Loading...
BLD2024-0349+SIGNED SI FORM+5.30.2024_1.51.16_PM+4291070.L ��t F n � nAll SPECIAL INSPECTION AND TESTING AGREEMENT Permit Number: Project: 1RLD2024m0349 Landsvcrkg 1951194" Place West Prior to issuance of a permit, this fiorm must be completed in its entirety and returned to the Cityfor npprnraL The conWletedfornt must have signatures of acknowledgment by all Parties. DEITIES AND RESPONSIBILITIES 0 SDedal Inspection Firm and Special InsPectors The Special Inspection firm of _ will perform special inspection for the foil firm is to be employed). Z Adhesive Anchor Installation El Bolting in Concrete El Prestressed Concrete D Shotcrete ❑ Structural Masonry El Structural Steel/Welding EL High Strength Bolting owing types of work (separate forms must be submitted if more than one El Spray applied Fireproofing r'l Smoke Control Systems ❑ Lateral Wood D Structural Observation by design professional El Water -Resistive Barrier coating and cladding D Retaining Wall Block Installation El Retaimngr Wall Footings All individual inspectors to be employed on this project will be WABO certified for the type of work they are to 0 inspect. If inspection is for work that is not covered by the WABO categories, or the inspectoris not WABO certified, a detailed reswne of the inspector and firm must be submitted. The resume must show that the inspector and the firm arP ni�alified bv education and experience to perform the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans -and specifications approved by the City. Revisions and ad( enda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall include: • A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. • A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. • A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications mid approval revisions or Adenda. Any unresolved discupatwies usc be detailed 41 the final report. \V,j,dmsvr-u sed'sViseq)roiWakaull)esktopUx)NOVANS Comments betters and Special Inspection f0mis 2019\ pecial Inspection formss12024-0349 Landsverk.docx 4/15/2024 MV The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. 1 tie Ot), approved plan and specifications must be made available, at the _jobsite for the use of the special inspector and the City inspector. The conctor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions arc considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. Buildin2 DeDartment The buildina0 department shall review any revisions and addenda. The City inspector 1vill monitor the special inspection functions for compliance with ttie agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Design Professionals The architect and/or engineer will clearly indicate on the plans and specifications the specific types inspection required and shall include a schedule for inspection and testing. coordinate their revision and addenda process in such a way as to ensure that all r prior to work shown on the revisions being performed in the field-, of special 1 he architect and/or engineer will equired City approvals are obtained, Owner The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved plans and this document, may�y void this agreement andtill �Uli�illlg Official's approval oftl�e special in spector. In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreemen on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS t may result in a STOP WORK notice being posted I have read and agree to comply with the terms and conditions of this agreement. Owner: Contractor: Arch/Engr,41 Special Insp: 144 00k N L*AO WSJ MC Signature gmo.�►t ' '0 Date Date 512P12on I ----I - -e-% Signature Date Digitally signed by: Phil Haberman Phil Haberman ph I@ obatgeo.comremailman C = AD 0= Cobalt Cobalt Geosciences for Soils/Geo Phil Haberman Signature Geosciences Date: 2024.05.30 12:18:02-07'00' Date 5/30/2024 Special Inspection Agency: Signature Date ACCEPTED FOR THE CITY OF EDMONDS BUILDING DIVISION Date { \1c;dmsvr-used'souse;rprof$ldakbuV)esktopUx)NUVt1NS Comments Letters, and Spc;cial Inspection forms 2019�.Special hisipectionfomiAS1 2024-0349 Landsveric.docx 4/15/2024