APPROVED ENG RESUB1 BLD2022-0439+Water_Availability_Certificate+11.8.2022_10.16.34_AM+3208824RESUB
Nov 08 2022
BLD2022-0439
CITY OF EDMONDS
of EDA4. DEVELOPMENT SERVICES
DEPARTMENT
WATER AVAILABILITY APPLICATION
r
Complete and submit this form through www.MyBuildingPermit.com.
"NC, i S'�
SECTION A
Applicant Information
Contact/Applicant Name Forrest Murphy
Phone Number 206.256.9886
Email forrest@castarchitecture.com
Address 115-C North 36th Street
City Seattle
State WA
Zip 98103
Property Information
Project Name Angle Residence
Associated Permit Number BLD2022-0439
Address 15724 72nd Ave W
City Edmonds
State WA Zip 98026
Parcel No. 00513100002601
Does the property currently have water service? ❑ Yes (City of Edmonds water) No
Describe project (number of buildings, number of units, number of stories per building):
A new 2-story single family residence with a detached garage and basement.
In what phase is the project? RECEIVED
❑ Design Review L9� Building Permit OCT 14 2022
❑ Preliminary Plat ❑ Rezone or Other
Associated permit application numbers if applicable: BLD2022-0439 CITY E EDMONDS
p pp O, pp DEVELOPMENT
SERVICES DEPARTMENT
SECTION B
9 Applicant certifies that this project is a single-family residence, multi -family project of four units or
less with combo water/fire lines, or short plat subdivision (four single-family lots or less), in which case
completion of a full utility availability study shall not be required. Please sign below and submit this form
through www.MyBuildingPermit.com.
Note: Applicant requested a utility availability study for the SFR.
XFor all other permit types, a utility availability study is required and associated fees will be due. Please
submit the complete application through www.MyBuildingPermit.com.
APPLICANT SIGNATURE: /1 _1 V V-- DATE: 04/11 /2022
APPLICANT PRINTED NAME: Forrest Murphy
Form Updated 12/9/2021
SECTION C
1. V a. Water will be provided by service only to an existing 8" ductile iron
(size) water main that is 30 (feet) from the site.
OR
❑ b. Water service will require an improvement to the water system of:
❑ (1). feet of water main to reach the site; and/or
❑ (2). The construction of a distribution system on the site; and/or
❑ (3). Other (describe)
2. V a. The water system is in conformance with a City approved water comprehensive plan.
OR
❑ b. The water system improvement will require a water comprehensive plan amendment.
(This will cause a delay in permit issuance and approval.)
3. V a. The proposed project is within the corporate limits of the City, or has been granted
Boundary Review board approval for extension of service outside the City, or is within the City approved
service area of a private water purveyor.
OR
❑ b. Annexation or Boundary Review Board approval will be necessary to provide service.
4. IV a. Water is/or will be available at the rate of flow and duration indicated below at no less than
20 psi - Measured at the nearest fire hydrant 30 feet from the building/property (or as marked on
attached map)
Rate of Flow
❑ Less than 500 gpm. (approximately_
❑ 500 to 999 9Pm
❑ 1500 gpm or more
❑ Flow test of
❑ Calculation of 1561
OR
Duration
❑ Less than one (1) hour
❑ One (i) to two (2) hours
❑ Two (2) hours or more
❑ Other
(Commercial building permits require flow test or
calculation)
❑ b. Water system is not capable of providing fire flow.
Comments/Conditions:
Per model, static pressure is 145.18 psi
At 1000 gpm, pressure is 88.82 psi
At hydrant available flow of 1561 gpm, pressure is 21.23 psi
I hereby certify that the above information is true. This certification shall be valid for one year from the date of signature.
City of Edmonds - Engineering
Russell Lynch
(Agency Name
(Signatory Printed Name
(Signature/Date)
Associate Engineer
(Title)
�,-
Z 2-
Form Updated 12/9/2021