APPROVED BLD RESUB1 BLD2023-1663+Structural+2.21.2024_5.41.09_PM+4074645INTERNATIONAL BUILDING CODE (IBC)
LOADINGS
ROOF SNOW LOAD .....................................................
RESIDENTIAL LIVE LOAD ......................................
DECK, BALCONY, PLATFORM LIVE LOAD ..................
RETAIL, CORRIDOR, LOBBY, WALKWAY LIVE LOAD
OFFICE LIVE LOAD ........................................................
PARKING LIVE LOAD ..................................
WIND CRITERIA
BUILDING CLASSIFICATION ...............................
ULTIMATE WIND SPEED (3 SEC GUST) MPH......
WIND EXPOSURE ...........................................
TOPOGRAPHIC FACTOR, Kzt.................
SEISMIC CRITERIA
SEISMIC RISK CATEGORY ...............................
SPECTRAL RESPONSE COEFFICIENT, Ss ....
SPECTRAL RESPONSE COEFFICIENT, S1 ....
SEISMIC SITE CLASS .................................
SEISMIC DESIGN CATEGORY ...............................
DUCTILITY (R) ...............................
METHOD AND BASE SHEAR ...............................
FOUNDATION DESIGN INFORMATION
2018
CONCRETE AND REINFORCING SPECIFICATIONS
STRUCTURAL STEEL, BOLTING AND WELDING SPECIFICATIONS
DRAWING LIST
structural25
PSF
1. CONCRETE SHALL CONFORM TO THE INDICATED REFERENCE CODES AND STANDARDS
1.
ALL EXPOSED STEEL MEMBERS, HARDWARE, FASTENERS SHALL BE HOT DIPPED GALVANIZED OR EPDXY PAINTED PER
E
SHEET NUMBER
SHEET NAME
ISSUE DATE
40 PSF
EXCEPT AS MODIFIED BELOW:
ARCHITECT REQUIREMENTS. ALL CUT, REPAIRED AND EXPOSED SURFACE SHALL BE PAINTED WITH (2) COAT OF 95%
60 PSF
ACI-301 - "STANDARD SPECIFICATIONS FOR STRUCTURAL CONCRETE"
ZINC RICH PAINT PER ASTM A780. COLOR TO MATCH EXISTING.
S-0
GENERAL NOTES AND
02-19-24
Info@b2englneers.com
100 PSF
ACI-318 - "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE"
"HOT
2.
STEEL SHALL CONFORM TO THE FOLLOWING STANDARDS:
SPECIFICATIONS
425-318-7047 (0)
50 PSF
ACI-305R - WEATHER CONCRETING"
"COLD
TUBE COLUMNS: ASTM A500, GRADE B (Fy = 46 KSI)
S-1
FRAMING PLANS
02-19-24
40 PSF & 3000# WHEEL LOAD
ACI-306R - WEATHER CONCRETING"
WIDE FLANGE COLUMNS OR BEAMS: ASTM 572 GR50
425-318-0031 (C)
ACI-304 - "GUIDE FOR MEASURING, MIXING, TRANSPORTING AND PLACING CONCRETE"
S-2
FRAMING PLAN
02-19-24
STEEL PIPES: ASTM A53, TYPE E OR S, GRADE B (Fy - 35 KSI.)
11
2. CONCRETE COMPRESSIVE STRENGTH REQUIREMENTS (PSI)
STEEL PLATES, ANGLES AND MISC: ASTM A36 (Fy = 36 KSI) OR ASTM A992
S-3
FRAMING DETAILS
02-19-24
BEARING BOLTS: ASTM A325
98 MPH
B
LOCATION f'c AT 28 DAYS W/C RATIO AIR CONTENT ADMIXTURES REQUIREMENTS
SLIP CRITICAL BOLTS: ASTM A325 WITH LOCK WASHERS
Grand total: 4
ANCHOR BOLTS: ASTM A307 (WOOD FRAMING)
1.0
FOOTING 2500 PSI (MIN. OF 5 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE)
ANCHOR BOLTS: ASTM A325 (STEEL FRAMING)
SLAB ON GRADE 2500 PSI (MIN. OF 5 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE)
11
FOUNDATION WALL 2500 PSI (MIN. OF 5 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE)
3.
ALL SLIP CRITICAL CONNECTIONS SHALL BE ASTM A325 BOLTS AND SHALL BE ENGINEER -APPROVED, SELF -LOAD
COLUMN NA
INDICATING TYPES, AND SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
1.25
0.45
POST TENSIONED BLDG SLAB NA
POST TENSIONED PARKING SLAB NA
4.
STRUCTURAL STEEL WELDING SHALL CONFORM TO THE AWS CODES D1.1 AND D1.3.
D
TOPPING NA
ALL WELDING SHALL CONFORM TO THE AWS CODES AND STRUCTURAL DRAWINGS, AND SHALL BE PERFORMED BY
D
SHOTCRETE NA
CERTIFIED WELDERS USING DRY E70XX ELECTRODES
6.5
WELDS NOT SPECIFIED SHALL BE 1/4" CONTINUOUS FILLET MINIMUM. INCREASE WELD SIZE TO AWS MINIMUM SIZES,
ELF
3. PROVIDE GRADE 60 KSI (A615) FOR CONCRETE REINFORCING
BASED ON PLATE THICKNESS.
4. TOTAL AIR CONTENT IS SPECIFIED IN THE TABLE ABOVE. AIR CONTENT TOLERANCE SHALL BE ± 1 % AND SHALL BE MEASURED
AT THE POINT OF PLACEMENT. ALL CONCRETE EXPOSED TO THE WEATHER SHALL HAVE 5% TOTAL AIR REQUIRED.
1. STRUCTURAL DESIGN, DRAINAGE, SUBGRADE PREP. SHALL COMPLY WITH SOIL REPORT
NA
DEEP FOUNDATION SYSTEM: NA
FOOTING BEARING PRESSURE: 1500 PSF
ACTIVE/PASSIVE EARTH PRESSURE: 35 PCF
2. ADDITIONAL NOTES/ REQUIREMENTS:
NA
GENERAL CONDITIONS
1. THE CONTRACTOR SHALL EXAMINE THE STRUCTURAL DRAWINGS AND SHALL NOTIFY THE
STRUCTURAL ENGINEER IN WRITING OF ANY DISCREPANCIES HE MAY FIND BEFORE PROCEEDING
WITH THE WORK. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS AND SITE
CONDITIONS BEFORE STARTING WORK.
2. ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE WORKING
DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE STRUCTURAL
ENGINEER BEFORE PROCEEDING WITH ANY WORK SO INVOLVED.
3. SPECIFIC NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND
TYPICAL DETAILS. WHERE THE NOTES, DRAWINGS, AND/OR SPECIFICATIONS DIFFER, THE MORE
STRINGENT REQUIREMENT SHALL APPLY.
4. IF A SPECIFIC DETAIL IS NOT SHOWN FOR ANY PART OF THE WORK, THE CONSTRUCTION
SHALL BE THE SAME AS FOR SIMILAR WORK.
5. WORKING DIMENSIONS SHALL NOT BE SCALED FROM PLANS, SECTIONS, OR DETAILS ON
THESE DRAWINGS.
6. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT AND THE STRUCTURAL
ENGINEER OF ANY CONDITION THAT, IN HIS OPINION, MIGHT ENDANGER THE STABILITY OF THE
STRUCTURE OR CAUSE DISTRESS TO THE STRUCTURE.
7. THE CONTRACTOR SHALL SUPERVISE AND DIRECT HIS WORK AND HE SHALL BE SOLELY
RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND
PROCEDURES. PROVIDE ADEQUATE SHORING AND BRACING OF ALL STRUCTURAL MEMBERS
DURING CONSTRUCTION. NOTIFY ENGINEER OF ALL FIELD CHANGES PRIOR TO INSTALLATION.
8. REFER TO THE ARCHITECTURAL DRAWINGS FOR INFORMATION NOT COVERED BY THESE
GENERAL NOTES OR THE STRUCTURAL DRAWINGS.
9. ALL CONSTRUCTION SHALL BE DONE WITH MATERIALS, METHODS, AND WORKMANSHIP
ACCEPTED AS GOOD PRACTICE BY THE CONSTRUCTION INDUSTRY AND IN CONFORMANCE WITH
THE PROVISIONS OF PREVAILING CODE EDITION OF THE "INTERNATIONAL BUILDING CODE" (IBC)
AND STANDARDS REFERENCED THEREIN.
10. PIPES, DUCTS, SLEEVES, OPENINGS, POCKETS, CHASES, BLOCK -OUTS, ETC., SHALL NOT
BE PLACED IN SLABS, FOUNDATIONS, ETC., NOR SHALL ANY STRUCTURAL MEMBER BE CUT FOR
SUCH ITEMS, UNLESS SPECIFICALLY DETAILED ON THESE STRUCTURAL DRAWINGS.
11. STRUCTURAL ENGINEER WILL PERFORM PERIODIC STRUCTURAL OBSERVATION DURING
CONSTRUCTION OF STRUCTURAL MEMBERS AND REVIEW OF REQUESTED SUBSTITUTIONS
SHOP DRAWINGS AND SUBMITTALS:
THE FOLLOWING ITEMS SHALL BE SUBMITTED FOR REVIEW PRIOR TO FABRICATION OR INSTALL.
CONTRACTOR SHALL ALLOW SUFFICIENT TIME FOR STRUCTURAL ENGINEER'S REVIEW:
1. SLAB CONDUIT LAYOUT
2. CONCRETE OR MASONRY MIX DESIGN
3. CONCRETE OR MASONRY REINFORCING
4. CONCRETE POST TENSIONING SYSTEM
4. FORMWORK
5. CONCRETE CURING PROCEDURE
6. STRUCTURALSTEEL
7. STUD RAILS AND HEADED ANCHOR EMBED PLATES
8. WOOD FRAMING/ LUMBER PACKAGE
9. SEISMIC HOLDOWN SYSTEM SUCH AS SIMPSON PRODUCTS
DEFERRED SUBMITTALS:
THE FOLLOWING ITEMS SHALL BE SUBMITTED FOR REVIEW PRIOR TO FABRICATION OR INSTALL
1. ANCHORAGE OF NONSTRUCTURAL COMPONENTS
2. CANOPIES AND BALCONIES
3. CURTAIN WALLS
4. EXTERIOR CLADDING
5. HANDRAIL AND GUARDRAIL ASSEMBLIES
6. HEAVY HUNG FIXTURES
7. MECHANICAL EQUIPMENT SUPPORT, SEISMIC ANCHORAGE OR RESTRAINING SYSTEM
8. STEEL STAIRS
9. WINDOW WASHING AND FALL PROTECTION SYSTEMS
LUMBER. ANCHOR BOLTING AND NAILING SPECIFICATIONS
1. MEET REQUIREMENTS OF PS 20-70 AND NATIONAL GRADING RULES FOR SOFTWOOD
DIMENSIONAL LUMBER, BEARING STAMP OF WWPA. ALL EXPOSED LUMBER SHALL BE
PRESSURE TREATED OR EXTERIOR GRADE
2. LUMBER GRADES TO BE (UNLESS
NOTED OTHERWISE ON PLAN):
WALL STUDS, 2X, 3 X........
HF STUD GRADE
WALL PLATES, 2X, 3X........
HF STANDARD GRADE U.N.O
JOISTS, 2 X 6: .............
HF #2
JOISTS, 2 X 8 AND UP.......
DF #2
BEAMS, HEADERS, 6X ........
DF #2
BEAMS, HEADERS, 4X.........
DF #2, WWPA GRADING
POSTS, 4X, 6X..............
DF #2 U.N.O
LUMBER NOT NOTED HERE...
DF #2 U.N.O
GLULAM BEAMS
WESTERN SPECIES 24F-V4
PSL/LVL BEAMS
2.0E OR HIGHER
3. ALL SILLS OR PLATES RESTING ON CONCRETE OR MASONRY THAT IS IN CONTACT WITH OR
RESTING ON FOUNDATIONS SHALL BE PRESSURE -TREATED DOUGLAS FIR/ HEMFIR IN
ACCORDANCE TO WITH AWPA U1 (PLANT/SHOP TREATMENT) AND M4 (FIELD TREATMENT)
STANDARDS. ALL BEARING WALL PLATES SHALL HAVE 5/8" O x10" J-BOLTS PLACED AT MAXIMUM
OF 9" FROM THE END OF A PLATE AND SPACED AT INTERVALS SHOWN ON THE SHEARWALL
SCHEDULE (MAXIMUM 48" OC SPACING). PROVIDE BP/BPS PLATE WASHER AT ALL FOUNDATION
SILL PLATE ANCHOR BOLTS. PROVIDE TWO ANCHOR BOLTS MINIMUM PER SECTION OF SILL.
FOR NON-SHEARWALL, PLACE ANCHORS AT 48". BOLTS IN WOOD SHALL NOT BE LESS THAN 7
DIAMETERS FROM THE END AND 4 DIAMETERS FROM THE EDGE OF THE MEMBER.
4. NAILS: COMMON WIRE NAILS. NAILING IN ACCORDANCE WITH IBC TABLE 2304.9.1
5. PRESSURE TREATED WOOD: ALL NAILS INTO PT WOOD SHALL BE HOT DIPPED GALVANIZED
PER ASTM A153 OR STAINLESS STEEL. ALL METAL CONNECTORS IN CONTACT WITH PT WOOD
SHALL BE HOT DIPPED GALVANIZED AND MEET ASTM A653 CLASS G185 (1.85 OZ OF ZINC PER SQ
FT MINIMUM) OR TYPE 304 / 316 STAINLESS STEEL SIMPSON Z-MAX CONNECTORS MEET THIS
REQUIREMENT. FASTENERS AND CONNECTORS USED TOGETHER SHALL BE OF THE SAME TYPE
(E.G. HOT DIPPED NAILS WITH HOT DIPPED HANGERS)
6. ALL LUMBER WITH A LEAST DIMENSION OF 2" (NOMINAL) SHALL BE STAMPED "SURFACE -DRY"
AND SHALL HAVE A MOISTURE CONTENT WHEN SURFACED AND WHEN INSTALLED OF NO MORE
THAN 19 PERCENT. LUMBER WITH A LEAST DIMENSION OF 4" (NOMINAL) OR GREATER SHALL BE
STAMPED "SURFACE -GREEN" AND AIR-DRIED TO A MOISTURE CONTENT OF NOT MORE THAN 19
PERCENT PRIOR TO ITS USE IN FRAMING THE STRUCTURE.
7. NOTCHING AND BORING OF BEAMS AND JOISTS IS NOT ALLOWED WITHOUT PRIOR APPROVAL
OF THE STRUCTURAL ENGINEER OF RECORD.
-------------------------
! Please obtain a separate !
plumbing permit from the City of !
Edmonds should this permit have !
plumbing work be a part of the
I
scope of work that is being done._------------------------------------
WABO certified Welder required for
this project.
L- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - !
------------------------------------
Special Inspection required for this
project:
1. Post installed anchors in hardened '
concrete
L-----------------------------------
ALL WORK SUBJECT OBTAIN ELECTRICAL APPROVED
TO FIELD PERMIT FROM PLANS MUST BE
INSPECTION FOR STATE LABOR &
CODE COMPLIANCE INDUSTRIES ON JOB SITE
' The following documentation shall be available on
site for the building inspector:
■
COE APPROVED ARCHITECTURAL PLAN SET ■
- X -
F COE APPROVED STRUCTURAL PLAN SET ;
COE REVIEWED CALCULATION PACKET
ENERGY CREDIT WORKSHEET -
SITE PLAN ;
CIVIL PLAN
El■
CITY OF EDMONDS BUILDING DEPARTMENT 2021 ■
.,.,.,.,.,...................................
REVIEWED
BY
CITY OF EDMONDS
BUILDING DEPARTMENT:
REQUIRED? SPECIAL INSPECTIONS (PART!) TYPE OF INSPECTION
NO 1704.2.5 INSPECTION OF FABRICATORS PERIODIC
Verify fabrication/quality control procedures
NO 1705.1.1 SPECIAL CASES CONTINUOUS
(work unusual in nature, including but not limited to alternative materials and systems, unusual
design applications, materials and systems with special manufacturer's requirements)
NO
1705.2 STEEL CONSTRUCTION
1. Fabricator and erector documents (Verify reports and certificates as listed in AISC 360, chapter
EACH SUBMITTAL
N, paragraph 3.2 for compliance with construction documents)
2. Material verification of structural steel
PERIODIC
3. Embedments (Verify diameter, grade, type, length, embedment. See 1705.3 for anchors)
CONTINUOUS
4. Verify member locations, braces, stiffeners, and application of joint details at each connection
PERIODIC
comply with construction documents
5. Structural steel welding:
a. Inspection tasks Prior to Welding (Observe, or perform for each welded joint or member, the QA
OBSERVE OR PERFORM AS NOTED (4)
tasks listed in AISC 360, Table N5.4-1)
b. Inspection tasks During Welding (Observe, or perform for each welded joint or member, the QA
OBSERVE (4)
tasks listed in AISC 360, Table N5.4-1)
c. Inspection tasks After Welding (Observe, or perform for each welded joint or member, the QA
OBSERVE OR PERFORM AS NOTED (4)
tasks listed in AISC 360, Table N5.4-3)
d. Nondestructive testing (NDT) of welded joints: see Commentary
1) Complete penetration groove welds 5/16" or greater in risk category III or IV
PERIODIC
2) Complete penetration groove welds 5/16" or greater in risk category II
PERIODIC
3) Thermally cut surfaces of access holes when material t > 2"
PERIODIC
4) Welded joints subject to fatigue when required by AISC 360, Appendix 3, Table A-3.1
PERIODIC
5) Fabricator's NDT reports when fabricator performs NDT
EACH SUBMITTAL (5)
6. Structural steel bolting:
a. Inspection tasks Prior to Bolting (Observe, or perform tasks for each bolted connection, in
OBSERVE OR PERFORM AS NOTED (4)
accordance with QA tasks listed in AISC 360, Table N5.6-1)
b.lnspection tasks During Bolting (Observe the QA tasks listed in AISC 360, Table N5.6-2)
OBSERVE (4)
1) Pre -tensioned and slip -critical joints
a) Turn -of -nut with matching markings
PERIODIC
b) Direct tension indicator
PERIODIC
c) Twist -off type tension control bolt
PERIODIC
d) Turn -of -nut without matching markings
CONTINUOUS
e) Calibrated wrench
CONTINUOUS
2) Snug -tight joints
PERIODIC
c. Inspection tasks After Bolting (Perform tasks for each bolted connection in accordance with QA
PERFORM (4)
tasks listed in AISC 360, Table N5.6-3)
7. Inspection of steel elements of composite construction prior to concrete placement in accordance
OBSERVE OR PERFORM AS NOTED (4)
with QA tasks listed in AISC 360, Table N6.1
NO
1705.2.2 STEEL CONSTRUCTION OTHER THAN STRUCTURAL STEEL
1. Material verification of cold -formed steel deck:
a. Identification markings
PERIODIC
b. Manufacturer's certified test reports
EACH SUBMITTAL
2. Connection of cold -formed steel deck to supporting structure:
a. Welding
PERIODIC
b. Other fasteners (in accordance with AISC 360,Section N6)
1) Verify fasteners are in conformance with approved submittal
PERIODIC
2) Verify fastener installation is in conformance with approved submittal and manufacturer's
PERIODIC
recommendations
3. Reinforcing steel
a. Verification of weldability of steel other than ASTM A706
PERIODIC
b. Reinforcing steel resisting flexural and axial forces in intermediate and special moment frames,
CONTINUOUS
boundary elements of special concrete structural walls and shear reinforcement
c. Shear reinforcement
CONTINUOUS
d. Other reinforcing steel
PERIODIC
4. Cold -formed steel trusses spanning 60 feet or greater
a. Verify temporary and permanent restraint/bracing are installed in accordance with the approved
PERIODIC
truss submittal package
NO
1705.3 CONCRETE CONSTRUCTION
1. Inspection of reinforcing steel installation (see 1705.2.2 for welding)
P1
2. Inspection of prestressing steel installation
PERIODIC
3. Inspection of anchors cast in concrete where allowable loads have been increased per section
CONTINUOUS
1908.5 or where strength design is used
4. Verify use of approved design mix
P1
5. Fresh concrete sampling, perform slump and air content tests and determine temperature of
CONTINUOUS
concrete
6. Inspection of concrete and shotcrete placement for proper application techniques
CONTINUOUS
7. Inspection for maintenance of specified curing temperature and techniques
P4
8. Inspection of prestressed concrete:
a. Application of prestressing force
CONTINUOUS
b. Grouting of bonded prestressing tendons in the seismic -force -resisting system
CONTINUOUS
9. Erection of precast concrete members
P4
a. Inspect in accordance with construction documents
SEE CONST DOCUMENTS
b. Perform inspections of welding and bolting in accordance with Section 1705.2
ACCORDING TO SECTION 1705.2
10. Verification of in -situ concrete strength, prior to stressing of tendons in post tensioned concrete
P4
and prior to removal of shores and forms from beams and structural slabs
11. Inspection of formwork for shape, lines, location and dimensions
P1
12. Concrete strength testing and verification of compliance with construction documents
P4
YES
POST INSTALLED ANCHORS IN HARDENED CONCRETE
Per research reports including verification of anchor type, anchor dimensions, hole dimensions, hole
P2 OR AS REQUIRED
cleaning procedures, anchor spacing, edge distances, concrete minimum thickness, anchor
BY THE APPROVED REPORT
embedment and tightening torque
INSPECTION NOTES:
REQUIRED? SPECIAL INSPECTIONS (PART 2)
NO 1705.4 MASONRY CONSTRUCTION
(A) Level A, B and C Quality Assurance:
1. Verify compliance with approved submittals
(B) Level B Quality Assurance:
1. Verification of f'm and fAAC prior to construction
(C) Level C Quality Assurance:
1. Verification of f'm and fAAC prior to construction and for every 5,000 SF during construction
2. Verification of proportions of materials in premixed or preblended mortar, prestressing grout, and
grout other than self -consolidating grout, as delivered to the project site
3. Verify placement of masonry units
(D) Levels B and C Quality Assurance:
1. Verification of Slump Flow and Visual Stability Index (VSI) of self -consolidating grout as delivered
to the project
2. Verify compliance with approved submittals
3. Verify proportions of site -mixed mortar, grout and prestressing grout for bonded tendons
4. Verify grade, type, and size of reinforcement and anchor bolts, and prestressing tendons and
anchorages
5. Verify construction of mortar joints
6. Verify placement of reinforcement, connectors, and prestressing tendons and anchorages
7. Verify grout space prior to grouting
8. Verify placement of grout and prestressing grout for bonded tendons
9. Verify size and location of structural masonry elements
10. Verify type, size, and location of anchors, including details of anchorage of masonry to structural
members, frames, or other construction.
11. Verify welding of reinforcement (see 1705.2.2)
12. Verify preparation, construction, and protestion of masonry during cold weather (temperature
below 40 F) or hot weather (temperature above 90 F)
13. Verify application and measurement of prestressing force
14. Verify placement of AAC masonry units and construction of thin -bed mortar joints (first 5000 SF
of AAC masonry)
15. Verify placement of AAC masonry units and construction of thin -bed mortar joints (after the first
5000 SF of AAC masonry)
16. Verify properties of thin -bed mortar for AAC masonry (first 5000 SF of AAC masonry)
17. Verify properties of thin -bed mortar forAAC masonry (after the first 5000 SF of AAC masonry)
18. Prepare grout and mortar specimens
19. Observe preparation of prisms
NO 1705.5 WOOD CONSTRUCTION
1. Inspection of the fabrication process of wood structural elements and assemblies in accordance
with Section 1704.2.5
2. For high -load diaphragms, verify grade and thickness of structural panel sheathing agree with
approved building plans
3. For high -load diaphragms, verify nominal size of framing members at adjoining panel edges, nail
or staple diameter and length, number of fastener lines, and that spacing between fasteners in each
line and at edge margins agree with approved building plans
4. Metal -plate -connected wood trusses spanning 60 feet or greater: verify temporary and permanent
restraint/bracing are installed in accordance with the approved truss submittal package
NO 1705.6 SOILS
1. Verify materials below shallow foundations are adequate to achieve the design bearing capacity.
2. Verify excavations are extended to proper depth and have reached proper material.
3. Perform classification and testing of controlled fill materials.
4. Verify use of proper materials, densities, and lift thicknesses during placement and compaction of
controlled fill
5. Prior to placement of controlled fill, observe subgrade and verify that site has been prepared
properly
NO 1705.7 DRIVEN PILE FOUNDATIONS
1. Verify element materials, sizes and lengths comply with requirements
2. Determine capacities of test elements and conduct additional load tests, as required
3. Observe driving operations and maintain complete and accurate records for each element
4. Verify placement locations and plumbness, confirm type and size of hammer, record number of
blows per foot of penetration, determine required penetrations to achieve design capacity, record tip
and butt elevations and document any damage to foundation element
5. For steel elements, perform additional inspections per Section 1705.2
6. For concrete elements and concrete -filled elements, perform additional inspections per Section
1705.3
7. For specialty elements, perform additional inspections as determined by the registered design
professional in responsible charge
8. Perform additional inspections and tests in accordance with the construction documents
NO 1705.8 CAST IN PLACE FOUNDATIONS
1.Observe drilling operations and maintain complete and accurate records for each element
2. Verify placement locations and plumbness, confirm element diameters, bell diameters (if
applicable), lengths, embedment into bedrock (if applicable) and adequate end -bearing strata
capacity. Record concrete or grout volumes
3. For concrete elements, perform additional inspections in accordance with Section 1705.3
4. Perform additional inspections and tests in accordance with the construction documents
NO 1705.9 HELICAL PILE FOUNDATIONS
1. Verify installation equipment, pile dimensions, tip elevations, final depth, final installation torque
and other data as required.
2. Perform additional inspections and tests in accordance with the construction documents
n1705.10.1 STRUCTURAL WOOD SPECIAL INSPECTIONS FOR WIND RESISTANCE
(1). The inspection and testing agent(s) shall be engaged by the Owner or the Owner's Agent, and
not by the Contractor or Subcontractor whose work is to be inspected or tested. Any conflict of
NO
interest must be disclosed to the Building Official prior to commencing work. The qualifications of
the Special Inspector(s) and/or testing agencies may be subject to the approval of the Building
Official and/or the Design Professional.
(2). The list of Special Inspectors may be submitted as a separate document, if noted so above.
(3). Special Inspections as required by Section 1704.2.5 are not required where the fabricator is
NO
approved in accordance with IBC Section 1704.2.5.2
(4). Observe on a random basis, operations need not be delayed pending these inspections.
Perform these tasks for each welded joint, bolted connection, or steel element.
(5). NDT of welds completed in an approved fabricator's shop may be performed by that fabricator
NO
when approved by the AHJ. Refer to AISC 360, N7.
LEGEND:
NO
C CONTINUOUS INSPECTION
P1 PERIODIC INSPECTION PRIOR TO CONCRETE PLACEMENT
P2 PERIODIC INSPECTION PRIOR TO INSTALLATION OF ELEMENT
P3 PERIODIC INSPECTION PRIOR TO USE ON PROJECT (ONCE ONLY)
P4 PERIODIC INSPECTION AT LEAST ONCE ADAY
P5 PERIODIC INSPECTION AFTER ELEMENT IS IN PLACE
NO
S VERIFY WITH SOILS ENGINEER
T MATERIAL TEST REQUIRED
1. Inspection of field gluing operations of elements of the main windforce-resisting system
2. Inspection of nailing, bolting, anchoring and other fastening of components within the main
windforce-resisting system
1705.10.2 COLD FORMED STEEL INSPECTIONS FOR WIND RESISTANCE
1.Inspection during welding operations of elements of the main windforce-resisting system
2. Inspections for screw attachment, bolting, anchoring and other fastening of components within the
main windforce-resisting system
1705.10.3 WIND RESISTANCE INSPECTIONS
1. Roof cladding
2. Wall cladding
1705.11.1 STRUCTURAL STEEL SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE
INSPECTION OF STRUCTURAL STEEL /N ACCORDANCE WITH AISC 341
1705.11.2 STRUCTURAL WOOD SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE
1. Inspection of field gluing operations of elements of the seismic -force resisting system
2. Inspection of nailing, bolting, anchoring and other fastening of components within the seismic -
force -resisting system
1705.11.3 COLD -FORMED STEEL LIGHT -FRAME CONSTRUCTION SPECIAL INSPECTIONS
FOR SEISMIC RESISTANCE
1. Inspection during welding operations of elements of the seismic -force -resisting system
2. Inspections for screw attachment, bolting, anchoring and other fastening of components within the
seismic -force -resisting system
TYPE OF INSPECTION
P4
PERIODIC
PERIODIC
CONTINUOUS
PERIODIC
CONTINUOUS
PERIODIC
P4
P4
P4
LEVEL B - P4
LEVEL C - CONTINUOUS
LEVEL B - P4
LEVEL C - CONTINUOUS
CONTINUOUS
P4
LEVEL B - PERIODIC
LEVEL C - CONTINUOUS
CONTINUOUS
P4
CONTINUOUS
CONTINUOUS
LEVEL B - PERIODIC
LEVEL C - CONTINUOUS
CONTINUOUS
LEVEL B - PERIODIC
LEVEL C - CONTINUOUS
LEVEL B - P4
LEVEL C - CONTINUOUS
LEVEL B - P4
LEVEL C - CONTINUOUS
PERIODIC
P5
P5
PERIODIC
PERIODIC
PERIODIC
PERIODIC
CONTINUOUS
PERIODIC
CONTINUOUS
CONTINUOUS
CONTINUOUS
CONTINUOUS
SEE SECTION 1705.2
SEE SECTION 1705.3
SEE CONST DOCUMENTS
SEE CONST DOCUMENTS
CONTINUOUS
CONTINUOUS
SEE SECTION 1705.3
SEE CONST DOCUMENTS
CONTINUOUS
SEE CONST. DOCUMENTS
CONTINUOUS
P5
PERIODIC
PERIODIC
PERIODIC
PERIODIC
SEE AISC 341
CONTINUOUS
P5
♦�■0■'■♦
Bq
1 BPS of wasy� S'A
Z
d) Q
p ��L 43789
Q� cTORA L ENG\
SS/ONAL EN
♦♦*"11
VOLPENTEST
CONVERSION
802 DRIFTWOOD LN,
EDMONDS, WA 98020
DRAWING INFO
ISSUE DATE 02-19-24
SSUED FOR PERMIT
PROJECT NO. 23228
ENGINEER BB
REVISION SCHEDULE
NO. DATE DESCRIPTION
BLD2023-1663
RESUB
Feb 22 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
GENERAL NOTES
AND
SPECIFICATIONS
PERIODIC S-0
PERIODIC
Copyright b2 Structural Engineers 2008
(: ) ----------------------------
TING SLAB -ON-(
(NO CHANGES
FOUNDATION
1IA" = 1'-n"
MAIN FLOOR
1 /4" = 1'-0"
1
2
S-3
EXIST. �p
oD
PROVIDE EN RGED FOOTING AT EXISTING STEEL N
1' - 4" COLUMNS WI H #4 REBARS AT 12" O.C. (MAX) EACHWAY
ALL FOOTINGS SHALL BEAR ON SUITABLE SOIL SUCH
in
AS MIN. OF MEDIUM DENSE NATIVE SOIL OR
COMPACTED STRUCTURAL FILL (NO SOFT OR ORGANIC
1 - 2�� MATERIALS)
NEW CRAWLSPACE
4X4 F-1 4X4
EXIST.
JF-1E4
.
6X6
6X6
F-
® _
EXISTING CRAWLSPACE
(NO CHANGES)
EXISTING CRAWLSPACE
(NO CHANGES)
2
1'-6"+/- 5'-11"+/-
F� 4X4
F-3
4X4 PT
4 F-
P
4X4 PT
5'-11"+/-
8' - 6" +/-
P - P / F- P
4X4 PT 4X4 PT 4X4 PT
A El
rQEXIST.
P n CUT EXISTING CONTINUOUS FOOTING AS REQ'D TO
' `��' POUR NEW
6X6 17
M
zo
F- 4X4 PT
P
EXISTING CRAWLSI
(NO CHANGES
ISOLATED FOOTING SCHEDULE
ID
TYPE
WIDTH
LENGTH
THICKNESS
COUNT
REINFORCEMENT
DF-1
ROUND
24"
24"
18"
1
10 - #4 VERTICAL REBARS
& 2 - #3 ROUND TIE
DF-2
ROUND
18"
18"
18"
9
6 - #4 VERTICAL REBARS
& 2 - #3 ROUND TIE
F-1
RECTANGULAR
20"
20"
10"
3
3 - #4 E.W.
F-2
RECTANGULAR
28"
28"
10"
1
3 - #4 E.W.
F-3
RECTANGULAR
28"
20"
10"
1
3 - #4 E.W.
PLAN CALLOUT AND DESCRIPTION
NUMBER
DESCRIPTION
1
ALL FOOTINGS SHALL BEAR ON SUITABLE SOIL SUCH AS MIN. OF MEDIUM
DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL (NO SOFT OR
ORGANIC MATERIALS)
2
CUT EXISTING CONTINUOUS FOOTING AS REQ'D TO POUR NEW
3
PROVIDE ENLARGED FOOTING AT EXISTING STEEL COLUMNS WITH #4
REBARS AT 12" O.C. (MAX) EACH WAY
4
EXISTING WALL TO BE REMOVED; PROVIDE TEMPORARY SHORING AS
REQ'D PRIOR TO WALL REMOVAL
5
NEW PT DECK JOISTS SHALL BE CUT AT BEVEL AND ATTACHED TO
DOUBLE PT RIM BOARD WITH SIMPSON LS70 ADJUSTABLE ANGLE
6
REMOVE EXISTING WINDOW SILL PLATE TO CONVERT WINDOW INTO
DOOR OPENING; CONTRACTOR TO FIELD VERIFY EXISTING HEADER SIZE
AND REPORT TO THE ENGINEER
7
PROVIDE SIMPSON LUS HANGER TO EACH DECK JOIST
7.1
PROVIDE SIMPSON HUS HANGER FOR BEAM TO BEAM ATTACHMENT
7.2
PROVIDE SIMPSON HUC HANGER FOR BEAM TO RIM BOARD ATTACHMENT
8
INFILL EXISTING OPENING W/ 2X STUDS @ 16" O.C.
9
FOR COMMON HEADER SIZES AND FRAMING DETAILS, SEE B/S-3
10
EXISTING PONY WALL TO BE REMOVED
11
PROVIDE 2X PT RIM BOARD, NAILED TO EXISTING RIM W/ 4" TIMBERLOK AT
16" STAGGERED OR SCREWED TO EXISTING CMU WALL WITH 1/2"X3"
TITEN HD SCREWS @ 16" O.0 STAGGERED.
IMPORTANT NOTES ON DRAWING REVIEW. FIELD VERIFICATION. TEMPORARY SHORING
AND WATERPROOFING:
1. CONTRACTOR MUST REVIEW STRUCTURAL DRAWINGS PRIOR TO CONSTRUCTION &
NOTIFY DESIGN TEAM/OWNER OF ANY DISCREPANCY IN COMPARISON WITH
ARCHITECTURAL DOCUMENTS OR FIELD CONDITIONS.
2. IN REMODEL/RETROFIT PROJECTS, CONTRACTOR MUST FIELD VERIFY & NOTIFY
DESIGN TEAM/OWNER OF EXISTING MECHANICAL, PLUMBING, AND ELECTRICAL LINES
THAT MAY INTERFERE WITH STRUCTURAL WORK PRIOR TO CONSTRUCTION.
STRUCTURAL DRAWINGS MAY NOT REFLECT ALL EXISTING FRAMING CONDITIONS DUE
TO LIMITED AVAILABLE INFORMATION.
3. CONTRACTOR IS SOLELY RESPONSIBLE IN PROVIDING PROPER TEMPORARY SHORING
PRIOR TO REMOVING ANY STRUCTURAL ELEMENTS.
4. ENGINEER IS NOT RESPONSIBLE FOR WATERPROOFING SYSTEM OR DETAILS.
CONTRACTOR/OWNER SHALL CONSULT WITH QUALIFIED PROFESSIONALS AS REQUIRED
IMPORTANT NOTES ON FOUNDATION AND FRAMING:
1. LL FOOTINGS SHALL BEAR ON SUITABLE SOIL SUCH AS AT MIN. OF MEDIUM DENSE
TIVE SOIL OR COMPACTED STRUCTURAL FILL TO AT LEAST 95% OF MAX. DRY
DENSITY BASED ON ASTM D1557.
2. FOR FRAMING LUMBER TYPES AND GRADES, AND CONCRETE MIX REQUIREMENTS
PLEASE SEE S-0
3. FOR PLYWOOD/OSB SHEARWALL SCHEDULE & HOLDOWN ANCHOR SIZE AND
EMBEDMENT, PLEASE SEE A/S-3
4. FOR COMMON HEADER FRAMING DETAIL AND HEADER SIZE, SEE B/S-3
5. PROVIDE (2) 2X6 OR (3) 2X4 STUD POSTS AT EACH END OF BEAMS, UNLESS NOTED
OTHERWISE ON PLAN
6. SLAB ON GRADE SHALL BE MIN. 4" THICK WITH #3 AT 18" EACH WAY (AT MID -DEPTH)
ON 6" COMPACTED CRUSHED ROCK. SAWCUT JOINT (1" DEEP) AT 15 FT MAX. SPACING
EACH WAY SHALL BE DONE WITHIN 4 TO 12 HOURS AFTER FINISHING, DEPENDING ON
WEATHER.
7. FLOOR SHEATHING SHALL BE 3/4" PLYWOOD OR OSB WITH 10d AT 6" NAILING AT
EDGES & BLOCKING AND AT 12" AT FIELD
8. ROOF SHEATHING SHALL BE 1/2" PLYWOOD OR OSB WITH 8d AT 6" NAILING AT EDGES
& BLOCKING AND AT 12" AT FIELD
FRAMING SYMBOLS:
SS 24 SIMPSON WSW WOOD p CONTINOUS
S STRONG WALL (24" WIDE) POST
SS j6 PLYWOOD POST STOPS
\' SHEARWALL BELOW THIS FLOOR
1 POST STARTS AT
A ` SHEARWALL HOLDOWN THIS FLOOR
LEGEND AND NOTES
1/4" = 1'-0"
info@b2engineers.com
425-318-7047 (0)
425-318-0031 (C)
♦*"■s#
1 A
♦ BPS of gq
WSy, o
`� - ���
10
d) Q
p �Q� 43789
OcF CTURA L ENG\ �
♦��''♦
SS/ONAL LNG
♦_
VOLPENTEST
CONVERSION
802 DRIFTWOOD LN,
EDMONDS, WA 98020
DRAWING INFO
ISSUE DATE 02-19-24
ISSUED FOR PERMIT
PROJECT NO. 23228
ENGINEER BB
REVISION SCHEDULE
NO. DATE DESCRIPTION
1 02/16/24 1 Revision 1
RESUB
Feb 22 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
FRAMING PLANS
S-1
Copyright b2 Structural Engineers 2008
EXISTING ROOF
BEAM TO REMAIN
EXISTING ROOF
RAFTERS TO REMAIN— —
IMPORTANT NOTES FOR CONTRACTOR:
1. PROVIDE TEMPORARY SHORING AS
NECCESSARY PRIOR TO DEMOLITION WORKS
2. NOTIFY ENGINEER OF ANY DISCREPANCY
IN COMPARISON WITH STRUCTURAL
DOCUMENTS AND FIELD CONDITIONS
CONTRACTOR NOTES
U 1 /4" = V-0"
CD'
UPPER FLOOR / LOWER ROOF
1/4 11-019
_ EXIE
RAF
1 2 m
� � •
• --
info@b2engineers.com
425-318-7047 (0)
425-318-0031 (C )
PLAN CALLOUT AND DESCRIPTION
NUMBER
DESCRIPTION
1
ALL FOOTINGS SHALL BEAR ON SUITABLE SOIL SUCH AS MIN. OF MEDIUM
DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL (NO SOFT OR
ORGANIC MATERIALS)
2
CUT EXISTING CONTINUOUS FOOTING AS REQ'D TO POUR NEW
3
PROVIDE ENLARGED FOOTING AT EXISTING STEEL COLUMNS WITH #4
REBARS AT 12" O.C. (MAX) EACH WAY
4
EXISTING WALL TO BE REMOVED; PROVIDE TEMPORARY SHORING AS
REQ'D PRIOR TO WALL REMOVAL
5
NEW PT DECK JOISTS SHALL BE CUT AT BEVEL AND ATTACHED TO
DOUBLE PT RIM BOARD WITH SIMPSON LS70 ADJUSTABLE ANGLE
6
REMOVE EXISTING WINDOW SILL PLATE TO CONVERT WINDOW INTO
DOOR OPENING; CONTRACTOR TO FIELD VERIFY EXISTING HEADER SIZE
AND REPORT TO THE ENGINEER
7
PROVIDE SIMPSON LUS HANGER TO EACH DECK JOIST
7.1
PROVIDE SIMPSON HUS HANGER FOR BEAM TO BEAM ATTACHMENT
7.2
PROVIDE SIMPSON HUC HANGER FOR BEAM TO RIM BOARD ATTACHMENT
8
INFILL EXISTING OPENING W/ 2X STUDS @ 16" O.C.
9
FOR COMMON HEADER SIZES AND FRAMING DETAILS, SEE B/S-3
10
EXISTING PONY WALL TO BE REMOVED
11
PROVIDE 2X PT RIM BOARD, NAILED TO EXISTING RIM W/ 4" TIMBERLOK AT
16" STAGGERED OR SCREWED TO EXISTING CMU WALL WITH 1/2"X3"
TITEN HD SCREWS @ 16" O.0 STAGGERED.
.%t"'.♦
gq.
BPS OF WAS,,/, S'A
♦
1 ' Z
Q-
p 43789
♦ O� cTURA L ENG�
���SS/ONAL
VOLPENTEST
CONVERSION
802 DRIFTWOOD LN,
EDMONDS, WA 98020
IMPORTANT NOTES ON DRAWING REVIEW, FIELD VERIFICATION, TEMPORARY SHORING
AND WATERPROOFING:
1. CONTRACTOR MUST REVIEW STRUCTURAL DRAWINGS PRIOR TO CONSTRUCTION &
DRAWING INFO
NOTIFY DESIGN TEAM/OWNER OF ANY DISCREPANCY IN COMPARISON WITH
ARCHITECTURAL DOCUMENTS OR FIELD CONDITIONS.
ISSUE DATE 02-19-24
2. IN REMODEL/RETROFIT PROJECTS, CONTRACTOR MUST FIELD VERIFY & NOTIFY
DESIGN TEAM/OWNER OF EXISTING MECHANICAL, PLUMBING, AND ELECTRICAL LINES
THAT MAY INTERFERE WITH STRUCTURAL WORK PRIOR TO CONSTRUCTION.
STRUCTURAL DRAWINGS MAY NOT REFLECT ALL EXISTING FRAMING CONDITIONS DUE
ISSUED FOR PERMIT
TO LIMITED AVAILABLE INFORMATION.
3. CONTRACTOR IS SOLELY RESPONSIBLE IN PROVIDING PROPER TEMPORARY SHORING
PRIOR TO REMOVING ANY STRUCTURAL ELEMENTS.
PROJECT NO. 23228
4. ENGINEER IS NOT RESPONSIBLE FOR WATERPROOFING SYSTEM OR DETAILS.
CONTRACTOR/OWNER SHALL CONSULT WITH QUALIFIED PROFESSIONALS AS REQUIRED
IMPORTANT NOTES ON FOUNDATION AND FRAMING:
ENGINEER Designer
REVISION SCHEDULE
CALL FOOTINGS SHALL BEAR ON SUITABLE SOIL SUCH AS AT MIN. OF MEDIUM DENSE
NATIVE SOIL OR COMPACTED STRUCTURAL FILL TO AT LEAST 95% OF MAX. DRY
DENSITY BASED ON ASTM D1557.
NO.
DATE
DESCRIPTION
2. FOR FRAMING LUMBER TYPES AND GRADES, AND CONCRETE MIX REQUIREMENTS
PLEASE SEE S-0
1 02/16/24 Revision 1
3. FOR PLYWOOD/OSB SHEARWALL SCHEDULE & HOLDOWN ANCHOR SIZE AND
EMBEDMENT, PLEASE SEE A/S-3
4. FOR COMMON HEADER FRAMING DETAIL AND HEADER SIZE, SEE B/S-3
5. PROVIDE (2) 2X6 OR (3) 2X4 STUD POSTS AT EACH END OF BEAMS, UNLESS NOTED
OTHERWISE ON PLAN
6. SLAB ON GRADE SHALL BE MIN. 4" THICK WITH #3 AT 18" EACH WAY (AT MID -DEPTH)
ON 6" COMPACTED CRUSHED ROCK. SAWCUT JOINT (1" DEEP) AT 15 FT MAX. SPACING
EACH WAY SHALL BE DONE WITHIN 4 TO 12 HOURS AFTER FINISHING, DEPENDING ON
WEATHER.
7. FLOOR SHEATHING SHALL BE 3/4" PLYWOOD OR OSB WITH 10d AT 6" NAILING AT
RESU B
EDGES & BLOCKING AND AT 12" AT FIELD
8. ROOF SHEATHING SHALL BE 1/2" PLYWOOD OR OSB WITH 8d AT 6" NAILING AT EDGES
Feb 22 2024
& BLOCKING AND AT 12" AT FIELD
CITY OF EDMONDS
DEVELOPMENT SERVICES
FRAMING SYMBOLS:
DEPARTMENT
<SS24 SIMPSON WSW WOOD ��P CONTINOUS
� STRONG WALL (24" WIDE) POST
FRAMING PLAN
SW6 PLYWOOD P! POST STOPS
SHEARWALL BELOW THIS FLOOR
POST STARTS AT
p SHEARWALL HOLDOWN P THIS FLOOR
S-2
� LEGEND AND NOTES
J 1 /4" = 1'-0"
Copyright b2 Structural Engineers 2008
VI
c
PREMANUFACTURED GUARDRAIL,
° z
GUARDRAIL ATTACHMENT PER
° g
GUARDRAIL MANUFACTURER
n -
°
H2.5 TIE AT 32" (TYP)
o
PT JOISTS
PT BLOCKING @
o
PER PLAN
EACH SUPPORT
PT BEAMS PER PLAN
AC POST CAP
DOUBLE PT RIM
(BOTH SIDES)
BOARD W/ L50
—ABU POST BASE W/ 5/8" X 5 1/2"
PT POST
ANGLE @EACH
STRONG BOLT 2
PER PLAN
JOIST FOR
GUARDRAIL
J
Lu
ATTACHMENT
- CO z)_
J
�
-U- o —VERTICAL REBARS
w 0
-z- _ -PER SCHEDULE
z =
U cUn
U u)
~—W
D�E—R•SO
DIAMETER
aROUND
L PREPARATIONS
TIES
PER PER SCHEDULE --PER SCHEDULE-
PER NOTES ON S 1 I I I I I 1 1 1 1
Section 1
1/2" = 1'-0"
A
PROVIDE BLOCKING BETWEEN STUDS
W/ (3)10d END/TOE NAILS @ EACH STUD
PROVIDE 15/32" PLYWOOD OR & 16d @ 6" O.C. TO EXISTING BEAM
OSB WALL SHEATHING (2 SIDES),
NAILING PER SCHEDULE
7t,
EXISTING BEAM EXISTING ROOF
TO REMAIN RAFTERS TO REMAIN
NEW HEADER /
PER SCHEDULE I\
I I I
NEW 2X6 STUD WALL @ 24" O.C.
(TYP. AT EXTERIOR)
PROVIDE 15/32" PLYWOOD OR
OSB WALL SHEATHING, REFER
TO SCHEDULE FOR NAILING
RIM BOARD
NEW HOLDOWN
— I I EXISTING STEEL
COLUMN TO REMAIN
PROVIDE 2X6 PT SILL PLATE W/
5/8"X10" A.B. WITH BP WASHER
PLATE, SPACING PER SCHEDULE
EXISTING PARAPET D
WALL TO REMAIN S-3
_ _ _ _ _ _ _ 6f EXISTING FLOOR
EXISTING BEAM _ FRAMING TO REMAIN
TO REMAIN
NEW STEEL
HL55 ANGLE W/ BEAM PER PLAN
1/2" THRU BOLTS
EXISTING STEEL —
COLUMN TO REMAIN NEW POST PER PLAN
PROVIDE 2X PT RIM BOARD, NAILED TO EXISTING RIM
W/ 4" TIMBERLOK AT 16" STAGGERED OR SCREWED TO
NEW FLOOR JOISTS, 11 EXISTING CMU WALL WITH 1/2"X3"TITENHID SCREWS @
SHEATHING AND 16"O.0 STAGGERED.
NAILING PER PLAN
M — EXISTING FLOOR
JOISTS TO REMAIN
PLYWOOD OR OSB
PANEL EDGE
PANEL EDGE
ANCHOR BOLTS AT
TOP/SILL PLATE TO
BOTTOM PLATE TO
CAPACITY (LRFD)
TYPE
SHEATHING (NOTE 7)
NAILING (NOTE 4)
STUDS AND BLKG
SILL PLATE (NOTE 8)
BLOCKING/ RIM (NOTE 9)
BLOCKING/ RIM (NOTE 4)
(SEISMIC/WIND)
SW6
15/32" PLY/OSB ONE SIDE
10d COM AT 6"
2x
5/8" AT 36" O.C.-2x
SIMPSON LTP4 AT 24" O.C.
16d COM AT 6" O.C.-NARROW
496 PLF/ 696 PLF
SW4
15/32" PLY/OSB ONE SIDE
10d COM AT 4"
2x (SEE NOTE 5)
5/8" AT 24" O.C.-2x
SIMPSON LTP4 AT 16" O.C.
16d COM AT 4" O.C.-NARROW
736 PLF/ 1032 PLF
SW3
15/32" PLY/OSB ONE SIDE
10d COM AT 3"
3x
5/8" AT 18" O.C.-2x
SIMPSON LTP4 AT 12" O.C.
16d COM AT 3" O.C.-WIDE
960 PLF/ 1344 PLF
SW2
15/32" PLY/OSB ONE SIDE
10d COM AT 2"
3x
5/8" AT 12" O.C.-2x
SIMPSON LTP4 AT 8" O.C.
16d COM AT 2" O.C.-WIDE
1232 PLF/ 1724 PLF
SW44
15/32" PLY/OSB TWO SIDES
10d COM AT 4"
2x
5/8" AT 18" O.C.-3x
SIMPSON LTP4 AT 16" O.C. B.S.
(2) 16d COM AT 4" O.C.-WIDE
1472 PLF/ 2064 PLF
SW33
15/32" PLY/OSB TWO SIDES
10d COM AT 3"
3x
5/8" AT 16" O.C.-3x
SIMPSON LTP4 AT 12" O.C. B.S.
(2) 16d COM AT 3" O.C.-WIDE
1920 PLF/ 2688 PLF
SW22
15/32" PLY/OSB TWO SIDES
10d COM AT 2"
3x
5/8"AT 12" O.C.-3x
SIMPSON LTP4 AT 8" O.C. B.S.
(2) 16d COM AT 2" O.C.-WIDE
2464 PLF/ 3448 PLF
SHEARWALL SCHEDULE NOTES:
1. ALL PANEL EDGES TO OCCUR OVER STUDS, PLATES, RIMS OR HORIZONTAL BLOCKING AT WALLS
16d NAILING PER SCHEI
2. NAIL SHEATHING TO INTERMEDIATE SUPPORTS/ FIELD NAILING 10d AT 12" O.C.
PANEL EDGE
3. ALL NAILS INTO 3x MEMBERS SHALL BE STAGGERED.
NAILING 10d
2x BOTTOM PLATE
(2)2x STUDS MAY BE USED IN LIEU OF 3x STUDS AT PANEL JOINTS.
SIMPSON STRAP
NAIL STUDS TOGETHER W/2 ROWS 16d COMMON AT 6" O.C. AT SINGLE SIDE SHEATHING AND NAIL
WITH 2 ROWS OF 16d COMMON AT 3" O.C. AT DOUBLE SHEATHED WALLS.
PER PLAN (MIN. OF
48" LONG)
4. COM DENOTES COMMON NAILS. MIN. NAIL PENETRATION INTO PLATE, RIM OR BLOCKING SHALL BE 1 5/8".
STAGGER BOTTOM PLATE NAILING
SIMPSON LTP4
,
OR A35 CLIP
5. FOR SHEARWALL SW4, ALL FRAMING MEMBERS RECEIVING EDGE NAILINGS FROM ABUTTING PANELS
(SEE NOTE 9)
FLOOR JOIST
SHALL BE 3X OR (2) 2X NAILED TOGETHER WITH 16d AT 6"
6. WHERE SHEATHING IS APPLIED TO BOTH SIDES OF WALL, OFFSET PANEL EDGES TO FALL ON DIFFERENT STUDS.
PANEL EDGE
RIM BOARD OR BLO
NAILING TO UPPER
7. PROVIDE SHEAR WALL SHEATHING AND NAILING FOR ENTIRE LENGTH OF WALLS NOTED ON PLAN.
TOP PLATE
PROVIDE HOLDOWNS PER PLAN AT EACH END OF WALL, UNO.
DOUBLE TOP PLATE
PROVIDE (2) 2X STUDS AT ENDS OF ALL SHEARWALL. FACE NAIL MULTIPLE STUDS WITH 16d AT 12"
WALL REFERENCE X
PROVIDE PANEL EDGE NAILING IN EACH HOLDOWN STUD AT END OF WALL.
PER PLAN AND
HOLDOWN PER PLAP
8. ALL FOUNDATION SILL PLATES SHALL BE PT MEMBERS AND THE ANCHOR BOLTS SHALL HAVE MIN. OF 7"
SCHEDULE
j SIMPSON HDU, SEEEMBED.
EMBEDMENT WITH SIMPSON'S BP/ BPS WASHER PLATE. END OF WALL ANCHOR BOLTS SHALL BE
DEPTH SCHI
LOCATED MAX 12" AND MIN 5" FROM END OF THE PLATE.
PANEL EDGE
ANCHOR BOLT PER!
NAILING 10d
9. WHERE NOTED IN DETAILS, USE SIMPSON A35 IN LIEU OF LTP4 PLATES SPACE AT 2/3 OF LTP4 SPACING.
PLATE WASHER (NOT
SIMPSON HOLDOWN SIMPSON CAST IN PLACE ANCHOR BOLTS* SIMPSON EPDXY ALL THREAD ANCHORS*
FOUNDATION
j4
P.T. SILL PLATE 2x OR 3
HDU2 SSTB16 (5/8"ANCHOR WITH 12 5/8" MIN. EMBED.) 5/8" (12" EMBED WITH SET-313)
HDU4 SB 5/8X 24 (5/8"ANCHOR WITH 18" MIN. EMBED.) 5/8" (14" EMBED WITH SET-3G)
PER SCHEDULE
HDU5 SB 5/8X 24 (5/8"ANCHOR WITH 18" MIN. EMBED.) 5/8" (16" EMBED WITH SET-3G)
HDU8 SB 7/8X 24 (7/8"ANCHOR WITH 18" MIN. EMBED.)
7" EMBED MIN.
HDU11 SB 1X 30 (1" ANCHOR WITH 24" MIN. EMBED.) * ALL ANCHORS SHALL BE 2.5" MIN.
HDU14 SB 1X 30 (1" ANCHOR WITH 24" MIN. EMBED.) FROM EDGE OF CONCRETE WALL
Fr
SHEARWALL SCHEDULE
N.T.S.
DBL STUD B�' ^`"'
TRIMMER A
STRAP PER PLAN
PROVIDE 6"X8"X3/8" STEEL PLATE W/ BLOCKING —
EXISTING STUD
(2) 1/2" X 5 112" STRONG BOLT 2
#4 @ 16" O.C.
(FOR EACH EXISTING STEEL COLUMN) NEW BEAM PER PLAN
WALL TO REMAIN
EACH WAY
AC POST CAP
1/4 „(BOTHo
e —CUT EXISTING CONT. FOOTING
+ DRAIN ROCK
AS REO'D TO POUR NEW
SEE HEADEF
ABU POST BASE W/ 5/8" X 4" _"
SCHEDULE
b STRONG BOLT 2
- DRAIN—
if -
d U
SOIL PREPARATIONS—
6" `' III _SOIL PREPARATIONS PER—
ENLARGED FOOTING (BEYOND) FOR PER NOTES ON S-11PER
PER �'0
2x SILL
NOTES ON S-1
STEEL COLUMN SUPPORTSCHEDULE
SC U= V=
LEEXISTING
1'- 2— I I I I I I I I I I
„#4
co:
I I I -
PROVIDE
Section 2
BLOCKING
2
1/2° = 1,-0„
UNDER PO;
I IMPORTANT NOTE:
EXISTING PARAPET l NOTIFY ENGINEER OF ANY DISCREPANCY
WALL TO REMAIN IN COMPARISON WITH STRUCTURAL
EXISTING BEAM DOCUMENTS AND FIELD CONDITIONS
TO REMAIN
5" WIDE x 1/4" THICK STEEL PLATES WELDED TO
FLAT STEEL PLATE & SCREWED TO EXISTING CMU
& BRICK WALLS W/ TNT18114H SCREWS @ 4" O.C.
_
CONTRACTOR TO FIELD VERIFY
ATTACHMENT OF EXISTING FLOOR
FRAMING TO CMU WALL AND
NOTIFY E.O.R. OF FINDINGS
LID
1/4" 2" @ 4"
10" WIDE x 3/8" THICK
FLAT STEEL PLATE NEW STEEL
WELDED TO STEEL BEAM 0 0 BEAM PER PLAN
0
1/4" /
STEEL BEAM SECTION v
1" = 1'-0"
B TYP. WALL OPENING FRAMING
N.T.S.
EXTENDED 24" INTO
THE FOOTING (T & B)
STEP FOOTING DETAIL
N.T.S.
F(l(lTlr\Ir,' RFIKIF tfr, AT 19"
2x4 TO MATCH
AREA OF
STUDS ABOVE
2 —r
(5) 16d
EACH END
1 TRIMMER AND 2 KING STUD NAILED
TOGETHER OR POST PER PLAN
LEVEL OPENING HEADER
ALL 5 FT MAX. (2)2X8 DF #2 U.N.O.
NOTE:
AT STUD/PLATE
CONNECTION, PROVIDE
(4) 8d TOENAIL OR
(2) 16d END NAIL
info@b2engineers.com
425-318-7047 (0)
425-318-0031 (C)
)ULE
♦♦■0■'■♦
♦♦
3KING
♦0 \�'\ B
♦ PS of wasy/�`s'A
02
t'
(FOR
■ ■
`"
ACHOR
■ ■
-DULE)
>CHEDULE
y
N — Q-
♦ �c 43789
TORA
E 8)
L e'
♦♦.SS/ONAL ENS♦♦
K
�I►"00
VOLPENTEST
CONVERSION
802 DRIFTWOOD LN,
EDMONDS, WA 98020
J
M
DRAWING INFO
ISSUE DATE 02-19-24
ISSUED FOR PERMIT
PROJECT N0. 23228
ENGINEER BB
REVISION SCHEDULE
NO. DATE I DESCRIPTION
1 02/16/24 1 Revision 1
RESUB
Feb 22 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
FRAMING
DETAILS
S-3
Copyright b2 Structural Engineers 2008