REVIEWED BLD2024-0321+Structural_Calculations+3.7.2024_5.05.02_PM+4112416D
D
BALANCED STRUCTURAL ENGINEERING, LLB:
Pardi Garage Conversion
8918 218TH ST SW
EDMONDS, WA 98026
STRUCTURAL CALCULATIONS
DigibIly signed by-hua TMc ...
DN: CN=Joshua T Mergens, O=B.1—d
St, —1 Engbbbnng LLC,
Joshua T Mergens BERI—UMBER= 120230811310024,
L=Olympia, B=Washingto C=UB
Dale: 2-0-7 16 43 2-8'00'
PREPARED FOR:
Taylee & James Pardi
Prepared By: Joshua T Mergens, PE,SE
Balanced Structural Engineering, LLC
Project No: 24012
Date: March 07, 2024
T M
o wa
�53755
EEO ZS��
�s'sj�NAL E�CsZ
3/07/2024
P.O. Box 3806
Lacey, WA 98509
info@BalancedSE.com
(253) 341-7139
Version: 3.3.11
Project Name
Project #
BS
O-E_
Pardi Garage Conversion
24012
Subject
Version:
SALA'- =TURALEFG_V�l
Design Criteria
3.3.11
Project Scope:
Lateral and Vertical Design of Existing Residence
GOVERNING DESIGN CODE: INTERNATIONAL BUILDING CODE 2018 EDITION
GRAVITY LOADS:
Roof Dead Load:
15 PSF Floor Live Load: 40 PSF
Ground Snow:
15 PSF Exterior Wall Dead Load: 10 PSF
Unheated Roof Snow:
25 PSF Interior Wall Dead Load: 8 PSF
Vented Roof (Heated) Snow Load:
25 PSF Deck Dead Load: 10 PSF
Floor Dead Load:
15 PSF Deck Live Load: 60 PSF
LATERAL LOADS:
WIND:
Basic Wind Speed (Ultimate):
100 mph Exposure: B
Basic Wind Speed (Service):
77 mph Kzt: 1.00
SEISMIC:
Site Class: D
Seismic Design Category: D
Ss: 1.280
S1: 0.450
Fa: 1.200
Fv: 1.850
SDS: 1.024
SD1: 0.555
R:
Cs = SDS/(R/I) =
V = CsW = 0.158 W
Cs = 0.7 SDS/(R/I) =
V = 0.7 CsW = 0.113 W
le = 1.00
Level p (Plan N/S) p (Plan E/W)
1 1.00 1.00
2 1.30 1.30
ALLOWABLE SOIL VALUES:
Geo-Technical Engineer:
N/A
Report No. & Date:
N/A
Allowable Soil Bearing Pressure: (Assumed)
Project Name Project #
TDPardi Garage Conversion 24012
DSubject Version:
SE
- ` ���• LLC Gravity Design 3.3.11
GRAVITY DESIGN
I.LEE
Project Name Project #
Pardi Garage Conversion 24012
Subject Version:
BALANCED STRUC-rURAL ENGMEErUNG, LLC Gravity Legend 3.3.11
/ _--------I
II II
I I _
I I �-ter- ..--------I I
III —LIEAI11"6T"'
�Mry A� I- I I O II I
I I II
1 II 0
I I III II
I I III II I I
II I a
I I I bM,F PER I I I
IL-----1_ gxrewcorvmacTOR II EXISTING ROOF SLOPES
J I I II TO BE VEPTIeD INF,[LD I
ad II III
II III
II III
(E)
I PRE- NUFACTURE- TUSES Za o.c. RSI I I
I I II III
I I II IJ I I
II III I I
II III I I
I I II L —
I I 3I2 I r-j �------- -j
I I III II
II II ILL II
Il—
Project Name Project #
33-E Pardi Garage Conversion 24012
Subject Version:
BALANCED STRUCTURAL ENGINEERING, LLC Roof Snow Load and Drift 3.3.11
Pg =
Risk Category =
Is =
Surface Roughness Category
Exposure of Roof
Ce =
Thermal Condition
Ct =
Pf = 0.7*Ce*Ct*Is*Pg =
Roof Pitch =
Roof Surface Type
Cs =
Ps = CsPf =
15 PSF
11
1.0
B
Sheltered
Cold Roofs &
Structures Kept Just
Above Freezing
1.10
11.6 PSF
3:12
All Other Surfaces
1.0
11.6 PSF
Minimum Uniform Snow Load for Low Slope Roofs**:
Ground Snow Load
7.3.3
7.3.1
7.3.2
Flat Roof Snow, 7.3-1
Sloped Roof Snow, 7.4-1
Pm = IsPg1 15 PSF Minimum Roof Snow Load, 7.3.4
Source: Building Department
Vented Roof (Heated) Snow Load = I 15 PSF
For Unheated and Open Air
15 PSF (Use at roofs such as porch covers and garages)
Structures =
For Roofs of Buildings Kept
Intentionally Below Freezing Roof 15 PSF
Snow Load =
For Decks and Balconies, Snow Load
15 PSF 7.2
= IsPg =
Minimum Roof Snow Load = 25 PSF WA State Minimum Per SEAW White Paper #8
For Roofs less than 1:50 slope, add 5 PSF Rain on Snow Surcharge per 7.10
*Unobstructed slippery surfaces designation shall only apply for roofs with R>= 30 for unventalated
roofs and R>=20 for ventalated roofs where Ct = 1.0
Project Name: Project #:
SE Pardi Garage Conversion 24012
17-E
Subject: Version:
sAIANCED STRUCTURAL EMGEHEE-G,LLC Continuous Foundation Design 3.3.11
Uniform Loads
Roof
Floor
Wall
DL = 15 PSF
DL = 15 PSF
DL = 10 PSF
SL = 25 PSF
LL = 40 PSF
Allowable Bearing Pressure = 1 1500 PSF
Applied Bearing Pressure = P/(Ftg Width)
Abrg = 2*D*Ftg Width
Pallow = Abrg*Allow Brg Press.-2*D*W
@ Openings:
Pallow = Abrg*Allow Brg Press.-D*W
(Allowable incresed at openings because w is only on one side)
Continuous Foundation Design
(E)Perimeter Existing Typical perimeter foundation with a stemwall and footing
(E)Gable Existing Typical perimeter foundation with a stemwall and footing
(E)Interior Existing Typical perimeter foundation with a stemwall and footing
Isolated Isolated footings, see end of the gravity design for calcs
Other Footings with multiple loads or special conditions, see end of gravity design for calcs
P
W
D
2*D
Maximum uniform loads are shown below
Tag
Roof Trib
FloorTrib
Wall Trib
DL
SL
ILL
Factored W
Load Case
Ftg
Width
Brg
Pressure
(E)Perimete
28.5/2+1.5
= 15.75 ft
0
= 0.00 ft
8
= 8.00 ft
316 plf
394 plf
0 plf
710 plf
D+S
12 in
710 PSF
OK
(E)Gable
3
= 3.00 ft
0
= 0.00 ft
8
= 8.00 ft
125 pif
75 plf
0 plf
200 plf
D+S
12 in
200 PSF
OK
(E)Interior
20.5/2+2/2
= 11.25 ft
0
= 0.00 ft
8
= 8.00 ft
249 pif
281 pif
0 pif
530 pif
D+S
12 in
53 PPSF
Isolated
See Isolated Footing Design
OK
Allowable Point Loads on Continuous Foundations
Tag
Fdn Height
Brg Length
Brg Area
P Allow
P Allow W/
Uniform Load
@ One Side
arimeter
18 in
3.00 sgft
2370 #
Gable
18 in
3.00 sgft
3900 #
nterior
18 in
1 3.00 sgft
1 2910 #
dated
See Isolated Footing Design
7
Project Name Project #
Pardi Garage Conversion 24012
BS
Subject Version:
gAu��E®v Components and Cladding Wind Pressure 3.3.11
30.4 Components and Cladding Wind Pressure
Code: ASCE 7-16
Wind Speed = 100 mph Exposure Cat. = M.R.H. 12.75 ft
Least Horiz. Dim. = 59.50 ft Elev. = 428 ft
ASCE Reference
qh = 0.00256KZKZtKdKeV2 =
12.51
Table 26.10.1
Kz =
0.57
26.10.1
Kzt =
1.00
26.8
Kd =
0.85
26.6-1
Ke =
Table 26.9.1
Exposure
Wall
B
PRESSURE COEFFICIENTS
ASD Pressures
area ft2
GCpi (+)
GCpi (-)
zone
GCp (+)
GCp (-)
(+)
(-)
0
0.18
-0.1z
8.8::
-9.60
10
0.18
-0.1E
4
1.0
-1.1
8.85
-9.60
20
0.18
-0.1E
4
0.94
-1.04
8.40
-9.15
50
0.18
-0.1E
4
0.88
-0.98
7.95
-8.70
100
0.18
-0.1E
4
0.82
-0.92
7.50
-8.25
200
0.18
-0.18
4
0.76
-0.86
7.05
-7.80
500
0.18
-0.18
4
0.70
-0.80
6.60
-7.35
0
0.18
-0.1E
8.85
-11.86
10
0.18
-0.1P
5
1.00
-1.40
8.85
-11.86
20
0.18
-0.1E
5
0.94
-1.28
8.40
-10.96
50
0.18
-0.1k
5
0.88
-1.16
7.95
-10.05
100
0.18
5
0.82
-1.04
7.50
-9.15
200
0.18
-0.1P
5
0.76
-0.92
7.05
-8.25
500
0.18
-0.1E
5
0.70
-0.80
6.60
-7.35
Zone 4 = Middle Zone
Zone 5 - Corner Zone
Corner Zone Dimension:
a = 5.10 ft
ELEVATION
ProName:
Pardi Garage Conversion
Garage
Project
24012
012
111�11.111)</1)
Subject:
Horizontal Member Summary
Version:
3.3.11
Horizontal Member Summary
All
Passing?
Label
Span
Size
Species
Bending
Check
Total
Deflection
LL Deflection
Shear Check
Left
Trimmer
Right
Trimmer
Number
Kings
Check
Left Footing Sqr
Dim
Check
Right Footing Sqr
Dim
Check
OK
RHl
5.08 ft
4x8
DF p2
OK
OK
OK
OK
(1)
(1)
(1)
OK
Oin
OK
Oin
OK
OK
RH2
3.08 ft
4x6
DF p2
OK
OK
OK
OK
(1)
(1)
NO Kings
OK
Oin
OK
Oin
OK
OK
RH3
10.38h
4x8
DF p2
OK
OK
OK
OK
(1)
(1)
(2)
OK
Oin
OK
Oin
OK
OK
RBl
5.00 ft
4x8
DF p2
OK
OK
OK
OK
(1)
(1)
No Kings
OK
Oin
OK
0 in
OK
r BPardi
��
�-
Project Name
Garage Conversion
Project #
24012
Subject
Headers, Beams, and Joists
Version:
3.3.11
Assume trimmer studs resist 100% of header reaction and king studs resist 100% of wind and load from above. Trimmer studs are braced in x-
x direction. With an applied accidental eccentricty of 1.2", 2x6 studs are controled by compression perpendicular to grain for heights up to
10' for DF#2.
Beam (B)/Header (H)/Joist (J):
RH1
Clear Span = 5.08 ft Design Span =
Roof
DL = 15 PSF
SL = 25 PSF
Trib: 28/2+1.5 = 15.50 ft
PLF Load: DL = 233 plf
5.17 ft
Floor
Wall
Comment
DL =
LL =
15 PSF
DL = 10 PSF
40 PSF
0 = 0.00 ft
0 = 0.00 ft
LL = 0 plf
SL = 388 plf
Factored Load =
620 plf
LC:
D+S
Size:
4x8
Moment of Inertia =
111 in^4
Sx =
31 in^3
Area =
25 in^2
Cd =
1.:
Cm =
No
Cr =
No
Incising?
No
Species:
DF #2
CL =
0.99
Cf/Cv =
1.30
Braced?
No
Moment =
2068'
fb =
809 psi
F'b =
1337 psi
Ratio:
Ratio:
0.605
OK
Shear =
1601 „
fv =
F'v =
0.457
OK
Transient Deflection =
0.035 in
L/d =
L/d Limit =
360
OK
Total Load Deflection =
0.''
L/d =
L/d Limit =
240
OK
Reactions and Support Member
Reations
D
L
5
Factored
Support Type
# of
Trimmers
allowable
Ratio
Left
600 #
�
1601
Trimmer
(1)
2395 #
Right
600 #
0 n
i #
1601 #
Trimmer
2395 #
King Studs
Stud Ht =
8.00 ft
Stud O.C. =
1.33 ft
Wall Loc.:
End Zone
Plys:
1
OK
L/d Allow. =
180
Vert Trib =
2.00 ft
Trib Width =
5.17
Trib Area =
Load from Above
Source
C&C Uniform Pressure:
Total Axial Loads
C&C UDL:
DL=
465#
LL=
0#
SL=
775#
w=
Stud Size:
#2 D.F. King Studs
F'b/Cd =
F'c*/Cd =
2x4 Area = 5.25 in^2 I =
Fb Cf Cr
(900 psi) =
Fc r'
(1350 psi)
5.36 in^4
S = 3.06 in^3
E' =
E'Min =
2025 psi
1600000 psi
1553 ps
580000 psi
Cd
Moment*
Axial
fb
fc
F'b
FbE
Fc*
DL+LL
1.0
2025 psi
466
DL+SL
1.15
-
2329 psi
4661 p_
DL+3/4(LL+SL)
1.15
2329 psi
4661 p,
DL+3/4(LL+SL+W)
1.6
3240 psi
466
DL+W
1.6
4bS #
1Ly2S ,
xy psi
3240 psi
4661 ps-
*Use accidental eccentrictiy of 1.2" in strong axis
Cp
F'c
FcE
Interaction
Deflection Check:
DL+LL
568 p!
63-
3.30
Deflection =
u.3ts
DL+SL
578 p�
634 r�
3.50
I/d =
31
OK
DL+3/4(LL+SL)
n '
17Q r
',IA^<`
1 38
Compression Perpendicular to Grain
DL+3/4(LL+SL+W)
F'c-perp =
405 psi
Capacity = 21
DL+W
V.L4
S7b psi
b14 p51
j.49
Stress Ratio =
r
OK
Interaction Less Than 1.0 Therefore OK
Spot Footing Check
UDL only on
one side?
Foundation
Area
Required
Ftg Square Dim
(in)
Area
Provided
Left Reaction:
Yes
(E)Perimeter
1.78 sgft
0 in
3.00 sgft
OK
Right Reaction:
1601 #
Yes
(E)Perimeter
1.78 sgft
0 in
3.00 sgft
OK
D7,E
"LANCED STRUCTUR
Project Name
Pardi Garage Conversion
Project #
24012
Subject
Headers, Beams, and Joists
Version:
3.3.11
Beam (B)/Header (H)/Joist (J):
i
Assume trimmer studs resist 100% of header reaction and king studs resist 100% of wind and load from above. Trimmer studs are braced in x-
x direction. With an applied accidental eccentricty of 1.2", 2x6 studs are controled by compression perpendicular to grain for heights up to 10'
for DF#2.
H2
Clear Span =
Trib:
PLF Load:
3.08 ft Design Span 1 = �./ rr
Roof
Floor
Wall
Comment
DL =
SL =
15 PSF
DL =
ILL=
15 PSF
DL = 10 PSF
25 PSF
40 PSF
19.5/2+2/2 = 10.75 ft
0 = 0.00 ft
0 = 0.00 ft
DL = 161 plf
LL = 0 plf
SL = 269 plf
Factored Load =
430 plf
LC:
D+S
Size:
4x6
Moment of Inertia =
49 in^4
Sx =
18 in^3
Area =
19 in^2
Cd =
1.15
Cm =
No
Cr =
No
Incising?
No
Species:
DF #2
CL =
1.00
Cf/Cv =
1.30
Braced?
No
Moment =
523 ft
fb =
355 psi
F'b =
1341 psi
Ratio:
Ratio:
,,.4
^w
Shear =
670 #
fv =
52 psi
F'v =
207 psi
0.25
Transient Deflection =
L/d =
L/d Limit =
360
OK
Total Load Deflection =
L/d =
L/d Limit =
240
Reactions and Support Member
Reations
D
L
5
Factored
Support Type
# of
Trimmers
Allowable
Ratio
Left
Trimmer
2395 #
28%
Right
Trimmer
28%
Spot Footing Check
UDL only on
one side?
Foundation
Area
Required
Ftg Square Dim
(in)
Area
Provided
Left Reaction:
,U,
Yes
(E)Interior
— .M.,
0 in
OK
Right Reaction:
670 #
Yes
(E)Interior
0.98 sgft
0 in
OK
r BPardi
��
�-
Project Name
Garage Conversion
Project #
24012
Subject
Headers, Beams, and Joists
Version:
3.3.11
Assume trimmer studs resist 100% of header reaction and king studs resist 100% of wind and load from above. Trimmer studs are braced in x-
x direction. With an applied accidental eccentricty of 1.2", 2x6 studs are controled by compression perpendicular to grain for heights up to
10' for DF#2.
Beam (B)/Header (H)/Joist (J):
RH3
Clear Span = 10.38 ft Design Span = 10.41 ft
Roof Floor Wall Comment
DL = 15 PSF DL = 15 PSF DL = 10 PSF
SL = 25 PSF LL = 40 PSF
Trib: 3 = 3.00 ft 0 = 0.00 ft 0 = 0.00 ft
PLF Load: DL = 45 plf LL = 0 plf SL = 75 plf
Factored Load =
120 plf
LC:
D+S
Size:
4x8
Moment of Inertia =
111 in^4
Sx =
31 in^3
Area =
25 in^2
Cd =
1.:
Cm =
No
Cr =
No
Incising?
No
Species:
DF #2
CL =
0.99
Cf/Cv =
1.30
Braced?
No
Moment =
16251
fb =
636 psi
F'b =
1326 psi
Ratio:
Ratio:
0.480
OK
Shear =
624 a,
fv =
F'v =
0.178
OK
Transient Deflection =
0.111 in
L/d =
L/d Limit =
360
OK
Total Load Deflection =
0."
L/d =
L/d Limit =
240
OK
Reactions and Support Member
Reations
D
L
S
Factored
Support Type
# of
Trimmers
allowable
Ratio
Left
234 #
0 #
. #
624
Trimmer
(1)
2395 #
Right
234 #
0 #
J #
624 #
Trimmer
2395 #
King Studs
Stud Ht =
8.00 ft
Stud O.C. =
1.33 ft
Wall Loc.:
End Zone
Plys:
2
OK
L/d Allow. =
180
Vert Trib =
2.00 ft
Trib Width =
1(
Trib Area =
Load from Above
Source
C&C Uniform Pressure:
Total Axial Loads
C&C UDL:
DL=
90#
LL=
0#
SL=
1!
w=
Stud Size:
#2 D.F. King Studs
F'b/Cd =
F'c*/Cd =
2x4 Area = 10.50 in^2 I =
Fb Cf Cr
(900 psi) =
Fc r'
(1350 psi)
10.72 ��� 4 S = 6.13 in^3
2025 psi E' =
1553 ps E'Min =
1600000 psi
580000 psi
Cd
Moment*
Axial
fb
fc
F'b
FbE
Fc*
DL+LL
1.0
2025 psi
18643 psi
DL+SL
1.15
2329 psi
18643 psi
1-N�.
DL+3/4(LL+SL)
1.15
2329 psi
18643 psi
1�Qr ^<'
DL+3/4(LL+SL+W)
1.6
3240 psi
18643 psi
DL+W
1.6
bL25U.1 .
yu ftwLs
psi
y psi
3240 psi
18643 psi
24254 psi
*Use accidental eccentrictiy of 1.2" in strong axis
Cp
F'c
FcE
Interaction
Deflection Check:
DL+LL
568 p!
63-
3.02
Deflection =
1/1
1
DL+SL
578 p�
634 r�
3.02
I/d =
36
OK
DL+3/4(LL+SL)
n '
17Q r
',IA^<`
1 02
Compression Perpendicular to Grain
DL+3/4(LL+SL+W)
F'c-perp =
405 psi
Capacity = 85
DL+W
V.L4
S7b psi
bi4 p51
j.42
Stress Ratio =
r
OK
Interaction Less Than 1.0 Therefore OK
Spot Footing Check
UDL only on
one side?
Foundation
Area
Required
Ftg Square Dim
(in)
Area
Provided
Left Reaction:
Yes
(E)Gable
0.62 sgft
0 in
3.00 sgft
OK
Right Reaction:
624 #
Yes
(E)Gable
0.62 sgft
0 in
3.00 sgft
OK
D7,E
"LANCED STRUCTUR
Project Name
Pardi Garage Conversion
Project #
24012
Subject
Headers, Beams, and Joists
Version:
3.3.11
Assume trimmer studs resist 100% of header reaction and king studs resist 100% of wind and load from above. Trimmer studs are braced in x-
x direction. With an applied accidental eccentricty of 1.2", 2x6 studs are controled by compression perpendicular to grain for heights up to 10'
for DF#2.
Beam (B)/Header (H)/Joist (J):
�z61
Clear Span =
Trib:
PLF Load:
5.00 ft Design Span = �.uy rr
Roof
Floor
Wall
Comment
DL =
SL =
15 PSF
DL =
ILL=
15 PSF
DL = 10 PSF
25 PSF
40 PSF
28/2+1.5 = 15.50 ft
0 = 0.00 ft
8 = 8.00 ft
DL = 313 plf
LL = 0 plf
SL = 388 plf
Factored Load =
700 plf
LC:
D+S
Size:
4x8
Moment of Inertia =
111 in^4
Sx =
31 in^3
Area =
25 in^2
Cd =
1.15
Cm =
No
Cr =
No
Incising?
No
Species:
DF #2
CL =
1.00
Cf/Cv =
1.30
Braced?
Yes
Moment =
2268 f
fb =
888 psi
F'b =
1346 psi
Ratio:
Ratio:
.a
^w
Shear =
1782
fv =
105 psi
F'v =
207 psi
0.56
Transient Deflection =
L/d =
1855
L/d Limit =
360
OK
Total Load Deflection =
L/d =
1027
L/d Limit =
240
Reactions and Support Member
Reations
D
L
5
Factored
Support Type
# of
Trimmers
Allowable
Ratio
Left
796 #
Trimmer
2395 #
74%
Right
Trimmer
74%
Spot Footing Check
UDL only on
one side?
Foundation
Area
Required
Ftg Square Dim
(in)
Area
Provided
Left Reaction:
1782 #
Yes
(E)Perimeter
0 in
OK
Right Reaction:
1782 #
Yes
(E)Perimeter
0 in
OK
- �
— — T SE Project Name Project #
r Pardi Garage Conversion 24012
\� D Subject Version:
"TURAL Eh- Lateral Design 3.3.11
LATERAL DESIGN
� S_g Project Name Project #
rj� Pardi Garage Conversion 24012
DSubject Version:
ATC Hazards Information 3.3.11
ASCE
Address:
8918 218th St SW
Edmonds, Washington
98026
i�
Seismic
Site Soil Class:
Results:
ASCE Hazards Report
Standard: ASCE?SE17-16 Latitude: 47.801171
Risk Category: 11 Longitude: -122-353584
Soil Class: D - Default (see Elevation: 427.7591892263514 ft
Section 11.4.3) i.NAVD 88)
D - Default (see Section 11.4.3)
S.-
1.28
S,,,
N: A
S,
0.45
TL :
6
F 1,
1.2
PGA :
0.544
F,
N,,A
PGA
0.653
Sres
1.536
F PrA
1.2
SW
N,,A
I..
1
Sr;s
1.024
C,,
1.356
Ground motion hazard analysis may be required. See ASCE,'SEI 7-16 Section 11.4.8.
Data Accessed:
Wed Feb 28 2024
Date Source:
USGS Seismic Design
Maps
Project Name Project #
TPardi Garage Conversion 24012
D 3Subject Version:
BALANCED S7RUCPURAL EMGZFFi: Lateral Legend 3.3.11
I
B I -_==
�===1
L I � II
-----�— r
TI
II I I
II I I
II
II
II II
II
II V II II II
II II II
I U
LL
I I II II II
I I I I I I
I I I I I I
I
I I V II N
---------- —-------------- -- II m
II II II III II �
II 11 III II
II II I a JL_ I I
II II I �bdA,EPOR
II IL_____1— TO 5ENGveRFleo IN RooE SLOPI I
I I I I II ro FreESLo I I
II � II III
II ��a II III
II II III
� i mousses zn^ O.C.
L______JL__ I I II IJ
r -ir-- I I III
I � II III II
II IILj �L JI
11 3:Iz 11 3:12D f-
IL I
If I
II — �_ I
I I
II I I
I I I
I I I
II II I I
DII II I I
5 3 4
Project Name: Project #:
Pardi Garage Conversion 24012
133ESubject: Version:
anuXCED SPAURURAL EXGINEERING. LLC Seismic Analysis 3.3.11
Seismic Analysis: IBC 2018 / ASCE 7-16
Site Class: D (Default) (IBC 1613.3.2, ASCE Table 20.3-1)
Site Coefficients: (From https:Hhazards.atcouncil.org/)
Ss= 1.280 Fa= 1.zUU
SI = 0.450 Fv = 1.850
SMs= Fa * SS = 1.536 (IBC Eq.16-37)
SMI= Fv * SI = 0.833 (IBC Eq.16-38)
Spectral Response Parameters:
SDs= 2/3 * SMs = 1.024 (IBC Eq.16-39)
SDI= 2/3 * SMI = 10.555 (IBC Eq.16-40)
Structure Period:
Ta= Ct * (hn)x=
0.1349
(ASCE Eq. 12.8-7)
hn =
12.75 ft
Structural Height
Ct =
0.02
(ASCE Table 12.8-2)
x =
0.75
(ASCE Table 12.8-2)
Cu =
(ASCE Table 12.8-1)
T(MAX) = Cu * Ta =
(ASCE 12.8.2)
Risk Category: i or i1 w
I or 11, III, IV (ASCE Table 1.5-1) IE = (ASCE Table 1.5-2)
Seismic Design Category:
(IBC 1613.3.5, ASCE 11.6)
Seismic Design Category(SDs):
IBC Table 1613.3.5(1), ASCE Table 11.6-1 Short Period (SDs)
Seismic Design Category(SD1):
IBC Table 1613.3.5(2), ASCE Table 11.6-2 1 Second Period (SDI)
Seismic Response Coefficients:
Cs =SDs/(R/IE) = 0.1575 (ASCE Eq 12.8 2)
R =
Oo =
Cd =
IE =
CS(Max) =
SDI / ((R / IE) * Ta) =
SD1*TL / ((R / IE) * TaA2)=
CS(Min) =
0.044 SDs 1 >=.01 =
Not Required S1<=0.6g
6.50
(ASCE 7 Table 12.2-1)
(ASCE Table 1.5-2)
(ASCE Eq 12.8-3)
(ASCE Eq 12.8-4)
(ASCE Eq 12.8-5)
(ASCE Eq 12.8-6)
3.00
4.00
1.00
0.63
0.63
75.02
0.05
1 0.05
V = Cs * W =
Va = 0.7*Cs * W =
W (Ultimate, LRFD)
W (Service, ASD)
(Wood Sheathed Shearwalls)
for T <= TL OK TL= 16
for T <= TL OK ASCE Section 12.8 & 11.4.5
(ASCE fig. 22-12 thru 22-16)
Project Name: Project #:
SE
Pardi Garage Conversion 24012
OBSubject: Version:
9ALANCED MUMML ENGINEEMNG, LLC Seismic Forces 3.3.11
Building Weight:
Weight Tributary to Level 1:
Floor Area = ±
Roof Area = ±
(0)(15)+(3148)(15+0) _
Linear ft of Ext Walls Below = ±
Ht of Walls Below =
Wall Weight = (919)(10)(8/2) _
Linear ft of Int Wall Below = ±
(208)(8)(8/2) =
Total Weight Tributary to Level 1 =
Note:
Pf =
25 PSF
0 sgft
Wt Floor =
15 PSF
3148 sqft
Wt Roof =
15 PSF
Pf<30, No SL
0 PSF
919.00 ft
Wt Wall =
10 PSF
8.00 ft
208.00 ft Wt Wall = 8 PSF
106 LF of CMU @ 65psf
106 LF"(65)psf/1Opsf=689 LF eq. 10 psf wall
230 LF actual 10 psf wall
919 LF of Ext Wall Total
Project Name: Project #:
SE Pardi Garage Conversion 24012
11-B Subject: Version:
uuNCED srNUcruanL ENGINEENINGLLL Seismic Forces 3.3.11
Total Building Weight I Wbib ;;
Base Shears:
V=
V=
(0.158 )(90636 #) = 14279 # (Ultimate, LRFD)
(0.113 )(90636 #) = 10199 # I (Service, ASD)
Project Name: Project #:
OB SE
Pardi Garage Conversion 24012
Subject: Version:
9ALANCED STNUCTUMLENGINEENINGLLL Seismic Forces 3.3.11
Vertical Distribution of Seismic Forces Per ASCE 12.8.3:
Total Seismic Load = 10199 # (Service) k =
Diaphragm Weight Height Weight*Ht^k Cvx (%) Fx
Level 1 8.00 ft
F 90636 #
Level 1
F
Numbered Shear Lines
Lettered Shear Lines
p
pQE
Cumulative
p
pQE
Cumulative
1
10199 #
1
10199 #
Project Name:
Project #:
O
9LSERoof
Pardi Garage Conversion
24012
Subject:
Version:
BALANCED STRUCTURAL EXGINEERING.LL�
Wind Pressures
3.3.11
Type Pitched
Exp =
V=
Kzt =
Enclosure: Enclosed
z = 10.00 ft (Highest Z)
h = 12.75 ft
Pitch 5:12
Kd = 0.85
Ke =
qz= 0.00256KzKztKdKeVA2
Kz =
qz =
qh = 0.00256KhKztKdVA2
Kh = 0._
qh = 12.51 PSF
P = gGCp-gi(GCpi)
G = 0.85
Gcpi =
L = 57.75 ft (Note a smaller L/B is conservative, use smaller L/B
B = 59.50 ft from each orthoganal direction to be conservative )
Roof Area = 0 sqft (Per Side of Ridge for pitched, 0 is conservative)
Walls
Location
Cp
P @Wall
P Net
P Wall (+Gcpi)
P Wall (- Gcpi)
Windward Wall
10.76 PSF
13.82 PSF
Leeward Wall
-3.06 PSF
Side Wall
-7.44 PSF
9.00 PSF
Normal to Ridge
Windward P @Roof
Leeward P @Roof
P-Net Lateral
Cp A
CP B
P-Up
P-Down
P-Up
Normal to Ridge
Theta<10 and Parallel to Ridge
Horz. Distance From End
LC A
LC B
P-UP
P-Down
P-Net Lat
0 to h/2
-1
-,5F
h/2 to h
-0.
27 PSF
h to 2h
-0.18
-6.47 PSF
0.00 PSF
>2h
-0,"
' 56 PSF
0.00 P'
Parpets, Pp = gp(GCpn)
GCpn
Pp
z @Top of Parapet =
0.00 ft
Windard
1.5
qp = qz @Top of Parapet =
Leeward
1.0
-aTQ-)Pardi
IDSubject:
Project Name:
Garage Conversion
Project #:
24012
Wind Loading
Version:
3.3.11
Wind From 1-3
Diaphragm
Total
Horz. Dist.
Z **
Location
Area
Pressure ***
Load
Min
Pressure
Min Load
Story Shear
(Ultimate)
Story Shear
(Service)
W
(Service)
Base
Shear
(Service)
Level 1
38.00 ft
10.00 ft
Roof Normal to Ridge =
120 sgft
3.36
8 PSF
960 #
6272 #
3763 #
99 PLF
3763 #
Roof Paralell to Ridge =
0 sgft
5.79 PSF*
0 k
8 PSF
0 #
Windward Parapets =
0 sgft
18.76 PSF
^ '
3 PSF
0 #
Leeward Parpets =
0 sgft
12.51 PSF
B PSF
0 #
Walls Trib. to Diaphragm =
332 sgft
13.82 PSF
4588
6 PSF
5312 #
Wind From 3-4
Diaphragm
Total
Horz. Dist.
Z**
Location
Area
Pressure***
Load
Min
Pressure
Min Load
Story Shear
(Ultimate)
Story Shear
(Service)
W
(Service)
Base
Shear
(Service)
Level 1
20.00 ft
10.00 ft
Roof Normal to Ridge =
127 sgft
3.38 PSF
430 #
8 PSF
1016 #
2296 #
1378 #
69 PLF
1378 #
Roof Paralell to Ridge =
0 sgft
5.29 PSF*
0 #
8 PSF
0 #
Windward Parapets =
0 sgft
18.76 PSF
0 #
8 PSF
0 #
Leeward Parpets =
0 sgft
12.51 PSF
0 #
8 PSF
0 #
Walls Trib. to Diaphragm =
80 sgft
13.82 PSF
1106 #
16 PSF
1280 #
-aTQ-)Pardi
IDSubject:
Project Name:
Garage Conversion
Project #:
24012
Wind Loading
Version:
3.3.11
Wind from A-B
Diaphragm
Total
Horz. Dist.
Z **
Location
Area
Pressure ***
Load
Min
Pressure
Min Load
Story Shear
(Ultimate)
Story Shear
(Service)
W
(Service)
Base
Shear
(Service)
Level 1
10.00 ft
10.00 ft
Roof Normal to Ridge =
0 sgft
3.3F,
8 PSF
0 #
804 #
482 #
48 PLF
482 #
Roof Paralell to Ridge =
0 sgft
5.29 PSP
8 PSF
0 #
Windward Parapets =
0 sgft
18.76 PSF
8 PSF
0 #
Leeward Parpets =
0 sgft
12.51 PSF
8 PSF
0 #
Walls Trib. to Diaphragm =
50 sgft
13.82 PSF
694,
16 PSF
804 #:]
Wind from B-C
Diaphragm
Total
Horz. Dist.
Z**
Location
Area
Pressure***
Load
Min
pressure
Min Load
Story Shear
(Ultimate)
Story Shear
(Service)
W
(Service)
Base
Shear
(Service)
Level 1
23.50 ft
10.00 ft
Roof Normal to Ridge =
28 sgft
3.38 PSF
F
224 #
3296 #
1978 #
84 PLF
1978 #
Roof Paralell to Ridge =
0 sgft
5.29 PSF*
J A
8 PSF
0 #
Windward Parapets =
0 sgft
is "
8 PSF
0 #
Leeward Parpets =
0 sgft
8 PSF
0 #
Walls Trib. to Diaphragm =
192 sgft
1;.�
16 PSF
3072 #
-aTQ-)Pardi
IDSubject:
Project Name:
Garage Conversion
Project #:
24012
Wind Loading
Version:
3.3.11
Wind from C-D
Diaphragm
Total
Horz. Dist.
Z **
Location
Area
Pressure ***
Load
Min
Pressure
Min Load
Story Shear
(Ultimate)
Story Shear
(Service)
W
(Service)
Base
Shear
(Service)
Level 1
26.00 ft
10.00 ft
Roof Normal to Ridge =
105 sgft
3.38 PSF
8 PSF
840 #
2568 #
1541 #
59 PLF
1541 #
Roof Paralell to Ridge =
0 sgft
6.91 PSF*
0 k
8 PSF
0 #
Windward Parapets =
0 sgft
18.76 PSF
8 PSF
0 #
Leeward Parpets =
0 sgft
12.51 PSF
8 PSF
0 #
Walls Trib. to Diaphragm =
108 sgft
13.82 PSF
1492
16 PSF
1728 #
Wind from E-F
Diaphragm
Total
Horz. Dist.
Z**
Location
Area
Pressure***
Load
Min
pressure
Min Load
Story Shear
(Ultimate)
Story Shear
(Service)
W
(Service)
Base
Shear
(Service)
Level 1
46.00 ft
10.00 ft
Roof Normal to Ridge =
37 sgft
3.38 PSF
F
296 #
6008 #
3605 #
78 PLF
3605 #
Roof Paralell to Ridge =
0 sgft
5.38 PSF*
J A
8 PSF
0 #
Windward Parapets =
0 sgft
is "
8 PSF
0 #
Leeward Parpets =
0 sgft
8 PSF
0 #
Walls Trib. to Diaphragm =
357 sgft
1;.�
16 PSF
5712 #
-gTQ-)Pardi
IDSubject:
Project Name:
Garage Conversion
Project #:
24012
Wind Loading
Version:
3.3.11
DIAPHRAGM
Level 1
TOTAL WIND NUMBERED LINES WIND NUMBERED CUM.
6766 # 6766 #
TOTAL WIND LETTERED LINES
7606 #
WIND LETTERED CUM.
7606 #
.91
IS.L
E�IANCEDa UC UR
Project Name:
Pardi Garage Conversion
Project #:
24012
Subject:
Diaphgram Distribution
Version:
3.3.11
Diaphragms
Level 1
Wind:
86.58 ft
Diaphram
W
L
B
Aspect
Ratio
Open
Front?
V
v
Diaphragm Type
Floor or
Roof?
Capacity
D/C Ratio
M
T=C
1 to 3
99 PLF
38.00 ft
23.50 ft
No
iooc #
80 PLF
Unblocked Case 3
Roof
17875 ft-#
761 #
3 to 4
20.00 ft
45.75 ft
No
689 #
15 PLF
Unblocked Case 3
Roof
170 PLF
1 3
3444 ft-#
75 #
3 to 5
57 PLF
28.58 ft
26.00 ft
No
813 #
31 PLF
Unblocked Case 3
Roof
170 PLF
0.18
5807 ft-#
223 #
Diaphram
W
L
B
Aspect
Ratio
Open
Front?
V
v
Diaphragm Type
Floor or
Roof?
Capacity
D/C Ratio
M
T=C
A to B
10.00 ft
29.75 ft
Yes
482 #
16 PLF
Unblocked Case 3
Roof
.j
B to C
23.50 ft
38.50 ft
No
989 #
26 PL.
Unblocked Case 3
Roof
3.1:
5809 ft-
C to D
59 PLC
26.00 ft
28.58 ft
No
770 #
27 PLF
Unblocked Case 3
Roof
L70 PLF
3.11
5008 ft-#
175 #
E to F
78 PLI
45.75 ft
19.58 ft
No
1793 #
92 PLF
Unblocked Case 3
Roof
L70 PLF
J.S�
20503 ft-#
1047 #
.91
SETO)
Project Name:
Pardi Garage Conversion
Project #:
24012
Subject:
Version:
awxcEDS UL UEAL ENG]NEEREUG LLC
Diaphgram Distribution
3.3.11
Level 1
Seismic:
Total Seismic Force =
10199 #
(From previous
sheet)
F 86.58 ft
F 2801 sgft
100.0
10199 #
Total Seismic Force =
10199 #
(From previous
sheet)
105.25 ft
2798 sgft
100.0
10199 #
See following sheets for seismic diaphragm design
Diaphram
L
B
Diaphrgm
Area
Aspect
Ratio
Open
Front?
%
Force
W
V
1 to 3
38.00 ft
23.50 ft
1205 sgft
No
43.0
4388 #
115 PLF
2194 #
3 to 4
20.00 ft
45.75 ft
853 sgft
No
30.5
3106 #
155 PLF
1553 #
3 to 5
28.58 ft
26.00 f`
No
26.5
2706 #
95 PLF
1353 #
Diaphram
L
B
Diaphrgm
Area
Aspect
Ratio
Open
Front?
%
Force
W
V
A to B
10.00 ft
29.75 ft
298 sgft
Yes
10.6
1084 #
108 PLF
1084 #
B to C
23.50 ft
38.50 ft
9p5 cnft
No
32.3
3298 #
140 PLF
1649 #
C to D
26.00 ft
28.58 ft
No
26.6
2708 #
104 PLF
1354 #
•-- F
45.75 ft
19.58 ft
853 sgft
No
30.5
3109 #
68 PLF
1554 #
j LJ1 � f
Project Name:
Pardi Garage Conversion
Project #:
24012
l�/J]
Subject:
Version:
�o���..m■�-u=
Seismic Diaphragm Forces
3.3.11
Diaphragm Forces, ASCE 7-16, 12.10
n
"
Design
Level
Fx
Fi
Wx
I Wi
Fpx
Fmin
Finax
Base
Project Name:
Pardi Garage Conversion
1
Project #:
24012
l/J]
Subject:
Seismic Diaphragm Forces
Version:
3.3.11
Level 1
Seismic:
Total Seismic Force =
13259 #
(From previous sheet)
Diaphrgm
Aspect
86.58 ft
Total Seismic Force =
13259 #
2801 sgft
(From previous sheet)
100.0
13259 #
Diaphragm
L
B
Area
Ratio
Open
Front?
%
Force
W
V
v
Diaphragm Type
Floor or
Roof?
Capacity
D/C
Ratio
M
T=C
38.00 ft
23.50 ft
1205 sgft
1.62
N
)4 #
150 PLF
2852 #
121 PLF
Unblocked Case 3
Roof
70 PLF
0.71
27093 ft-#
1153 #
20.00 ft
45.75 ft
853 sgft
0.44
No
,j38 #
202 PLF
2019 #
44 PLF
Unblocked Case 3
Roof
70 PLF
0.26
30094 ft-#
221 #
28.58 ft
26.00 ft
743 sgft
1.10
No
26.5283
3517 #
123 PLF
1759 #
68 PLF
Unblocked Case 3
Roof
70 PLF
0.40
12566 ft-#
483 #
Diaphragm
L
B
Diaphrgm
Area
Aspect
Ratio
Open
Front?
%
Force
W
V
v
Diaphragm Type
Floor or
Roof?
Capacity
D/C
Ratio
M
T=C
A to B
10.00 ft
29.75 ft
298 sgft
0.34
Yes
11
1410 #
141 PLF
1410 #
47 PLF
Unblocked Case 3
Roof
170 PLF
0.28
7048 ft-#
237 #
B to C
23.50 ft
38.50 ft
905 sgft
0.61
No
32
4287 #
182 PLF
2143 #
56 PLF
Unblocked Case 3
Roof
170 PLF
0.33
12592 ft-#
327 #
C to D
26.00 ft
28.58 ft
743 sgft
0.91
No
27
3521 #
135 PLF
1760 #
62 PLF
Unblocked Case 3
Roof
170 PLF
0.36
11443 ft-#
400 #
E to F
45.75 ft
19.58 ft
853 sgft
2.34
No
30
4042 #
88 PLF
2021 #
103 PLF
Unblocked Case 3
Roof
170 PLF
0.61
23113 ft-#
1180 #
Project Name: Project #:
In3 S-Z Pardi Garage Conversion 24012
Subject: Version:
Too Plate (Chord) 3.3.11
Top Plate (Chord) Check:
Tension cap of single #2 DF 2x6:
Pt = (575)
(1.3) (1.6) = 1196 PSI
Ft
Cf Cd
Area
Tension Cap =
9867 #
Max Chord Force =
1180 # OK
Capacity of 10d Nail =
(118) (1.6) = 189 #
Splice Length =
4.00 ft
# of Rows =
0
Row Spacing
Splice Capacity =
OK
^�
IL u`(\(.\111v
Project Name:
Pardi Garage Conversion
Project #:
24012
Subject:
Loads to Lines
Version:
3.3.11
WIND LOADS FROM LEVEL 1
Line
Drag Load
Load Transfer
Dia. 1
V
Dia. 2
V
Dia. 3
V
Dia. 4
V
Sum
Total
1
0 #
0 #
1 to 3
1882 #
Not Used
0 #
Not Used
0 #
Not Used
0 #
1882 #
3
0 #
0 #
1 to 3
1882 #
3 to 4
689 #
3 to 5
813 #
Not Used
0 #
3383 #
6766 #
4
0 #
0 #
3 to 4
689 #
Not Used
0 #
Not Used
0 #
Not Used
0 #
689 #
5
0 #
0 #
3 to 5
813 #
Not Used
0 #
Not Used
0 #
Not Used
0 #
813 #
Line
Drag Load
Load Transfer
Dia. 1
V
Dia. 2
V
Dia. 3
V
Dia. 4
V
Sum
Total
B
u
0 #
A to B
482 #
B to C
989 #
Not Used
0 #
Not Used
0 #
1471 #
C
0 #
0 #
B to C
989 #
C to D
770 #
Not Used
0 #
Not Used
0 #
1759 #
D
0 #
0 #
C to D
770 #
Not Used
0 #
Not Used
0 #
Not Used
0 #
770 #
7586 #
E
0 #
0 #
E to F
1793 #
Not Used
0 #
Not Used
0 #
Not Used
0 #
1793 #
F
0 #
0 #
E to F
1793 #
Not Used
0 #
Not Used
0 #
Not Used
0 #
1793 #
SEISMIC LOADS FROM LEVEL 1
Line
Drag Load
Load Transfer
Dia. 1
V
Dia. 2
V
Dia. 3
V
Dia. 4
V
Sum
Total
0 #
0 #
1 to 3
2194 #
Not Used
0 #
Not Used
0 #
Not Used
2194 #
s
0#
0#
1to3
2194#
3to4
1553#
3to5
1353#
Not Used
5100#
10199#
4
0 #
0 #
3 to 4
1553 #
Not Used
0 #
Not Used
0 #
Not Used
1553 #
S
0 #
0 #
3 to 5
1353 #
Not Used
0 #
Not Used
0 #
Not Used
1353 #
Line
Drag Load
Load Transfer
Dia. 1
V
Dia. 2
V
Dia. 3
V
Dia. 4
V
Sum
Total
0 #
A to B
1084 #
I B to C
1649 #
Not Used
0 #
I Not Used
2733 #
0 #
B to C
1649 #
C to D
1354 #
Not Used
0 #
Not Used
3003 #
0 #
C to D
1354 #
Not Used
0 #
Not Used
0 #
Not Used
1354 #
10199 #
0 #
E to F
1554 #
Not Used
0 #
Not Used
0 #
Not Used
1554 #
0 #
E to F
1554 #
Not Used
0 #
Not Used
0 #
Not Used
1554 #
Project Name: Project #:
aL Pardi Garage Conversion 24012
I&ESubject: Version:
BALANCED SMMML ENGINEERM,LLC Shear Wall Desien 3.3.11
Wood Shearwalls
Line
Level
V
Wall Available
Total Wall
v
A.B.
Spacing
Min H/B
v ad'
1
Wall T
Type
Wall Ht
Uplift/
Comp.
Trib. For
Wt. Down
Weight
Down
Wall (ft)
Net Uplift
Holdown/S
trap
5
1
1353 #
9.92
9.92 ft
136 P
AZ
0.81
N/
Wl
8.00 ft
0 #
15.75
190 PLF
9.92
941 #
vone
C
1
1 3003 #
11+13.42
24.42 ft
123 PLi
Al
0.82
N/F
Wl
9.00 ft
1107 #
20/2+2/2
153 PLF
11
265 #
Ignore
1
1 1354 #
11
11.00 ft
123 PLF
Al
0.82
N/z
Wl
9.00 ft
1108 #
3
81 PLF
11
662 #
LTTP
* Designed per FTAO, v shown is for holdown sizing only, see FTAO calculations for nailing
Where h/bs >2.0, V adj = v/(1.25-.125*h/bs) for wall segments
approximately the same length and v adj = v/(2bs/h) elsehwere.