Loading...
APPROVED ENG PLN RESUB3 BLD2021-0812+Site_Plan+10.4.2022_9.40.31_PM+3146337MARK 1YIELING FND 112 J$ PIPE HELD NO N 88 ' '. 1$1,3'' W ?' N FND 112„ REBAR WICAP W 0.4a' OF CALL. CORDER. �., . - L END BLOCK SASEMENTi FLU': 34 .00 Q WALL I MAIN FM J .17 f TOP CIF -COF � � � � � , � I I a 18 o�F i I I �1 , I OVER AN' ! ' � 50 12.5la I ► I j ..., 8 ! 1 20 I ACCESS ,. .. i 1 UTIL17Y EAT,, I I I 1 0 7' >►�.. r EASS'MENT SEMEN ALL SHORT PLAT IMPROVEMENTS SHALL BE COMPLETED PRIOR TO FINAL APPROVAL OF THE SINGLE FAMILY RESIDENCE, UNLESS APPROVED OTHERWISE BY THE CITY'S ENGINEERING DIVISION. Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. APPROVED BY PLANNING ENGINEERING DIVISION APPROVED AS NOTED 11 /15/2022 ***SEE CIVILS C1.0-C2.0*** Zone ; RS v Corner 1N_ Flag Y Setbacks: Required Actual Front - .---------- Sides 75. >7.5 Rear Other Height 25' 24.� SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM BLD2021-0812 PER SEWER CARD INVERTS ALONG N.W. 68TH ST FOR NGVD 29 ADD --3.5 0 11 11 NE 114, SE 114, SEC,31, T.27N., R.4E., W.M. SNOHOMISH COUNTY, WASHINGTON IVViIIr% IVILLMYL FND 1/2" — - - - r PIPE HELD L___j - - 1 N 88'31'13" W 127.00' r� 1 �� -- ---- I - _-- 0 352 - - _ OSED RxIIDENCE END BLOCK,—`FF=355.171 ��a=° `L` G WALL 18" ROOF OVERHANG Cb CARL COOK .25 50' RL COOK 354' I , I I • 354.92 I1 II ( I I It - I I I I I I I I I _— S • UTILITY CONFLICT NOTE.' Know Call be ore you C811 before you dig. CAUTION.' THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE ® 1-800-424-5555 POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. W C,a � O � o 0 0 0z 0 0 o � O � ZE � � O 0 0 +n 20.0' ACCESS AND UTILITY EASEMENT oil 354.00 Mil h 1.354.3. I 1 PR( I NTR (I t n r 3 I r , � w r '� Ln 20' o ACCESS I y o 4' EASEMENT ' � I 1 1 0 FND 1/2" REBAR W/CAP W 0.40' OF CALC. CORNER SPECIAL CARE SHALL BE TAKEN TO ENSURE NO SILTATION ENTERS THE INn R4TION SYSTEM. TYPICAL FOR ALL LOTS. 15' UTILITY I £MENT I I ! 38' �C t 18" ROOF OVERHANG I I PARCEL 27000 4JI00401800 ROSALEA LANDER I ' I _— I'I LI ' r• m 1 7 ' � I cn � r FIRE APPARATUS 7� r I TURN -AROUND I I I o O c"Ico I rn a 77-- 18" ROOF I OVERHANG ' I I I I + I I I 1 1 ROPOSrELr SIDENC I FENCE 20.0' 1 LQ 2 I ' ONOD PROPERTY LINE AND ENCROACHES 0.2' IX FF=,35 .;92 I o t �; I I I I— .� I I I D2' i 3 18,5' 354,00 '� I 1 154.75 c c' I i PARCEL 27043100403400 • • I 42.5' I I I GREGORY & MARY ANNE I 11 I I I JOHNSON I ri 127' m I o ' ' 127' I I 18" ROOF � + OVERHANG -- - -_ i - __--- __ , Zrl PARCEL 27043100401400 } 19 ►I i ' PRQ aSED RESIDENCE i ' I DEBORAH KING ` 355, 50 354.10 • • �354.25 I LOT 1 I i I 15' UTILITY • 11 I I I F=354,58 TOP OF BANK t I I + EASEMENT I I t I I I I I V I � 24 AREA TO DRAIN : + I t I I � I I 'D DRAIN � I . — � i ' `, LANDSNPE RETAININCY, WALL -CB RIM = 363.28' v "II I r , I.E. W. 112"=3611..657 i rr �� TOE 355� it CONC. ENCROACHES S.' 127' 14' r ® ti r — — I 0 I � /00010or SCALE: 1 ' = 20' 20 10 0 20 40 " -gtT iME MF_"T"5 1 .�6MC*b iN-i6 W61USe AZE tf-4 &PI-0 U0 0 I i 127.00 ' FOUND 5/8" REBAR FND 1/2" REBAR `, � I W/WE1 CAP HELD POSITION BENT OVER Wl 1.0' , tl 3 APPROX. LOCATI _ ASPH W i b W �OF 8" DI WATER MAIN — +� 4 240 T — — — r S d EX. C/L OF RD —— — G ' ' G N 88'35'01" W 513.28' CALC. S S8D34' 17" E G / o-- a- Q Q TBM -- CB RIM - 357.39 -- - _-- ° SMH RIM = 348.80' 1.E. N.W. 12" = 355.91' CB RIM = 348.82' I.E. W 8" = 337.36'- 1.E E. 12" = 355.15' I.E. E. 8" = 337.38' BLD2021-0812 Filter socks shall be added to any catch basins downstream from the construction site per City standard detail ER-902. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE ALL DISTURBED SOILS SHALL BE COMPOST AMENDED PER CITY OF EDMONDS STANDARD DETAIL SD-642 OR APPROVED EQUAL. ENGINEERING DIVISION APPROVED AS NOTED 11 /15/2022 REV. NO. g�TREES TO RETAIN (TREES TO BE REMOVED) DESCRIPTION RWA Sky �Cn 36499gU� n C Is IV, sti INITIALS GRADING QUANTITIES:• CUT. • 50 Cu. Yds. FILL: 50 Cu.Yds. (GRADING QUANTITIES WERE CALCULATED USING THE LAND DEVELOPMENT DESKTOP COMPOSITE METHOD. CALCULATIONS DO NOT ACCOUNT FOR SOIL SWELLING AND SHRINKAGE.) T.E.S.C. LEGEND TEMPORARY CONSTRUCTION ENTRANCE CATCH BASIN INSERT PROTECTION (TYP.) G•� CLEARING LIMITS SF SF SILT FENCE MU MULCH &/OR STRAW MATTING Pt PLASTIC COVER FLOW ARROW (EX.) 0UIPMENTAND PROCEDURE LEICA TC 1000 FOR FIELD TRAVERS AND TOPOGRAPHY. MONUMENTS VISITED 1012004 PRECISION EXCEEDS STATE STANDARDS, BM PER SEWER CARD INVERTS ALONG N.W. 68TH ST. FOR NGVD 29 ADD -3.5 TBM EX. SMH RIM = 346.80' I.E. W. 8" _. 337.36' I.E. E 8" _ 337. J8' VERTICAL DATUM: NAVD 88 ENGINEER/CONTACT INSIGHT ENGINEERING COliIPANY P.O. BOX 1478 EVERETT, WA 98206 CONTACT. BRIAN R. KALAB, P.E. PH: (425) 303-9363 EMAIL: INFO@INSIGHTENGINEERING. NET SURVEYOR GREENE LAND SURVEYING 7408 164TH ST SW L YNNWOOD, WA 98087 PH: (206) 498- 0979 APPLICANT / OWNER BELMONT AULCK PH: (206) 571-7777 LEGAL DESCRIPTION LOT 3 OF CITY OF EDMUNDS SHORT PLAT NO. S-6-79, AS RECORDED UNDER RECORDING NO. 7905090293, RECORDS OF SNOHOMISH COUNTY AUDITOR. SITUATE IN THE CITY OF EDMUNDS, COUNTY OF SNOHOMISH, STATE OF WASHINGTON. CITY OFEDMONDS APPROVED FOR CONSTR UCTION FOR: PUBLIC WORKS DIRECTOR DATE INSIGHT ENGINEERING CO. P.O. BOX - 1478 EVERETT, WA 98206 (425) 303-9363 (425) 303-9362 FAX INFOQa INSIGHTENGMERING.NET SITE ADDRESS: 7901 240TH ST SW EDMUNDS, WA 98026 DATE TAX ACCOUNT NO.'S: 0045200040080k A UB Oct 05 2022 NE 1/4, SE 1/4, SEG31, ff=m . QUANTUMHOMES DWG FILENAME DESIGNED BY, DATE: SCALE. JOB NO.: 180945. DWG ISPC 06-09-2022 1 "=20' 15-0945 SHEET GRADING AND SWPP PLAN C1.O NE 114, SE 114, SEC.31, T.27N., R.4Ee, W.M. SNOHOMISH COUNTY, WASHINGTON GENERAL NOTES 1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS: 2022 - - CURRENT INTERNATIONAL BUILDING CODE (IBC) 2^10 WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION - WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN (2019) 2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDARD DETAILS, UNLESS NOTED OTHERWISE 3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCTION IS IN PROGRESS. 4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL GOVERNING AUTHORITY. 5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF "AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL AS -BUILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT APPROVAL. 6. ELEVATIONS SHOWN ARE 1N FEET. SEE SURVEY FOR BENCHMARK INFORMATION. 7. THE LOCATONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE EXISTING UTILITIES AND SITE FEATURES PRESENTED ON THESE DRAWINGS. ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT ARISE, 8. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES LOCATION SERVICE (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION, 9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL N071FY OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES. 10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS. 11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT. 12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT. 13. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL. IF SOIL 1S DISTURBED, SOFT, LOOSE, WET OR IF ORGANIC MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FILL PER GEOTECHNICAL REPORT. 14. SEE SURVEY AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR EXISTING SITE FEATURES. 15. SEE ARCHITECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS. FOUNDATION DRAINS SHALL BE INDEPENDENT OF OTHER SITE DRAIN LINES AND SHALL BE TIGHTLINED TO THE STORM DRAIN SYSTEM WHERE INDICATED ON THE PLANS. 16. ALL REQUIRED STORMWATER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER. 17. ALL ROOF DRAINS, PERIMETER FOUNDATION DRAINS, CATCH BASINS AND OTHER EXTERNAL DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE, 18. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE IMPROVEMENTS INDICATED ON THESE DRAWINGS. 19. AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BE RETURNEDTO THE EQUIVALENT OF THEIR PRECONSTRUCTION CONDITION IN ACCORDANCE WITH APPROPRIATE REQUIREMENTS AND STANDARDS. 20. ALL DISTURBED SOIL AREAS SHALL BE SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS. 21. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL. 22, THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH EXPORT AND IMPORT OF SOIL AND ROCK MATERIALS ARE REQUIRED. 23. SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS SHOWN. 24. FINISHED GRADE SHALL SLOPE AWAY FROM BUILDING WALLS AT MINIMUM 59 SLOPE FOR A MINIMUM DISTANCE OF 10 FEET. 25. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING AS NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS, STREETS, WALKWAYS, UTILITIES AND OTHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST LOSS OF GROUND OR CAVING EMBANKMENTS. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF SHORING AND BRACING, AS REQUIRED. 26. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR ALL WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET CLOSURES OR OTHER ACCESS RESTRICTIONS. CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST OBTAINING WRITTEN APPROVAL FROM THE FIRE MARSHAL. 27. COORDINATE AND ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY RELOCATIONS AND/OR SERVICE INTERRUPTIONS WITH THE AFFECTED OWNERS AND APPROPRIATE UTILITY COMPANIES. CONNECTIONS TO EXISTING UTILITIES SHALL OF THE AUTHORITIES GOVERNING SAID UTILITIES. B MADE ONLY WITH ADVANCE WRITTEN APPROVAL G E 28. EXISTING UTILITY LINES IN SERVICE WHICH ARE DAMAGED DUE TO CONSTRUCTION WORK SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE AND INSPECTED AND ACCEPTED BY CITY OF EDMONDS AND OWNER'S REPRESENTATIVE PRIOR TO BACKFILLING. 29. NEW UTILITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS ARE INDICATED, LOCATIONS MAY BE SCALED FROM DRAWINGS. FIELD ADJUSTMENTS SHALL BE APPROVED BY OWNER'S REPRESENTATIVE AND CITY. 30. WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR LESS, PLACE POLYETHYLENE PLASTIC FOAM AS A CUSHION BETWEEN THE UTILITIES. 31. SEE MECHANICAL DRAWINGS (WHERE APPLICABLE) FOR CONTINUATION OF SITE UTILITIES WITHIN THE BUILDING. 32. SEE ELECTRICAL DRAWINGS (WHERE APPLICABLE) FOR EXTERIOR ELECTRICAL WORK. 33. SEE LANDSCAPE DRAWINGS (WHERE APPLICABLE) FOR SITE IRRIGATION SYSTEM . Know t's UTILITYCONFLICTNOTE.'C1ll before you dig. CAUTION.• THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE ® 1-800-424-5555 POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. t 1 I � -- ---I 5' _,, �. __-.- DRIPLINE- 1. 4-FT HIGHT TEMPORARY CHAIN LINK OR ORANGE PLASTIC FENCE SHALL BE PLACED AT 3' BEYOND THE DRIPLINE OF THE TREE TO BE SAVED. FENCE SHALL COMPLETELY ENCIRCLE THE TREE(S). INSTALL FENCE POSTS USING PIER BLOCKS ONLY. AVOID DRIVING POSTS OR STAKES INTO MAJOR ROOTS. 2. NO ACTIVITIES OR STOCKPILING MATERIALS IS ALLOWED WITHIN TPF, 1 TREE'PROTECTIONDE'TAIL C1.1 NOT TO SCALE is 4 TH IN )E FULL WIDTH DRESS/EGRESS DETAIL NOTES: 1iJ THE MINIMUM LENGTH SHALL BE EXTENDED AS NECESSARY TO ENSURE MATERIAL IS NOT TRACKED OFF SITE AND/OR INTO THE PUBLIC RIGHT-OF-WAY. U2 ATB DRIVEWAY RAMP AND/OR SITE ACCESS ROAD 15' WIDE MIN. SEE TABLE BELOW FOR REQUIRED LENGTH. NOTES: 1. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF PIPING IS IMPRACTICAL A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. 2. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW ING G OF SEDIMENT OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL QUARRY SPALLS AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY MUST BE REMOVED IMMEDIATELY. 3_ WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO LEAVING THE SITE. WHEN WASHING IS USED, IT SHALL BE DONE ON AN AREA STABILIZED WITH QUARRY SPALLS AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 4. INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN. PROJECT SIZE MIN LENGTH OF (FEET) QUARRY SPALLS" < 1/4 ACRE 30 < 1 ACRE 50 < 3 ACRE 100 > 3 ACR€ 100 ► PROVIDE ATB OR ASPHALT TRANSITION WHERE FRONTAGE ROAD IS AN ARTERIAL. LENGTH TO BE DETERMINED BY CITY INSPECTOR. CITY INSPECTION REQUIRE�ON ALL EROSION CONTROL MBEFORE OTHER WORK CAN -°" REVISION DATE STABILIZED CONSTRUCTION JANUARY 2018 CITY OF EDMONDS ENTRANCE PUBLIC WORKS STANDARD DEPARTMENT DETAIL Fs t, 18g Q APPROVED BY: R. ENGLISH E R- 9 0 1 STABILIZED CONSTR UCTION ENTRANCE NOT TO SCALE STD DTL. ER-901 2" x 2" WOOD/STEEL FILTER FABRIC SECURED TO 2" x 2" 14 GA WIRE FABRIC EQUAL NATIVE BACKFILL MATERIAL J 1 8., FILTER FABRIC MATERIAL IN CONTINOUS ROLLS USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE NOTES: 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN AND ENSURE PROPER _ EROSION CONTROL THROUGHOUT PROJECT. CITY INSPECTION REQUIRED ON 2. SILT FENCE TO BE PLACED DOWNSLOPE OF CONSTRUCTION ALL EROSION CONTROL METHODS ACTIVITY. BEFORE OTHER WORK CAN BEGIN REVISION DATE CITY OF EDMONDS FILTER FABRIC FENCE JANUARY 2018 FILTRATION SYSTEMS PUBLIC WORKS STANDARD - DEPARTMENT DETAIL Fsf 1g9� APPROVED BY: R. ENGLISH ER-900 2 FILTER FABRIC FENCE FILTRATION SYSTEMS (71 1 J NOT TO SCALE STD DTL. ER-900 UNDISTURBED PLANTS UNDISTURBED TURF (LAWN) (SEE NOTE 1) AREAS (SEE NOTE 1) III t I�+ :7y�I� gs�I, pIyl'I�fl tlliI,�I11rTjt,,U,I###jGjilll•# UNDISTURBED UNDISTURBED , , 0" illy„ ��, I� iil� lirlil,i ` it�ll(Ii TURF/LAWN/LANDSCAPE NATIVE VEGETATION \''` \� �J��\7 UNDISTURBED NATIVE SOIL \�\'�\�\\�\ '\'r\//v�\/ UNDISTURBED NATIVE SOIL OPTION 1 - NO DISTURBANCE PLANTING BEDS TURF (LAWN) AREAS iIIIII 2" ORGANIC MULCH / �� �� �� yll;;jP1Itllfillrllltl'r�i.,;11.,Ii;'; GRASS: SEED OR SOD 0 _ - I I( -I I -I�-I I -ill I f-I i I I-1=L-I I1=1L-I i I -I I I 011 11=1-�_-_II - I 1I I=I1J-)_i 1=1I 1=J 1=J LI=�_ 3" OF COMPOST IIII�IIIIIIIITI11�1 �I�I�III�I)-III TIIHIIII 1.75" OF COMPOST INCORPORATED INCORPORATED INTO 5" OF W L- INTO 6.25" OF SITE SOIL (TOTAL -i i-=1=L1=1 1LI=L=1 I I-J L 1=1 I iE6E 1=1 SITE SOIL (TOTAL AMENDED II=M--=111-Ij- II 1=ITI=T-III-I�- I II AMENDED DEPTH OF 9.5", FOR A DEPTH OF 9.5", FOR A-1�1--� III )�=T-ill L-L-1 I I-1=1I_I SETTLED DEPTH OF 8") HT_I j1�=-1TI-I 1=1 I1=1 I I -I 11=1LI-ITI=ILL-I I I SETTLED DEPTH OF 8") -III-III (Il-I I =I= LI Ill=W-WI-111=111=11 j-1 I 11=Ti ITT- -11= I -I I I I I -I I I -I 11-111=1 1=1 I =1 I = IF= 1=1111 111=ll011 8" 11�r1I T,�=12=A1=L1= SUBSOIL SCARIFIED 4" BELOW SUBSOIL SCARIFIED 4" BELOW COMP/,. r / / r\,._� � COMPOST AMENDED LAYER 12" BEOLOWASOI,DSUR SURFACE) / \�f r %\ /l\/i {/�\ %% j\� { ( ) ( L E) ��\, � � � ��'� 12" BELOW SOIL SURFACE r r 12 / 1 L OPTION 2 - AMEND IN PLACE OR STOCKPILE AND AMEND GENERAL NOTES: PLANTING BEDS TURF (LAWN) AREAS 1 r rrU3IP ,P I3'i" 4 I i, 1. AREAS OF NO DISTURBANCE N lI All fib{ � SHALL BE FENCED AND EXISTING 2" ORGANICiilupl�i5';�ijyill.ililt'I GRASS: SEED VEGETATION AND SOIL SHALL BE jIIInIi,,{r3r 41,�i41�11II; MULCH �/ r/�/ 011 iI 1 1 OR SOD PROTECTED FROM CONSTRUCTION -II iTl= 11T�-1TI=� - (111I III I1 IMPACTS. I=T=1TI-I�-I-iZi-I 1 I 1=n I-1 11=I=1Iru I-III-11-f1I-111-1 I 1=11 1=1I I -I-T- I 1L=1T1-=W=I=II I II-I-)I=J11= - =1I-11 2. TO MEASURE SETTLED DEPTH, 6" IMPORTED II-�1-I-LL=111--I-jlII� I11-IIJ 6" IMPORTED WATER SOIL SUFFICIENTLY TO TOPSOIL MIX III II -III -I I =I=�1- II-)LI- II-I11=1I -111-I TOPSOIL MIX FULLY SATURATE WITHOUT I -I n-=1T 1=�11=1 1=1 1=LIEl 1=.IT_I (COMPACTED T=lj ll-I 1=1 ((=1�-I III=�I-ILL- 1=1Ll-111=III (COMPACTED CAUSING EROSION. DEPTH) i =III1I1I -%11-\1�= `(11=-= 111==1�Ir. DEPTH) 3. COMPOST SHALL MEET SPEC. �`/��./\/� REQUIREMENTS IN THE 2017 �lis�/\/\\ II�� \\/� II `�\\\\II EDMONDS STORMWATER SUBSOIL IS \a fir/ ✓r r.//\\///, �/ � }` SUBSOIL IS ADDENDUM (CHECKLIST 7). IED 6„ BELOW �\\�x���\\�Y. \/i� /\/,�•,/�/ BEAOW IMPORTED\ 4. COMPACTION OF TOPSOIL (WHERE TOPSOIL MIX i�//\\�/\\%\/ ✓/\� \i" ��// �/ /! REQUIRED) TO BE TO 85% (MAX) /12"�//VVi�A/��A� TOPSOIL MiX OF THE MAXIMUM DRY DENSITY OPTION 3 - IMPORT TOPSOIL PER MODIFIED PROCTOR TEST (ASTM D1557). POST CONSTR UCTION SOIL QUALITY AND DEPTH NOT TO SCALE BLD2021-0812 STD DTL. SD-642 THE 13 ELEMENTS OF TESC BMP ELEMENT #1 - MARK CLEARING LIMITS. LIMIT OF CONSTRUCTION ARE CLEARLY MARKED. ELEMENT 12 - ESTABLISH CONSTRUCTION ACCESS: A STABILIZED CONSTRUCTION ENTRANCE IS SHOWN. ELEMENT 13 - CONTROL FLOW RATES: FLOW IS MINIMAL. ELEMENT 14 - INSTALL SEDIMENT CONTROLS: SILT FENCE, INLET PROTECTION AND MULCH ARE PROPOSED. ELEMENT #5 - STABILIZE SOILS: SOIL STABILIZATION IS ACHIEVED BY MULCHING, PLASTIC COVERING AND SEEDS. ELEMENT #6 - PROTECT SLOPES: SLOPES ARE PROTECTED BY PLASTIC COVERING, MULCHING AND EXISTING VEGETATION. ELEMENT #7- PROTECT DRAIN INLETS: INLET PROTECTIONS ARE PROPOSED FOR THE STORM DRAINS ELEMENT#8 - STABILIZE CHANNELS AND OUTLETS: N/A ELEMENT #9 - CONTROL POLLUTANTS: ALL VEHICLES, EQUIPMENT AND PETROLEUM PRODUCT STORAGE/DISPERSING AREAS WILL BE INSPECTED REGULARLY TO DETECT ANY LEAKS OF SPILLS, AND TO IDENTIFY MAINTENANCE NEEDS AND PREVENT LEAKS OF SPILLS. ELEMENT #10 - CONTROL DEWATERING: THESE WILL BE NO DEWATERING AS PART OF THIS CONSTRUCTION PROJECT. ELEMENT #11- MAINTAIN BMP's: ALL TESC BMPs SHALL BE MAINTAINED AND REPAIRED AS NEEDED. ELEMENT #12 - MANAGE THE PROJECT.• THIS COULD BE ACHIEVED BY MINIMIZING THE EXTENT AND DURATION OF THE AREA EXPOSED AND BY EMPHASIZING EROSION CONTROL THEN SEDIMENT CONTROL. ELEMENT #13 - PROTECT ON -SITE STORMWATER MANAGEMENT BMPS FOR RUNOFF FROM ROOFS AND OTHER HARD SURFACES: N/A. NOTES: 1. ALL DISTURBED AND PERVIOUS AREAS ON AND OFF SITE SHALL BE COMPOST AMENDED TO MEET REQUIREMENT OF BMP T5.13 IN THE STORMWATER MANUAL, VOL V, CHAPTER 5. SEE DETAIL 4/C1.0. 2. INSTALL AND MAINTAIN ALL TESC MEASURES ACCORDING TO APPROVED PLANS, CITY OF EDMONDS STANDARD DETAILS, AND ALL OTHER MEASURES THAT MAY BE REQUIRED URING CONSTRUCTION. 3. EXISTING FAILING, DAMAGED OR NON-ADA COMPLIANT FRONTAGE IMPROVEMENTS (174TH ST S.W.) SHALL BE REMOVED AND REPLACED AS DETERMINED BY THE CITY ENGINEERING INSPECTOR. 4. DRIVEWAY SLOPE NOT TO EXCEED 149. ESC NOTES (ECDC 18.30.050) A. ESC MINIMUM REQUIREMENTS. ALL ACTIVITIES NECESSITATING A CLEARING OR GRADING PERMIT AND ALL UTILITY PROJECTS CONSISTING OF MORE THAN 500 LINEAL FEET OF TRENCH EXCAVATION SHALL BE REQUIRED TO CONTROL EROSION AND SEDIMENT DURING CONSTRUCTION AND TO PERMANENTLY STABILIZE EXPOSED SOIL RESULTING FROM CONSTRUCTION, PROJECTS INVOLVING A CRITICAL AREA MAY ALSO BE REQUIRED TO COMPLY WITH ANY COMBINATION OF THE ESC MINIMUM REQUIREMENTS. COMPLIANCE WILL BE DEMONSTRATED THROUGH THE IMPLEMENTATION OF AN APPROVED ESC PLAN. GUIDELINES FOR PREPARING ESC PLANS ARE PROVIDED IN THE MANUAL. THE PLAN MUST ADDRESS THE FOLLOWING REQUIREMENTS. 1. ESC MINIMUM REQUIREMENT - CONSTRUCTION ACCESS ROUTE. CONSTRUCTION VEHICLE ACCESS SHALL BE, WHENEVER PRACTICAL, LIMITED TO ONE ROUTE. ACCESS POINTS SHALL BE STABILIZED WITH QUARRY SPALLS OR CRUSHED ROCK TO MINIMIZE THE TRACKING OF SEDIMENT ONTO PUBLIC ROADS. IF SEDIMENT IS TRANSPORTED ONTO A ROAD SURFACE, THE ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM ROADS BY SHOVELING OR SWEEPING AND BE TRANSPORTED TO A CONTROLLED SEDIMENT DISPOSAL AREA WITHIN 24 HOURS. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT 1S REMOVED IN THIS MANNER. 2. ESC MINIMUM REQUIREMENT - STABILIZATION OF EXPOSED AREAS. ALL SOILS EXPOSED BY LAND DISTURBING ACTIVITIES SHALL BE STABILIZED BY SUITABLE APPLICATION OF BMPS, INCLUDING, BUT NOT LIMITED TO, SOD, HYDROSEEDING, OR OTHER VEGETATION, PLASTIC COVERING, OR MULCHING. ALL BMPS SHALL BE SELECTED, DESIGNED, AND MAINTAINED IN ACCORDANCE WITH THE MANUAL. THE EXPOSED SOILS SHALL BE STABILIZED ACCORDING TO AN APPROVED TIMETABLE. (TYPICALLY, NO SOILS SHALL REMAIN EXPOSED FOR MORE THAN TWO DAYS FROM OCTOBER 1 THROUGH APRIL 30 AND NO MORE THAN SEVEN DAYS FROM MAY 1 THROUGH SEPTEMBER 30). 3. ESC MINIMUM REQUIREMENT - PROTECTION OF ADJACENT PROPERTIES. ADJACENT PROPERTIES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION BY APPROPRIATE USE OF VEGETATIVE BUFFER STRIPS, SEDIMENT BARRIERS OR FILTERS, DIKES OR MULCHING, OR BY A COMBINATION OF THESE MEASURES AND OTHER APPROPRIATE BMPS. 4. ESC MINIMUM REQUIREMENT - MAINTENANCE. ALL EROSION AND SEDIMENT CONTROL BMPS SHALL BE REGULARLY INSPECTED AND MAINTAINED BY THE OWNER TO ENSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL MAINTENANCE AND REPAIR SHALL BE CONDUCTED IN ACCORDANCE WITH THE MANUAL. 5. ESC MINIMUM REQUIREMENT - OTHER BMPS. AS REQUIRED BY THE CITY, OTHER APPROPRIATE BMPS TO MITIGATE THE EFFECTS OF INCREASED RUNOFF SHALL BE APPLIED. 6. EROSION AND SEDIMENT CONTROL REQUIREMENT - UNDERGROUND UTILITY CONSTRUCTION. THE CONSTRUCTION OF UNDERGROUND UTILITY LINES SHALL SPECIFICALLY ADDRESS THE FOLLOWING: A. EROSION CONTROL FOR EXCAVATED AND STOCKPILED MATERIALS; B. THE PLACEMENT OF EXCAVATED MATERIAL WHERE CONSISTENT WITH SAFETY AND SPACE CONSIDERATIONS SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES; C. TRENCH DEWATERING SYSTEMS (MUST DISCHARGE INTO SEDIMENT TRAPS, SEDIMENT PONDS, OR OTHER ACCEPTABLE MEANS); D. TRACKING AND SPILLING OF MATERIALS ON STREETS DUE TO HAULING; E. DAILY CLEANUP AND STREET MAINTENANCE. 7. ADDITIONAL ESC MINIMUM REQUIREMENTS FOR LARGER DEVELOPMENTS. ALL NEW DEVELOPMENT AND REDEVELOPMENT THAT INCLUDES LAND DISTURBING ACTIVITIES OF GREATER THAN, OR EQUAL TO, ONE ACRE IN ADDITION TO MEETING THE MINIMUM REQUIREMENTS SET FORTH ABOVE SHALL COMPLY WITH ESC REQUIREMENTS LISTED BELOW, 8. ESC MINIMUM REQUIREMENT - DELINEATE CLEARING AND EASEMENT LIMITS. IN THE FIELD, MARK CLEARING LIMITS AND/OR ANY EASEMENTS, SETBACKS, SENSITIVE/CRITICAL AREAS AND THE BUFFERS, TREES AND DRAINAGE COURSES. 9. ESC MINIMUM REQUIREMENT - SEDIMENT TRAPPING. PRIOR TO LEAVING THE SITE, STORM WATER RUNOFF SHALL PASS THROUGH A SEDIMENT POND OR SEDIMENT TRAP, OR OTHER APPROPRIATE BMPS. SEDIMENT PONDS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS, AND OTHER BMPS INTENDED TO TRAP SEDIMENT ON -SITE SHALL BE CONSTRUCTED AS A FIRST STEP IN GRADING. THESE BMPS SHALL BE FUNCTIONAL BEFORE LAND DISTURBING ACTIVITIES TAKE PLACE. EARTHEN STRUCTURES, SUCH AS DAMS, DIKES, AND DIVERSIONS SHALL BE SEEDED AND MULCHED ACCORDING TO AN APPROVED TIMETABLE. 10. ESC MINIMUM REQUIREMENT - CUT AND FILL SLOPES. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. IN ADDITION, SLOPES SHALL BE STABILIZED IN ACCORDANCE WITH ESC REQUIREMENT NO. 2. 11. ESC MINIMUM REQUIREMENT - CONTROLLING OFF -SITE EROSION. PROPERTIES AND WATER WAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM EROSION DUE TO INCREASES IN THE VOLUME, VELOCITY, AND PEAK FLOW RATE OF STORM WATER RUNOFF FROM THE PROJECT SITE. 12. ESC MINIMUM REQUIREMENT - STABILIZATION OF TEMPORARY CONVEYANCE CHANNELS AND OUTLETS. ALL TEMPORARY ON -SITE CONVEYANCE CHANNELS SHALL BE DESIGNED, CONSTRUCTED AND STABILIZED TO PREVENT EROSION FROM THE EXPECTED VELOCITY OF FLOW FROM A TWO-YEAR, 24-HOUR FREQUENCY STORM FOR THE DEVELOPED CONDITION. STABILIZATION ADEQUATE TO PREVENT EROSION OF OUTLETS, ADJACENT STREAM BANKS, SLOPES AND DOWNSTREAM REACHES SHALL BE PROVIDED AT THE OUTLETS OF ALL CONVEYANCE SYSTEMS. 13, ESC MINIMUM REQUIREMENT - STORM DRAIN INLET PROTECTION. ALL STORM DRAIN INLETS MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT STORM WATER 'RUNOFF SHALL NOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. 14. ESC REQUIREMENT - REMOVAL OF TEMPORARY BMPS. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE TEMPORARY BMPS ARE NO LONGER NEEDED. TRAPPED SEDIMENT SHALL BE REMOVED OR STABILIZED ON SITE. DISTURBED SOIL AREAS RESULTING FROM REMOVAL SHALL BE PERMANENTLY STABILIZED. 15. EROSION AND SEDIMENT CONTROL REQUIREMENT - DEWATERING CONSTRUCTION SITES. DEWATERING SYSTEMS SHALL DISCHARGE INTO A SEDIMENT TRAP OR SEDIMENT POND. 16. EROSION AND SEDIMENT CONTROL REQUIREMENT - CONTROL OF POLLUTANTS OTHER THAN SEDIMENT ON CONSTRUCTION SITES. ALL POLLUTANTS OTHER THAN SEDIMENT THAT OCCUR ON SITE DURING CONSTRUCTION SHALL BE HANDLED AND DISPOSED OF IN A MANNER THAT DOES NOT CAUSE CONTAMINATION OF STORM WATER. 17. EROSION AND SEDIMENT CONTROL REQUIREMENT - FINANCIAL LIABILITY. PERFORMANCE BONDING, OR OTHER APPROPRIATE FINANCIAL INSTRUMENTS, SHALL BE REQUIRED FOR ALL PROJECTS TO ENSURE COMPLIANCE WITH THE APPROVED EROSION AND SEDIMENT CONTROL PLAN. (ORD. 3013 § 1, 19951, ENGINEERING DIVISION APPROVED AS NOTED REV. NO. 11 /15/2022 GRADING QUANTITIES. - CUT.• 50 Cu. Yds. FILL: 50 Cu.Yds. (GRADING QUANTITIES WERE CALCULATED USING THE LAND DEVELOPMENT DESKTOP COMPOSITE METHOD. CALCULATIONS DO NOT ACCOUNT FOR SOIL SWELLING AND SHRINKAGE) T E.S. C. LEGEND TEMPORARY CONSTRUCTION ENTRANCE CATCH BASIN INSERT PROTECTION (TYP.) CL CLEARING LIMITS SF SF SILT FENCE MULCH &/OR STRAW MATTING -••- PL PLASTIC COVER FLOW ARROW (EX.) EQUIPMENTAND PROCEDURE LEICA TC 1000 FOR FIELD TRAVERS AND TOPOGRAPHY. MONUMENTS VISITED 1012004 PRECISION EXCEEDS STATE STANDARDS. BM PER SEWER CARD INVERTS ALONG N.W. 68TH ST. FOR NGVD 29 ADD -3.5 TBM EX. SMH RIM = 348.80' I.E. W. 8" = 337.36' I.E. E 8" = 337.38' VERTICAL DATUM: NAVD 88 ENGINEER/CONTACT INSIGHT ENGINEERING COMPANY P.O. BOX 1478 EVERETT, WA 98206 CONTACT.. BRIAN R. KALAB, P.E. PH: (425) 303-9363 EMAIL: INFO®INSIGHTENGiNEERING. NET W1 , , , GREENE LAND SURVEYING 7408 164TH ST SW LYNNWOOD, WA 98087 PH: (206) 498-0979 APPLICANT / OWNER BELMONT AULCK PH: (206) 571-7777 LEGAL DESCRIPTION LOT 3 OF CITY OF EDMUNDS SHORT PLAT NO. S-6-79 AS RECORDED UNDER RECORDING NO. 7905090293, RECORDS OF SNOHOMISH COUNTY AUDITOR. SITUATE IN THE CITY OF EDMUNDS, COUNTY OF SNOHOMISH, STATE OF WASHINGTON. CITY OF EDMONDS APPROVED FOR CONSTRUCTION FOR: , PUBLIC WORKS DIRECTOR DATE I INSIGHT INGINERRING CO. P.O. BOX - 1478 EVERETT, WA 98206 (425) 303-9363 (425) 303-9362 FAX INFO@INSIGHTENGINEEPZING,NET SITE ADDRESS: 7901 240TH ST SW EDMONDS, WA 98026 DESCRIPTION INITIALS DATE TAX ACCOUNT NO.'S: 00452000400800 RESU6 R k Oct 05 2022 DMONDS wAs�� NE 114, SE 114, SEC.31, T.27N, R ,1 PTJ RVICES QUANTUM HOMES Cl) �� �� DWG FILENAME DESIGNED BY: DATE: SCALE: JOB NO.: sI36499 T �gti4 � 180945.DWG SPC 06-09-2022 1 "=20' 18-0945 ONAL SHEET GRADING AND S WPP NOTES AND DETAX S C1.1 NE 114, SE 114, SEC,311 T.27N., R.4E., W.M. SNOHOMISH COUNTY, WASHINGTON ALL SURFACE WATER RUNOFF FROM THE DRIVEWAY SHALL BE DIRECTED (I.E. SLOPE, CURBING, BERM, ETC.) TO THE ONSITE WATER QUALITY SYSTEM INSTALLED WITH THE SHORT PLAT. ACCEPTABLE TIGHTLINE MATERIAL: SDR 35 SCH 40 N-12 F810 HANCOR MAXIMUM DRIVEWAY SLOPE ALLOWED 14% A minimum of 3' separation is required between the dry utilities (power, gas, phone, cable, etc.) and sewer, water, and storm and 5' from any City main lines. Know what's below. Call before you dig. UTILITY CONFLICT NOTE. CAUTION.• THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE @ 1-800-424-5555 POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. W 17ATJ/_VIIII01CAL1:01:11C7 �G G ZO r o �r� s-o � G O� ya N CARL COOK CARL - FND 1/2" r PIPE HELD `l RIP RAP MARK MEONE �, N 88'31 '13" W 127.00' 127' � r-{ CO II .'-- -IE I353,0 -- - - I ------------- I I 332_ _ _ OSED RSIDNCE I _ 1 END BLOCK, - WALL I Cb )OK I ' III I 6' PVC 0 1.5% I IE AT HOUSE =345 7 I 1 12.5' I I I I II f co I 197' v Ln Ca#1 , TYPE 1 RIM:353.38 IE: 349.83 (6" IN, NE) IE: 349.83 (6" IN, SE) IE: 348.63 (12" OUT, E) (n o cr) o 0 o co o - g z o v Lr 0 0 20, 0' ACCESS AND UTILITY 1 1/2" POLY LINE (TYP.) C8 RIM = 363.28' I.E. W. 12" = 361.64' I.E. S.E. 12" = 361.57' G x r 7`ND 1/2" REBAR BENT OVER W 1.0' W - SPH � G 127.00'7/7 ` 28LF 6" PVC S=0.0602 FT/FT I , , 1 W 240 T - ' S ! w ` EX, C/L 0 RO r S rN 88'35'01 " W 513.28' CALC G G S S8''34'17" E CB RIM = 357.39 - - I.E. N.W. 12" = 355.91' SIDE SEWER CONNECTION CB RIM = 348.82' TO MAIN SHALL BE MADE I.E. E. 12" = 355.15' VIA WYE CONNECTION. CONNECTION SHALL BE A MIN 6' FROM THE SEWER MANHOLE 1------ I I a 3; <I I I I G11 CI ' ^ I I 11 ° I PROPos ESIO I , 1 ^ 1 + ' NTR 0- I' I CP j4 3 CO r' `k Ln w `< E �353.01 I 6' PVC 0 2%--,, lr I ' U ; ; 1E, AT HO $E !344.40 1 20' ca 1ACCESS +-, o SEMEN k PERK FILTER. T,!-18" CARTRIGE "'RlM:350.17 1 I z IE: 347,06 (12' 1N, W) ' IE: 345,26 12" OUT E FIRE APPARATUS , FND 1/2" REBAR W/CAP W 0. 40' OF \ CALC. CORNER IS" ROOF OVERHANG C PVC ROOF DRAIN (TYP.) F i f I ' I I I I I -345. VO " (sit FOOTING DRAIN CONNECTION SHALL OCCUR A MINIMUM OF 10' FROM THE STRUCTURE. CONNECT FOOTING DRAIN AND ROOF DRAIN SEPARATELY TO STORM IE=343.60 SEWER CLEANOUT REQUIRED WITHIN 2' OF THE STRUCTURE. SSCO#4, RIM: 349.27 0 IE: 345.21 (6"PVC In W) IE: 345.21 (6"PVC OUT, SE) ----CONNECT SEWER TO EXISTING CLEAN SCALE: 1" - 20' OUT. REMOVE OLD PIPE IE=345.2i 4LF 6" SS S=0.0207 FT/FT 20 10 0 20 40 � 15 TY 5SCO#3, � � RIM: 349 CO3 6"PVC 1n NW) IE=343.00 i - IE*: 345.13 (6 "PVC OUT, S) I CONNECT FOOTING AND ROOF DRAIN 18" ROOF i i i PARCEL 27 gSEPARATELY TO STORM If the rim to invert elevation exceeds OVERHANG SALEA LIE=341.84 5-feet then a type II manhole will be 1 yD required. I CO I I ' RIM: 345.85 IE=342.50 I i IE: 341.80 6" IN 1 ^ IE: 341.75 6" OUT 15LF 6° PVC @ 20% I ' CONNECT SEWER TO EXISTING PIPE STUB AT MAIN 1 AND ADD CLEAN OUT. REMOVE OLD PIPE 21L 6" SD @ 13.73% IE=343.90 I i I YO RIM: 346.42 IE.3�8(T$R) '+ I I ' 1 : 338.89 6" IN IE: 338.87 6" OUT lE=343.00 INFILTRATION SYSTEM _ I I + � yM i I o 25'x31 'x 17' DEEP BOTTOM=320..00 - - - I 1 71 ' V YD (OVERFLOW) a � VI,IY-nIIVVlYU ' I RIM: 350.70 �: �' I I I ' o RIM.-346.49 � IE: 343.70 6" 1N/ i �, _ CO - i ' ' _ �; !E: 335.20 6" IN + IE: 335.51 6" OUT 1 E=343.0 I I I TD IE 339.40 6" OUT U) 18" ROOF I OVERHANG i i i i CONNECT FOOTING AND R00 DRAIN 4 9LF 6" SD @ 12.00% SEPARATELY TO STORM a CO 1 i i I 1 I fE=341.84 c� E= 53.00' I ROPOSE'D SIDENC ' l ' i WOOD FENCE 20. 0' I I 1 CO 0 n l � ON PROPERTY LINE , F I + LQ IE=342.50 AND ENCROACHES 02' a 12 I I I C,0 I 0.2' 18.5' " 6' INC 0 2% y, 4 8LF 6" PVC IE AT�HOu,S � 342.3611 i I I PARCEL 27043100403400 h `d qo I ' 1 I 1 42.5 ' + GREGORY & MARY ANNE C JOHNSON I ' IE=34 .00- ----------CONNECT TO EXISTING SEWER CLEAN OUT �� _ CO IE=353.00 I I 1 - - - - - - - ' 12T - (0+95) -- i lE.344.47( I 11 SSCO#2, RIM: 347.99 T - ' IE 341.84 (6 PVC IN, W) 127DIM, I I d 1 I u� ' i if 18" ROOF CO _ �; I I CO �, c�i `aOVERHANG 1E=344.50 ! o 68LF 6" SD @ 1.89% IE=353.00 1 1 Q `T' _ - - ---I- ------ - - ---- 1 I �I I. PARCEL 27043100401400 DEBORAH KING M 4 119' I! PQ OSED RESIDENCE I i I CONNECT FOOTING AND ROOF DRAIN G I I 1 ' ' I I 15' UTILITY 1 a SEPARATELY TO STORM 1 a l ' LOT 1 EASEMENT IE=343.10 ^ i TOP OF BANK I I I I I I ! I 1j I YD CO I I 1 I I i i i RIM: 346.48 a IE=353.00 IE343.16 6" 1N IE: 342.99 6" OUT 6' PVC 02R' ;WA'AR T RAIN ) s: 1 ; I 1E AT HOUSE=340.80 ' 2 ' NNECT SEWER TO EXISTING PIPE STUB AT TO YARD RAN S J8` I I I - - _ - MAIN AND ADD CLEAN OUT. REMOVE OLD PIPE C.O. (TYP.) 1Emr340.50 YD W/ GRATED LID - _ IE.349 63(TBR) IE=344.70 - BRIM=353.75 s;1�= 52.25 LANDSCAPE N I ^` RETAININC\WALL I � CONC. ENCROACHES o 127' , 14 SSCO#1, RIM: 351.39 IE. 339.66 (67PVC In N) o C. 339.66 (6 PVC OUT, S) FOUND 5/8" REBAR - - W/WEI CAP HELD POSITION OF 8" DI WATER MAIN w _-IE: 337.98 0 - SMH RIM = 348,80' _ I.E. W. 8" = 337.36 I.E. E. 8" = 337.38' BLD2021-0812 QU4NTUMH01►�1�'S 0 LEGEND EXISTING MONUMENT (AS SHOWN) PoO�] SECTION 1/4 CORNER NOT FOUND SECTION CORNER NOT FOUND FOUND REBAR/CAP OR I.P. (IRON PIPE) (C) CALCULATED (P) PLAT (M) MEASURED TBR TO BE REMOVED R. 0. W. RIGHT-OF-WAY P.O.B. POINT OF BEGINNING q, CENTERLINE CIF CHAIN LINK FENCE WDF WOOD FENCE W. S. WATER SURFACE EOP EDGE OF PAVEMENT B04V BACK OF WALK u C8 STORM DRAIN CATCH BASIN (CB) STORM DRAIN MANHOLE (SDMH) SD A minimum of 2' of cover is required for all pipes O SS SANITARY SEWER MANHOLE (SSMH) located under driveable surfaces and 1' of cover C SANITARY SEWER CLEAN OUT (CO) under landscape areas. G P POWER POLE -CIGP GUY POLE O WM WATER METER D< WATER VALVE WV PM MAILBOX �- -- UTILITY POLE ANCHOR FIRE HYDRANT (2 NOZZLE) TYPE I NGPA SIGN PROPOSED WATER PROPOSED SANITARY SEWER PROPOSED STORM DRAINAGE PROPERTY LINE X X EXISTING FENCE LINE EDGE OF PAVEMENT - - - - - - XXX EXISTING CONTOURS PROPOSED CONTOURS PRE-EXISTING DRAINAGE PATTERN T PROPOSED COMMUNICATION C PROPOSED CABLE P PROPOSED POWER SS SANITARY SEWER LINE SD STORM DRAIN LINE OHP OVERHEAD UTILITY LINES G GAS LINE PROVIDED ON CIVILS; HOWEVER DRAINAGE REPORT SUPERCEDES ALLOWED IMPERVIOUS SURFACE CALCULATIONS. I . ALLOWED PROPOSED LOT# LWFERWOUSPER DOPERVIOUS SHORTPLAT 1 3,150 SF 2,856 SF 2 3,150 SF 2,670 SF 3 3,150 SF 2,926 SF 4 3,150 SF 2,754 SF TOTAL 12,600 SF 11,206 SF 12,600 + 6,690 (SHARED ACCESS) = 19,290SF (SP CIVIL PLAN TOTALS) 11,206 + 6,690 = 17,896SF (SFR PLAN TOTALS) DRAINAGE REPORT ALLOWED FOR = 18,813SF (APPROVED DRAINAGE REPORT) ENGINEERING DIVISION APPROVED AS NOTED 11 / 15/2022