Loading...
SIGNED RESUB1 BLD2024-0184+75 PERCENT FORM+5.17.2024_9.47.45_AM+4264223Permit # BLD2024-0184 of evyo�o Address:633 2nd Ave N,.,.,.,.,.,..............................., REVIEWED Mitchell Brown & Stephanie Svanfeldt BY Home Owner: p CITY OF EDMONDS Scott DeLa Construction Inc. BUILDING DEPARTMENT: Contractor: p This form may be used to help establish the percentage of demolition work performed to an existing home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing home's replacement cost (50% in a flood zone), the structure will be required to be rebuilt to the standards of new construction. See ECDC 19.00.045 Replacement cost of existing home $ 684,000 How was the value determined? Construction costs to rebuild existing house labor & materials. Component Value of Existing Component Percentage removed Replacement cost of removed component Notes Foundation 45,000 2 900 Floor Framing 37,000 0 Floor Insulation 7,400 0 Wall Framing 30,000 55 16,500 Wall Insulation 6,100 30 1,830 Siding 45,000 30 13,500 Roof Framing 41,000 25 10,250 Roofing 28,000 15 4,200 Attic Insulation 8,500 75 6,375 Windows 25,000 30 7,500 Doors 18,000 33 5,940 Plumbing 42,000 50 21,000 Electrical 48,000 28 13,440 HVAC 40,000 0 Drywall 42,000 28 11,760 Cabinets 48,000 50 24,000 Painting, Flooring and Finishes 123,000 50 61,500 Other- Deck 50,000 15 7,500 Total 684,000 206,195 Percentage Removed (Total of Column 4 divided by Column 2) equals 30 % Owner Date Contractor Scott Del-ap Construction Inc. Date 4/24/2024