SIGNED RESUB1 BLD2024-0184+75 PERCENT FORM+5.17.2024_9.47.45_AM+4264223Permit # BLD2024-0184
of evyo�o
Address:633 2nd Ave N,.,.,.,.,.,...............................,
REVIEWED
Mitchell Brown & Stephanie Svanfeldt BY
Home Owner: p CITY OF EDMONDS
Scott DeLa Construction Inc. BUILDING DEPARTMENT:
Contractor: p
This form may be used to help establish the percentage of demolition work performed to an existing
home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing
home's replacement cost (50% in a flood zone), the structure will be required to be rebuilt to the
standards of new construction. See ECDC 19.00.045
Replacement cost of existing home $ 684,000
How was the value determined? Construction costs to rebuild existing house labor & materials.
Component
Value of
Existing
Component
Percentage
removed
Replacement
cost of removed
component
Notes
Foundation
45,000
2
900
Floor Framing
37,000
0
Floor Insulation
7,400
0
Wall Framing
30,000
55
16,500
Wall Insulation
6,100
30
1,830
Siding
45,000
30
13,500
Roof Framing
41,000
25
10,250
Roofing
28,000
15
4,200
Attic Insulation
8,500
75
6,375
Windows
25,000
30
7,500
Doors
18,000
33
5,940
Plumbing
42,000
50
21,000
Electrical
48,000
28
13,440
HVAC
40,000
0
Drywall
42,000
28
11,760
Cabinets
48,000
50
24,000
Painting, Flooring
and Finishes
123,000
50
61,500
Other- Deck
50,000
15
7,500
Total
684,000
206,195
Percentage Removed (Total of Column 4 divided by Column 2) equals 30 %
Owner
Date
Contractor Scott Del-ap Construction Inc. Date 4/24/2024