APPROVED BLD2021-0810+Transportation_Impact_Form+2.21.2022_9.24.58_AM+2692393RES U B
Feb 22 2022
CITY OF EDMONDS ,
DEVELOPMENT SERVICE
DEPARTMENT `-
PERM11JING &DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771.0220
BLD2021-0810
APPENDIX A
Page 1 of 2
Transportation impact Analysis
Worksheet
Name of Proposed Project: QdNP 1 C,.1 4 �[OM EG L—05T—
Owner/Applicant
a>&L4w t-
Name
Fp,C y�ts
Street/Mailing Address
City State Zip
Telephone: W�-_ 6_77 ( 11 —1—]
Applicant Contact Person:
R
Name
19
Street/Mailing Address
e✓� ( ZET
City ,/�SState Zip
Telephone: +� �3'
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Firm Name
Telephone:
PROJECT DESCRIPTION
Contact Name
E-mail:
a. Location - Street address: —84y ( �4 -S %(A
(Attach a vicinity map and site plan.)
b. Specify existing land use: (ALE — ��-h�(L� 06 6 L 106RiQ
c. ,Sppecify proposed type and size of development:
�� 2 CAP— o f residential units and/or square footage of building)
d. Date construction will begin and be completed: D�Z&
e. Define proposed access locations: Pe_(Ol _TF ACC62�5 or -
HANDOUT UPDATED 09.02.2021
APPENDIX A
Page 2 of 2
f. Define proposed sight distance at site egress locations: ) E A! Jr &e,-T-
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC
3.36.130.
J CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 impact fee rate shall be used.
ITE Land Use Category I Per Unit
Fee Rate
New Use $ X
Prior Use $ X
Units in
square feet,
# of dwelling,
vfp, etc.
New Use Fee: $ - Prior Use Fee: $ IF
'
I I NEW DEVELOPMENT
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
New Use 2,1 D VA 0 AK X I _
❑ NO CHANGE
U INDEPENDENT FEE CALCULATION
Fee
MITIGATION FEE RECOMMENDATION: $
INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee) $
TOTAL TRANSPORTATION IMPACT FEE( C-f--
City of
, Engineering Division Approval
3/30/2022
Date
No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
HANDOUT UPDATED 09.02.2021