Loading...
REVIEWED BLD2024-0078 COMPLETED 75 % Demo formRECEIVED BLD2024-0078 `�V E„ jlrJ Apr 08 2024 Permit # 68F9- CITY OF EDMONDS fDEVELOPMENT SERVICES """""""""""""""""""""' DEPARTMENT - REVIEWED BY 8928 179th Place SW CITY OF EDMONDS Address: `- DING DEPARTMENT: Home Owner: Aimee Asgarian and Paul Reich Contractor: JCK Enterprises, Inc This form may be used to help establish the percentage of demolition work performed to an existing home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing home's replacement cost (50% in a flood zone), the structure will be required to be rebuilt to the standards of new construction. See ECDC 19.00.045 Replacement cost of existing home $_ Sy S , CEO How was the value determined? Component Value of Existing Component Percentage removed Replacement cost of removed component Notes Foundation $30,000 8% $2400 Floor Framing $25000 0% $0 Floor Insulation $7500 070 $0 Wall Framing $25,000 g% $2000 Wall Insulation $1500 15% $1500 Siding $50,000 5% $2500 Roof Framing $25,000 0% $0 Roofing 25,000 0% $0 Attic Insulation $7,500 20% $1500 Windows $20000 4% $800 Doors 15,000 20% $3000 Plumbing $35,000 20% $7000 Electrical $35,000 20% $7000 HVAC $35,000 20% $7000 Drywall $27,500 20% $5500 Cabinets $35,000 57. $1750 Painting, Flooring and Finishes $25000 20% 5000 Other Tota 1 $424,000 $46,950 Percentage Removed (Total of Column 4 divided by Column 2) equals_% Owner Date 0A�Z24 Contractor 3/21/24