure acting on the buried portions of the foundations. For the latter case, the foundations must be poured "neat" against the existing undisturbed soil or be backfilled with compacted structural fill. Our recommended parameters are as follows: - Passive Pressure (Lateral Resistance) 350 pcf, equivalent fluid weight, for structural fill or competent undisturbed native soil - Coefficient of Friction (Friction Factor) 0.35 for structural fill or competent undisturbed native soil We recommend that GEO Group Northwest, Inc. be retained to observe excavations for the residence's interior footings prior to installation of the footings to verify whether subgrade soils will be able to support the design allowable soil bearing capacity, and that construction of the interior footings conforms with the recommendations presented in this report. Soil bearing verification may also be required by the City of Edmonds. Exterior Slabs -on -Grade Exterior slabs -on -grade should be constructed on a firm, unyielding subgrade. During preparation of the slab subgrade, any areas of the subgrade that have been disturbed by construction activity should be either re -compacted or excavated and replace with clean crushed rock. To avoid build-up of moisture on the subgrade, concrete slabs should be placed on a capillary break, which is in turn placed on the prepared subgrade. The capillary break should consist of a layer at GEO Group Northwest, Inc. July 19, 2023 G-5936 16120 — 72nd Ave W, Edmonds, WA Page 9 least six (6) inches thick, of free -draining crushed rock or gravel containing no more than five (5) percent material passing a No. 4 sieve. Site Drainage The finished ground at the site should be graded such that surface water is directed off the site. Water should not be allowed to stand in any area where concrete footings or slabs are to be constructed. During construction, loose surfaces should be sealed at night by compacting the surface to reduce the potential for moisture infiltration in the soils. Under no circumstances should roof downspout drain lines be connected to the footing drainage system. All roof downspouts must be separately tightlined to discharge into the approved storm water collection system. LIMITATIONS This report has been prepared for the specific application to this site for the exclusive use of Chris and Pauline Lane, and their authorized representatives. Reliance on this report by other parties is solely at their own risk. We recommend that this report be included in its entirety in the project contract documents for reference during construction. The findings and recommendations stated herein are based on field observations, our experience on similar projects and our professional judgment. The recommendations presented herein are our professional opinions derived in a manner consistent with the level of care and skill ordinarily exercised by other members of the profession currently practicing under similar conditions in this area and within the project schedule and budget constraints. No warranty is expressed or implied. In the event that site conditions are found to differ from those described in the referenced geotechnical report, we should be notified so that the relevant recommendations in this report can be reevaluated and modified if appropriate. CLOSING We appreciate the opportunity to provide you with geotechnical engineering services for this project. Please do not hesitate to contact us if you have any questions regarding this report. Sincerely, GEO Group Northwest, Inc. GEO Group Northwest, Inc. July 19, 2023 G-5936 16120 — 72nd Ave W, Edmonds, WA Page 10 41 jn)-�4 Andrew Hoff, G.I.T. Staff Engineering Geologist Attachments: Plate I — Site Plan Dated: 7/ 19/23 William Chang, P.E. Principal Engineer Plate 2 — Geologic Hazard Map Appendix A - USCS Soil Classification and Boring Log Appendix B Geotechnical Field Inspections GEO Group Northwest, Inc. Pl 1005 Pt 122.07 — PROPOSED EXISTING UPPER ------___ FLOOR DECK ——� PROP' SED.REPAIROFEX(STING CONVERTED TO f�'�~ SSUAMyOLE--------- �____ MAIN FLOOR UNCOVERED CONDfM0VED OgBR DATUM POINT — — — — WOOD DECK - 84 SF SPACE - PL EL = 279.5' 90 SF f N- PROPOSED NEW ROOF OVERHANGS TO _ r / \_! __ MATCHEX(STING, r / CATCHBASAV TYPICAL �. / 78 CATUMPOYN7 PROPOSED REPAIR OF T 3 `, EL = 288.0 EXISTING UPPER FLOOR —� r-- --_ WPDECK -300SF ` 18' OVERHANGSEXISTAYG, TYPICAL - -- p Sri = PROPOSED STANCAVG SEAM B METAL ROOFING THROUGHOUT +282-OX PROPOSEDREPAROFSOST(MGMAIN ❑ �- FLOOR COVERED WOOD ENTRY PORCH - 97 SF SSE YAfLS L — — \ PROPOSED CONCRETE STEPS 6 LAND(NG moo, Pi70 S :.� ........... , I ❑ TO REPLACE EX(S71NG - 49 SF EDGE OF NEW ROOF {-Y2 G'.'::.'. g E TO MATCH �......... X(S'(HC 4 ' _ o b EDGE Of _ ❑ MAIN FLR E-E': ❑� o_pp'pER - _ - — — — — �.. DROPC0 ^, ~ FLOOR DECK 3v.;* cYSTIN ROOFS B-I ` 25 BIB i. REMOVED I LINE OF EXISTING ROOFREMOVED \ y .'.'..'... '.•: . •:.''. i �_— :.::': PROPOSED ! r:..:: - ; y REPAIR \`:. \ EX(ST(MGWP \.:.::... EX!S T 1.VG CONCRETE ROOF DECK -29SC' PATIO ON GRADE � +308.4 PROPOSED NEW ROOF STRUCTURE , -306.9 TO REPLACE EJ((S7LNG -1124 SF \r Rt?OF \ EXISTING GARAGE PROPOSED ENLARGE& REPAIREXISTiNG Q \ UPPER FLOOR WP ROOF DECK- 11 SF LR ECTRAC GAS\ PROPOSED ROOFADDI7,ICN-21SF SERVICE SERVICE PROPOSED NEW ROOF STRUCTURE - 294 SF PROPOSED REPAIR OF EXISTING UPPER FLOOR WP DECK - 60 SF. METER METER 1EXJSTAY G Y � DRIVE ' OVERHANGS DAUVEWA 8' J=•4�R \ EXISTING. TYPICAL PROPOSED \ STANDING SEAM \ METAL ROOTING \ 0 25' Approx. Scale: 1 inch = 25' LEGEND +BORING NUMBER AND APPROXIMATE B_# LOCATION IA7-6' ;I Permit Set by Michael Shoffner Architect, 2023 ;_ ,•,�11111-,,--t 1, 1 111', 111) i `j11i11 1 {,1,1 Ilt) tl, t � 11 1 ►, Ilrtl ' � ti' ►' 1 1 i �' 1 1 ; �'t;1lt'il'lli' 1'' t l , / � •. 1 1 1 .' ' ('1 y 1 1 t, 1' 1 t It 11'1', EXISTING RESIDENCE 1t/�1111111 ' 1 ; � i','1'� � � 11 �'•-' 11, �11,'1,11t ► 1 , 1,'..� r /f! ,1,11ItIIit11,,« 1111 1 t' it 1 1 1, 1 1 11,y1111� 1It,11'/1�'111'I'1' 1 I 1� j l 11111�I jlili''I111�: /'�'�,'Itltllt, 1' 1 11�I It III I, 1 l► I 1 , 1 11111 I l( 0 1 1 1 , I l l l l l l l l i l l 1111111�1 1II,' I' 111t11111111pt1 11' 1 ' I I1 ` (1 1) (l11 l /l /1 111,1 l jl1;1t1'k0jili1�I1, k I' 1 1, 1 1 1' 1', 1+kit 1j1't, 11 1, 1 1 '�ijt'�� 1'' l l I I III 11 1 1� 1 �1�1�11,it11' 11 1 , 'i'i�'i''' 111�1,11,1111,1,,,Ifll�ll , ',11111 f 1 1 f 0 i% �jAs I City of Edmonds GIS Map, 2023 PROPOSED DECK & ROOF ADDITION (APPROX.) 0 27.5' 55' Approx. Scale: 1 inch = 27.5' PROPERTY LIMITS ILEGEND Landslide Hazard Area (40%) Sever Erosion Hazard (15-40%) Erosion Hazard Areas (15-40%) 0 Earth Subsidence �1j & Landslide Area _c6 Y6., ;'dG 190 SOIL CLASSIFICATION & PENETRATION TEST DATA EXPLANATION MAJOR DIVISION CLEAN GRAVELS GRAVELS (little or no COARSE- (More Than Half fines) GRAINED SOILS Coarse Fraction is Larger Than No. 4 Sieve) DIRTY GRAVELS (with some fines) SANDS CLEAN SANDS (More Than Half More Than Half by Coarse Fraction is (little or no Weight Larger Smaller Than No. 4 fines) Than No. 200 Sieve) Sieve DIRTY SANDS (with some fines) SILTS Liquid Limit (BelowA-Line on <50% Plasticity Chart, Liquid Limit FINE-GRAINED Negligible SOILS Organics) > 50% CLAYS Liquid Limit (Above A -Line on < 50% Plasticity Chart, Liquid Limit Negligible Organics) > 50% Less Than Half by Weight Larger Liquid Limit Than No. 200 ORGANIC SILTS <50°/ Sieve & CLAYS (Below A -Line on Plasticity Chart) Liquid Limit >50% HIGHLY ORGANIC SOILS UNIFIED SOIL CLASSIFICATION SYSTEM GROUP TYPICAL DESCRIPTION SYMBOL WELL GRADED GRAVELS, GRAVEL -SAND GW MIXTURE, LITTLE OR NO FINES C GP POORLY GRADED GRAVELS, AND GRAVEL -SAND MIXTURES LITTLE OR NO FINES GM SILTY GRAVELS, GRAVEL -SAND -SILT MIXTURES GC CLAYEY GRAVELS, GRAVEL -SAND -CLAY MIXTURES WELL GRADED SANDS, GRAVELLY SANDS, LITTLE SW OR NO FINES SP POORLY GRADED SANDS, GRAVELLY SANDS, LITTLE OR NO FINES SM 6Y� ML MH CL CH OL OH Pt SOIL PARTICLE SIZE U.S. STANDARD SIEVE FRACTION Passing Retained Size Sieve (MMSieve ) (M M] SILT/CLAY #200 0.075 SAND FINE #40 0.425 #200 0.075 MEDIUM #10 2.00 #40 0.425 COARSE #4 4.75 #10 2.00 GRAVEL FINE 0.75" 19 #4 4.75 COARSE 3" 76 0.75" 19 COBBLES 76 mm to 203 mm BOULDERS > 203 mm ROCK > 76 mm FRAGMENTS ROCK >0.76 cubic meter in volume SILTY SANDS, SAND -SILT MIXTURES LABORATORY CLASSIFICATION CRITERIA Cu = (D60 / D10) greater than 4 :ONTENT Cc = (D30)2 / (D10 * D60) between 1 and 3 INES BELOW 5 % CLEAN GRAVELS NOT MEETING ABOVE REQUIREMENTS GM: ATTERBERG LIMITS BELOW "A" LINE. CONTENT or P.I. LESS THAN 4 OF FINES EXCEEDS 12% GC: ATTERBERG LIMITS ABOVE "A" LINE. or P.I. MORE THAN 7 Cu = (D60 / D10) greater than 6 CONTENT Cc = (D30)2 / (D10 * D60) between 1 and 3 OF FINES BELOW 5% CLEAN SANDS NOT MEETING ABOVE REQUIREMENTS ATTERBERG LIMITS BELOW "A" LINE with P.I. LESS THAN 4 CONTENT OF FINES EXCEEDSI2% ATTERBERG LIMITS ABOVE "A" LINE CLAYEY SANDS, SAND -CLAY MIXTURES with P.I. MORE THAN 7 INORGANIC SILTS, ROCK FLOUR, SANDY SILTS 60 OF SLIGHT PLASTICITY INORGANIC SILTS, MICACEOUS OR 50 DIATOMACEOUS, FINE SANDY OR SILTY SOIL INORGANIC CLAYS OF LOW PLASTICITY, 40 GRAVELLY, SANDY, OR SILTY CLAYS, CLEAN X w CLAYS Z 30 INORGANIC CLAYS OF HIGH PLASTICITY, FAT H CLAYS U F- 20 ORGANIC SILTS AND ORGANIC SILTY CLAYS OF < LOW PLASTICITY d 10 7 ORGANIC CLAYS OF HIGH PLASTICITY 4 0 PLASTICI5PASSING / FOR SOILNO.40 / CH / U-Line / A -Line / CL MH or OH L-M L or L ML 0 10 20 30 40 50 60 70 80 90 100 PEAT AND OTHER HIGHLY ORGANIC SOILS LIQUID LIMIT (%) GENERAL GUIDANCE FOR ENGINEERING PROPERTIES OF SOILS, BASED ON STANDARD PENETRATION TEST (SPT) DATA SANDY SOILS SILTY & CLAYEY SOILS Unconfined Blow Counts Relative Friction Angle Blow Counts N Density, % x, degrees Description N Strength Cju, Description tsf 0-4 0 -15 Very Loose < 2 < 0.25 Very soft 4-10 15 - 35 26 - 30 Loose 2-4 0.25 - 0.50 Soft 10-30 35 - 65 28 - 35 Medium Dense 4-8 0.50 - 1.00 Medium Stiff 30-50 65 - 85 35 - 42 Dense 8 - 15 1.00 - 2.00 Stiff > 50 85 - 100 38 - 46 Very Dense 15 - 30 2.00 - 4.00 Very Stiff > 30 > 4.00 Hard Group Northwest, Inc. Geotechnical Engineers, Geologists,& Environmental Scientists 13705 Bel -Red Rd Bellevue, WA 98005 Phone (425) 649-8757 Fax (425) 649-8758 PLATE Al BORING NO. B — I Page 1 of 1 Logged By: KJ Date Drilled: 5/18/1999 Surface Elev. Approx. 310 ft Depth USCS Description Sample SPT Blow N Count �) Water Content Other Tests/ Comments Loc. No. ft. a) w Code Counts (%) Lawn surface S1 9 20 20 40 2.2 Blow counts SP-SM SAND to SILTY SAND, damp, medium dense, fine grained affected by tree sand, 10-15% fines, fine subrounded gravel, dark brown root near surface. (becomes gray at 2 feet). S2 11 11 11 22 9.0 5 SP-SM ------------------------------------ S3 21103 13 7.3 SP SAND, damp, medium dense, fine grained sand, grayish brown. SP As above, dense, fine to medium grained sand, trace gravel, I S4 10 14 18 32 8.0 10 occasional lenses of well graded silty sand. SP As above, brownish gray, trace coarse sand and gravel. S5 13 1920 39 7.8 15 SP As above, very dense, fine grained sand. T S6 21 3034 64 8.7 20 SP As above. S7 29 50/3" 50+ 7.4 25 SP As above. T S8 3250 50+ 6.2 30 As above, very fine to fine grained sand, 1" thick silty sand SP lens in sample. S9 23 28 50 78 6.4 Depth of boring: 31.5'. Drilling Method: Hollow -stem auger. Sampling Method: 2"-O.D. standard penetration sampler driven with 140 lb. hammer using cathead. 35 Groundwater not encountered - LEGEND: Z 2" O.D. SPT Sampler 0 Water Level noted during drilling IE3" O.D. California Sampler "WF Water Level measured at later time, as noted BORING LOG PROPOSED ADDITION & ALTERATIONS 16120 72ND AVE W Group Northwest, Inc. _ Geotechnical Engineers, Geologists, & Environmental scientists EDMONDS, WA 98026 JOB NO. G-5936 I DATE 7/19/2023 PLATE A2 r Group Northwest, Inc. Geoteotinical Engineers, Geologists, & Environmental Sciertists 13240 NE 20th Street, Ste 12 Bellevue, WA 98005 Phone 425-649-8757 Fax 425-649-8758 Foundation Soil Bearing Verification DAILY FIELD REPORT Job # I Date Page # Field Report # G-1061-A 10/16/01 1 of 1 3 . le: Hollroyd Residence 16120 - 72nd Ave. W, Sequoia Ridge Dev., Edmonds, WA Foundation Soil Bearina Verification On October 15, 2001, Wade Lassey inspected the spread footing foundation subgrade soils by probing the footing line with a 1/2-inch diameter steel rod. Loose soils were removed from the footing line. The remaining subgrade soils are dense and meet the 2000 psf soil bearing requirement. f. Copy to: Mr. Phil Holroyd - Owner X continued Mr. Jeff Shea - Hammerhead Construction Services on next page Mr. Michael Snook - City of Edmonds, Building Inspector Ms. Jeanie McConnel - City of Edmonds, CIP Specialist