Loading...
REV1 APPROVED BLD BLD2023-1663+Architectural_Plan+4.27.2024_10.45.41_AM+42229031 (N) 2X6 PARAPET A4.1 NOTE: RAISE TOP OF (E) PARAPET 2 1/2" TO ALLOW FOR (N) RIGID INSULATION — — — — — — — — TOP OF WALL (E) BEAM TO REMAIN (N) PLYWOOD FILLER CONTINUE VAPOR RETARDER UNDER BEAM TO WALL SEE STRUCTURAL I M DWGS. FOR HEADER 1 0 I +1 I I FOAM INSULATION I I TOP OF R.O. I I I I 1�--- - -- - (N) WINDOW 4 A4.1 � 1 BOTTOM OF R.O.Of —I I � J 5/16" HARDIE PANEL 1X4 VERTICAL PT FURRING, SPACING AS REQUIRED BY HARDIE PANEL INSTALLATION INSTRUCTIONS WRB (TYVEK OR SIM.) PLYWOOD SHEATHING (SEE STRUCTURAL DWGS) 2X6 WALL WITH R-21 UNFACED FG BATT INSULATION 5 A4.1 SEE FOUND. PLAN FOR VENT LOCATIONS, SEE 8/A4.1 I FIBER CEMENT. MIN. 2" ABOVE PAVEMENT I I I DAMPPROOFING TO FINISHED GRADE I ;L:PE I BOTTOM OF FOOTING BELOW FROST LINE, 18" MIN. BELOW GRADE, CONFIRM WITH CITY INSPECTOR SEE STRUCTURAL DRAWINGS FOR CONC. WALL REBAR PLACEMENT I 00 d ° I I a • I N zl a iv I ..a • I L--- --- a d d ° Q' v ♦♦♦♦♦♦♦ ♦♦♦♦♦♦♦ ♦♦♦♦♦♦♦ ♦♦♦♦♦♦♦ ♦♦♦♦♦♦♦ ♦ - CORROSION RESISTANT METAL COPING MIN.6" CANT STRIP SEE ROOF PLAN FOR CRICKET TOURCH-DOWN MODIFIED BITUMEN ROOT BASE SHEET (MECH. FASTENED) 3" POLYISO INSULATION (R19.5) ROOF SHEATHING (E) 2X12 AT 24" O.C. ROOF RAFTERS TO REMAIN WITH (N) R-30 (10") UNFACED BATT INSULATION (N) 2X "SISTERED" TO RAFTER FOR FLAT CEILING — BOTTOM OF (E) 2X12 RAFTER DRYWALL CAULKED, GLUED OR GASKETED #3 (E) STEEL POST BEYOND FAI TOP OF INSULATION TOUCHING BOTTOM OF SHEATHING BOTTOM OF INSULATION (NO VAPOR RETARDER 5/8" GYPSUM BOARD (N) SLIM LED RECESSED Q2 LIGHT, IC RATED, AIR -TIGHT ENCLOSURE, USE GASKETS AND SEALANT FOR ALL OPENINGS TO SEALAIR 100% 1.RED DOT • INDICATES LOCATION OF CONTINUOUS SEALANT 2. USE HOT DIPPED GALVANIZED FASTENERS WHEN FASTENERS ARE IN CONTACT WITH PT WOOD. CERTAINTEED MemBrain CLASS II VAPOR RETARDER, SEE NOTE #2 3/4" T&G PLYWOOD OVER 2X10 FLOOR JOIST WITH R-30 FACED FG BATT INSULATION WITH FACING UPTIGHT AGAINST THE BOTTOM OF FLOOR SHEATHING PRESSURE TREATED SILL PLATE INSTALLED OVER SILL GASKET, SEE STRUCTURAL DRAWINGS FOR ANCHOR BOLTS (M CRAWLSPACE SEPARATE (E) STEEL POST FROM (N) CONC. WALL WITH STRIP OF BITUMINOUS FLASHING TAPE 10 C ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE APPROVED PLANS MUST BE ON JOB SITE REVISED PLAN APPROVED 1 CITY OF EDMONDS BUILDING DIVISION BUILDING OFFICIAL May 09 2024 APPROVED DATE TYPICAL WALL SECTION DETAIL SCALE: 1" = 1%0" This revised plan sheet A3.1 is to replace the approved plan sheet A3.1 QA 3 C C 12'-0 7/8" 20'-5" i vv i iivv, r v� i nivv � ��� i vvivvn i lulu I v���u i nv � i�w BEAM CONNECTIONS VERIFY IN FIELD BUILDING SECTION A SCALE:1/4" = 1'-0" SECTION AT NEW DECK SCALE:1/4" = 1'-0" (N) SUBFLOOR; SEE STRUCT. DWGS. (N) 2x JOIST AND INSULATION SEE STRUCT. DWGS. RIM BOARD CONNECTION DETAILS 1 1vik"I11lwl4 DETAIL FOR WALL FOOTING, POST AND BEAM CONNECTIONS ALIGN (N) SUBFLOOR TO (E) SUBLFOOR 5 N AND E FLOORS A3.1 SCALE: 11/2"= 1'-0" (N) HARDWOOD FLOOR (E) SUBFLOOR; PATCH AS REQUIRED (N) PRE -FABRICATED AWNING BY OTHERS, INSTALL ACCORDING TO MANUFACTURER'S INSTALLATION INSTRUCTIONS (N) LINTEL (IF REQUIRED) E HALL (N) DECK FRAMING 1 1 3 (N) STEPS I A4.3 A4.1 I I �— I ' I I h (E) CRAWLSPACE (N) SCREEN HUNG FROM DECK >>F (N) LEDGER SECTION AT NEW ENTRY SCALE:1/4" = 1'-0" (E) FOUNDATION WALL 4" 1 1/81 6" PLASTER o CMU BRICK O STUCCO TYPICAL EXISTING EXTERIOR WALL (PARTIAL SECTION) (ASSUMED V.I.F.) (E) PORCH BEAM TO REMAIN (E) MASONRY PARAPET TO REMAIN (N) MASONRY (GROUT SOLID) AT (E) BEAM SEE STRUCT. DRAWINGS (E) ROOF/FLOOR FRAMING TO REMAIN StudioPNW ARC HITECTURE 176160th PL SE BELLEVUE WA 98008 sean@studiopnw.com 206-883-2100 B2 ENGINEERS 10600 Woodinville Drive Bothell, WA 98011 basri@b2engineers.com Tel.425.318.7047 12025 REGISTERED ARCHIZECi JOHN JOSEPH HILL STATE OF WASHINGTON VOLPENTEST PORCH CONVERSION 802 DRIFTWOOD LN, EDMONDS, WA 98020 4/27/2024 PERMIT DRAWINGS NO. I DATE I DESCRIPTION 12129/23 PERMIT DRAWINGS Q 02/21/24 REVISED PERMIT DRAWINGS REVISION FOR INSULATION AT Q2 4127124 ROORCEILING ASSEMBLY PROJECT NO: Project No. MODEL FILE: 240202 Volpentest PERMIT COMMENTS AC25.pin DRAWN BY: S.H. COPYRIGHT: — — — — — — — — — — — — — — — — — — — — — — L — — — — — — — J SHEET TITLE (E) 2x JOIST AND INSULATION SECTION D RAW I N G S NEEDLE PINNING TEMPORARY SHORING - GC TO CONSULT (E) 2x FRAMED WALL WITH A SHORING ENGINEER FOR SUPPORTING (E) INSTRUCTIONS ISLLATION BLD2023-1663 JOIST Q PRIOR (N) STEEL BEAM - SEE STRUCTURAL DRAWINGS (N) GWB SOFFIT - T-0" ABOVE FINISHED FLOOR A301 REVISI N 7 NEW BEAM IN KITCHEN Apr 29 2024 A3.1 SCALE: 1 1/2"= 1'-0" NDS DEVELOPMENT I TY FOERVICES DEPARTMENT