REVIEWED BLD2024-0078 COMPLETED 75 % Demo formRECEIVED BLD2024-0078
`�V E„ jlrJ Apr 08 2024 Permit # 68F9-
CITY OF EDMONDS
fDEVELOPMENT SERVICES """""""""""""""""""""'
DEPARTMENT - REVIEWED
BY
8928 179th Place SW CITY OF EDMONDS
Address: `-
DING DEPARTMENT:
Home Owner: Aimee Asgarian and Paul Reich
Contractor: JCK Enterprises, Inc
This form may be used to help establish the percentage of demolition work performed to an existing
home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing
home's replacement cost (50% in a flood zone), the structure will be required to be rebuilt to the
standards of new construction. See ECDC 19.00.045
Replacement cost of existing home $_ Sy S , CEO
How was the value determined?
Component
Value of
Existing
Component
Percentage
removed
Replacement
cost of removed
component
Notes
Foundation
$30,000
8%
$2400
Floor Framing
$25000
0%
$0
Floor Insulation
$7500
070
$0
Wall Framing
$25,000
g%
$2000
Wall Insulation
$1500
15%
$1500
Siding
$50,000
5%
$2500
Roof Framing
$25,000
0%
$0
Roofing
25,000
0%
$0
Attic Insulation
$7,500
20%
$1500
Windows
$20000
4%
$800
Doors
15,000
20%
$3000
Plumbing
$35,000
20%
$7000
Electrical
$35,000
20%
$7000
HVAC
$35,000
20%
$7000
Drywall
$27,500
20%
$5500
Cabinets
$35,000
57.
$1750
Painting, Flooring
and Finishes
$25000
20%
5000
Other
Tota 1
$424,000
$46,950
Percentage Removed (Total of Column 4 divided by Column 2) equals_%
Owner Date 0A�Z24
Contractor
3/21/24