APPROVED STM RESUB3 BLD2022-0750+Storm_Drainage_Report+6.8.2023_2.03.24_PM+3597790RESUB Jun 09 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT STORMWATER REPORT CITY OF EDMONDS For Abedalla Residence 7815 202nd PI SW Edmonds, WA 98026 May 31, 2023 W co o T .10 ,Q 39374 �I ST6R�,tl�' SSION Prepared By: Edward Mecum Jared Foulk Prepared For: Niran Abedalla 10951 SE 162nd St Bellevue, WA 98006 Civil Engineering & Development Services 1375 NW Mall St, STE 3; Issaquah, WA 98027 (425) 821-5038 Email: Info@G2CIVIL.COM COMPLIES ST RMWATWITH APPLICABLECODE CITY STORMWATER CODE 06/16/2023 Niran Abedalla Technical Information Report TABLE OF CONTENTS A. Project Overview.................................................................................................1 B. Minimum Requirements....................................................................................4 FIGURES Figure 1: Vicinity Map Figure 2: Soils Map Figure 3: Flow Chart for Determining Requirements for New Development APPENDICES Appendix A: Riley Group Infiltration Assessment 5/31/2023 Niran Abedalla Technical Information Report A. Project Overview Existing Conditions The site is located at 7815 202nd PI SW in Edmonds, WA, Tax Parcel No. 00401300000400. The property is 7,216 SF (approximately 0.17 AC) and bordered to the north, east, and west by single- family residences and to the south by 202nd PI SW. The project site slopes from northwest to the southeast at an average grade of approximately 1%. The downstream receiving system is Pine Ridge Park Creek and ultimately Puget Sound. The site is currently developed with a single-family residence, shed, and is vegetated with lawn areas, shrubs, and a few trees. The site is accessed from an existing driveway from 202nd PI SW. The site soils are mapped as Alderwood-Urban land complex, 8 to 15 percent slopes. Runoff from the site sheet flows to the south into a roadside swale located on the northern portion of 202nd PL SW. Proposed Conditions The project incorporates the construction of on and off -site infrastructure to support the construction of a new single-family residence. The new residence will access in the existing driveway location on 202nd PI SW via a new 20' wide pervious concrete driveway. The proposed site areas are provided below. Summary of Proposed Site Improvements: Surface Type Area (SF) Onsite Roof 2,624 Total Impervious: 2,624 Pervious Driveway 516 Pervious Walkways 113 Total Area: 3,253 1 5/31/2023 Niran Abedalla Technical Information Report Figure 1: Vicinity Map m 3 199th St SW • Q i 199th St SW I- -TIT _ ootn St sw I —2orsrst-sw � Q 201 st PI • tp a `� 3 SITE I 202�; St Sw 202nd PI SW i s sw oafd- t-sw 203rd St SW 1". 2041h St SW E EET H l 3f If ?p4th PI SW Q 3 6 I 3 + 205Mi StSW q a ---- `}--. �\ d Ike yA5h PI SW I 2061h St S 206yt St SW ' f H:�Lj f 2 5/31/2023 Niran Abedalla Technical Information Report Figure 2: Soils Map 4 w r rl' gills, 40 1 � S- - .-"' k Snohomish County Area, Washington (WA661) — " Snohomish County Area, Washington O (WA661) Map Acres Percent of Unit Map Unit Name in AOI AOI Symbol 5 Alderwood-Urban 0.5 100.0% land complex, 2 to 8 percent slopes Totals for Area of 0.5 100.00/0 Interest 3 5/31/2023 Niran Abedalla Technical Information Report B. Minimum Requirements The existing impervious surface coverage is less than 35%, therefore the project is classified as new development. The Department of Ecology's Figure 1-2.4.1: Flow Chart for Determining Requirements for New Development (Figure 3, page 7) was utilized to determine the project requirements relative to stormwater management. The project adds less than 5,000 sq. ft. of new impervious surface but more than 2,000 sq. ft. of new plus replaced impervious surface, therefore minimum requirements 1 through 5 apply to the project. Implementing Minimum Requirements #1- #5 Minimum Requirement No. 1— Preparation of Stormwater Site Plan A stormwater site plan is included in the permit submittal. Minimum Requirement No. 2 — Construction Stormwater Pollution Prevention Plan All new development and redevelopment projects in which new, replaced, or new plus replaced impervious surfaces total 2,000 square feet or more, shall comply with Construction SWPPP Elements #1 through #13. A CSWPPP has been incorporated into the Stormwater Site Plans. Element 1— Mark Clearing Limits — Clearing limits at the property lines will be delineated with silt fence and orange construction fencing. Element 2 — Establish Construction Access — The existing driveway will provide adequate access during construction, however a quarry spall construction entrance will be provided. Element 3 — Control Flow Rates — Given the existing topography and small scope of work, there will be minimal flows generated during construction and flow rates will not be controlled. Element 4 — Install Sediment Controls— Silt fencing will be constructed and is expected to provide construction stormwater sediment control during construction. Element 5 — Stabilize Soils — Stockpiled or unworked soils will be protected during construction by covering with plastic or temporary or permanent seeding. All exposed soils will be landscaped or seeded at the conclusion of the project. Element 6 — Protect Slopes — Cut/fill slopes are not anticipated but if necessary will be protected as required. Element 7 — Protect Drain Inlets — The existing and newly constructed conveyance system inlets will be protected during construction if warranted. Element 8 — Stabilize Channels and Outlets — There are no existing or proposed surface channels or outfalls. 4 5/31/2023 Niran Abedalla Technical Information Report Element 9 — Control Pollutants — The small size of this project will limit the opportunity for discharge of pollutants. Waste/demolition debris will not be stockpiled, fueling will be done off - site and concrete trucks will be washed out off -site. Element 10—Control De -watering— De -watering is not anticipated, as construction will take place during the dry season. Element 11 — Maintain BMPs — BMPs will be maintained as necessary to assure continued functioning. Element 12 — Manage the Project — An inspector (sites less than 1 acre) will be present or on call to ensure BMPs are maintained and assess effectiveness of ESC measures. Rainy season requirements will be implemented if necessary. Element 13 — Protect Low Impact Development BMPs —The locations of the proposed infiltration trench in the rear of the house and permeable pavement for the driveway, walkway and rear slab shall be protected from compaction to the maximum extent feasible during construction. Orange construction fencing shall be provided around the location for the proposed infiltration trench. Minimum Requirement No. 3 — Source Control of Pollution S411— BMPs for Landscaping and Lawn/Vegetation Management will be implemented. Minimum Requirement No. 4— Preservation of Natural Drainage Systems and Outfalls The natural drainage pattern for the site will be maintained. The surface runoff from the proposed impervious surfaces will be collected and routed to an onsite infiltration trench. Minimum Requirement No. 5 — On -Site Stormwater Management The project triggers Minimum Requirements #1-5 therefore, On -Site Stormwater Management BMPs from List #1 will be implemented to the maximum extent feasible. Please see below for the feasibility evaluation of the BMPs from List #1 by surface type. Lawn and Landscaped Areas: 1. Post Construction Soil Quality and Depth — This BMP is feasible and will be implemented per City of Edmonds Standard Detail SD-642 for all disturbed and converted vegetated areas. Roofs: 1. Full Dispersion and Downspout Full Infiltration Systems — Infiltration is feasible and will be implemented for the proposed roof area per City of Edmonds Standard Detail SD-636 and Department of Ecology BMP T5.10A. 2. Raingarden or Bioretention — N/A, all impervious areas have been mitigated. 3. Downspout Dispersion Systems — N/A, all impervious areas have been mitigated. 4. Perforated Stub -out Connection — N/A, all impervious areas have been mitigated. 5 5/31/2023 Niran Abedalla Technical Information Report Other Hard Surfaces: 1. Full Dispersion — Infeasible. The minimum flow path length of 100 LF cannot be met. 2. Permeable Pavement, Rain Garden, or Bioretention —Permeable pavement is feasible and will be implemented for the proposed walkway and driveway. 3. Sheet Flow Dispersion — N/A, hard surfaces will be mitigated with permeable pavement. Summary — Post construction soil quality and depth will be implemented for all proposed pervious areas. Downspout full infiltration will be implemented for the proposed roof area and permeable pavement will be used for the proposed walkway and driveway. Infiltration Trench Sizing: A review of the site soil conditions was conducted by Riley Group. Per the geotechnical investigation, the soils on the site are conducive to infiltration and characterized as outwash sands and gravel. Therefore, an infiltration trench is proposed and will be located along the northwest of the project site. Refer to Appendix A: Riley Group Infiltration Assessment for additional soil information. Per Volume III, Section 3.1.1 — Downspout Full Infiltration Systems (BMP T5.10A) of the DOE Manual, for sites with medium sand, 30 LF of trench is required per 1,000 SF of roof area. This is equivalent to 90 CF of trench per 1,000 SF of roof area (30 LF x 2' Wide x 1.5' Deep = 90 CF). Therefore; Roof Area = 2,624 SF Required Infiltration Trench = 90 CF x (2,624 SF / 1,000 SF) = 236.2 CF Proposed Infiltration Trench = 40' Long x 4' Wide x 1.5' Deep = 240 CF 6 5/31/2023 Niran Abedalla Technical Information Report Figure 1-3.1: Flow Chart for Determining Requirements for New Development Raft Hen Does the Site have 35"K or more of amr, 'g hard surface coverage? Does the Project result in 5,000 square feet, a greater, of new plus replaced hard surface area? Yes All Minimum Requirements apply to the new and replaced hard surfaces and converted vegetation areas. Yes See Redevelopment Project Thresholds and the Fgure *How Chart for Peferntirtatg Requirements For Redevwbpmen . Does the Profed convert i; acres or more of vegetation to lawn or landscaped areas, or o corrmt 2.5 acres or more of native vegetation to peshre? No /You$ Does the Project result In 2,000 :yu.t•e feet, or greater, of new plus rcplaoed hard surface area? �No Minimum Rsquirw ants #1 through 45 apply to the new and replaced hard surfaces and the land disturbed. Does the Proliect have land disturbing aairrties of 7,000 Yes square feet or greater? No Minimum Requirement 42 applies. —� Flow Chart for Determining Requirements for New Development DEPARTMENT OF Ruossed Mach `Ju ECOLOGYP1. gowboprtgfv riftVkr copyrigM not co uxd i.dng parmaxince. state of washinglonj limllabon of liability and CW*r w 2019 Stormwater Management Manual for Westem Washington Volume 1- Chapter 3 - Page 89 5/31/2023 Niran Abedalla Technical Information Report C. Off -Site Analysis Project Name: Niran Abedalla Site Address: 7815 202nd PL SW King County Tax Parcel: 00401300000400 Adopted Basin Plan: The site is located within the Kelsey Creek Drainage Basin. Upstream Tributary Area: There are no significant areas tributary to the site. Downstream Analysis: A field review of the downstream conditions was performed on November 21, 2021. The weather was cloudy, and the temperature was approximately 60 degrees. A visual reconnaissance was performed utilizing information obtained from the City of Edmonds GIS Mapping and the on -site survey. Please refer to the storm drainage mapping exhibits that follow for a depiction of the downstream drainage conditions. Site Photo 5/31/2023 Niran Abedalla Technical Information Report Runoff from the site currently sheet flows to the southwest towards 202"d PI SW where it enters the existing public conveyance system approximately 130 feet west of the site. The existing conveyance system within 202"d PI SW directs runoff to the west via a series of catch basins and closed pipes for 615 feet. Runoff is then redirected north along 81s' Ave W for 145 feet, then west through residential areas for 550 feet to 202"d PI SW. Runoff then continues west along 202"d PI SW for 195 feet, then south along 83rd Ave W for 300+ feet and the end of the downstream analysis. The field reconnaissance was terminated as the % mile point analysis was met. Downstream Concerns & Effects of Proposed Project: Developed runoff generated from the developed site will be collected, infiltrated and conveyed via overflow to the existing public conveyance system within 202"d PI SW. The downstream appears capable of conveying the release rates associated with the project. Significant impacts to the downstream system are not anticipated, as no signs of drainage related problems were observed during the field reconnaissance. 9 5/31/2023 Niran Abedalla Technical Information Report ,Mi 10 9 R Riley Group Infiltration Assessment