Loading...
REVIEWED-RESUB3 BLD2022-0750+Structural_Calculations+6.8.2023_1.55.11_PM+3597728Structural Calculations Project: Alshaibani Address: 7815 202nd Pl SW Edmonds, WA DATE: July 2021 AMINIAN & ASSOCIATES PLLC TEL: 206.310.2020 General Structural Notes CODE: IRC 2018 / IBC 2018 for structural design Lateral design per ASCE 7-16with IBC amendments DESIGN LOADS: ROOF FLOOR STAIRS WIND SPEED WIND EXPOSURE TOPOGRAPHIC FACTOR SEISMIC DESIGN CATEGORY R= 6.5 Wood Shear Wall System Ss (USGS Haz Map) S1 (USGS Haz Map) SOIL Actual PSF DEAD LOAD 25 PSF LIVE LOAD (SNOW) Actual PSF DEAD LOAD 40 PSF LIVE LOAD 100 98 MPH BASIC WIND SPEED B 1.0 D/D2 1.3 0.5 1500 PSF ALLOWABLE ASSUMED FOUNDATIONS: EXTEND FOOTINGS TO UNDISTURBED SOIL. CONTACT SOIL ENGINEER IF SOIL IS EXPANSIVE OR QUESTIONABLE. BOTTOM OF EXTERIOR FOOTINGS SHALL BE 1'6" MIN. BELOW OUTSIDE FINISHED GRADE. EXISTING FOUNDATIONS SHALL BE WITHOUT ANY LARGE CRACKS AND SETTLEMENTS. CONTACT THE ENGINEER WHERE QUETIONABLE. COMPACTED FILL: SHOULD CONSIST OF PREDOMINANTLY WELL -GRADED, GRANULAR SOIL, FREE OF ORGANIC MATERIAL AND DEBRIS. FILL SHOULD BE PLACED IN MAXIMUM 8" LOOSE LIFTS AND COMPACTED TO A MINIMUM OF 95 PERCENT OF THE MAXIMUM DENSITY AT OPTIMUM MOISTURE CONTEND DETERMINDED BY ASTM D-1557 TEST PROCEDURES. CONCRETE: fc=2500 PSI* MINIMUM 5-1/2 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE. MAXIMUM SLUMP IS 4". SEGREGATION OF MATERIALS TO BE PREVENTED. SAW CUT CONTROL JOINTS FOR SLAB ON GRADE ASAP AT A MAXIMUM 15SPACING. *ASSUMING 3000 PSI WILL BE ACHIEVED WITH 51/2 SACKS for exposure. NO SPECIAL INSPECTION IS REQUIRED. REINFORCING STEEL: #5 BARS AND LARGER SHALL BE GRADE 60 DEFORMED BARS, AND #3 AND #4 BARS MAY BE GRADE 40, IN ACCORDANCE WITH ASTM A-615. LAP CONTINIOUS BARS 50 DIA. MINIMUM, UON. PROVIDE CORNER BARS FOR ALL WALLS (2' BEND). WELDED WIRE FABRIC SHALL CONFORM TO ASTM A-185 AND SHALL BE 6X6 — W1.4 X W1.4 LAB ONE FULL MESH AT SPLICES. CONCRETE COVER TO REBAR TO BE: FOOTING: 3" FROM SOIL FORMED SURFACES: 1 '/2" WEATHER FACE 3/4" INTERIOR FACE ROOF TRUSSES: SHALL BE DESIGNED IN ACCORDANCE WITH THE T.P.I. AND IBCO STANDARD. LOADS SHALL BE PER STRUCTURAL DRAWINS, TRUSSES CONNECTED TO INTERIOR SHEAR WALLS SHALL BE DESIGNED FOR LATERAL SHEAR PLUSS THE GRAVITY LOADS. TRUSSES SHALL BE CONNECTED TO EXTERIOR WALLS WITH MIN. OF A H2.5 CLIP AT EACH TRUSS. TIMBER: BEAMS AND POSTS (4X_AND GREATER) DF-L #2 OR BETTER STUDS HF#2 / STUD OTHER LUMBER HF#2 OR BETTER Glulam (24F-V4) DF (Fb= 2400 PSI) Glulam Post Treated to refusal DF (FB= 2200pis min.) 2X TIMBER KILN DRIED. GRADES SHALL CONFORM TO 'WWPA GRADING RULES FOR WESTERN LUMBER, LATEST EDITION." WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED. MISCELLANEOUS CONNECTIONS TO BE SIMPSON STRONG -TIE OR APPROVED EQUAL. NAILS SHALL BE COMMON WIRE NAILS. All FASTNERS IN CONTACT WITH PRESSURE TREATED MATERIAL SHALL BE HOT DIPPED GALVANIZED. ALL BOLTS SHALL CONFORM TO ASTM A307. PROVIDE WASHER UNDER THE HEAD AND NUTS OF ALL BOLTS AND LAG SCREWS BEARING ON WOOD. SEE STAILESS STEEL REQUIREMENTS ON PLANS. EXISTING LUMBER SHALL BE SOLID WITHOUT ANY DRYROT. CONTACT THE ENGINEER IF QUESTIONABLE. ENGINEERED LUMBER: EACH PIECE SHALL BEAR A STAMP OF THE MANUFACTURER, GRADE, THE NER, OR ICBO REPORT NUMBER AND THE QUALITY CONTROL AGENCY BEAMS LAMINATED VENEER LUMBER (LVL) Fb = 2600 PSI E = 1900 KSI Fv =285 PSI PARALLEL STRAND LUMBER (PSL) Fb = 2900 PSI E = 2000 KSI Fv = 290 PSI ALL PLUS DESIGNATED PARALLAM AND SIMILAR SHALL BE OF TREATED MATERIAL RESISTANT TO DECAY. ENGINEERED I JOISTS: SHALL BE FURNESHED AND INSTALLED PER MANUFACTURERS' RECOMMENDATION. ALL NECCEASSRAY BRACING, BLOCKING STIFFERNERS ETC. SHALL BE DETAILED BY THE MANUFACTURER. DESIGN SHOWN ON THE DRAWINGS IS BASED ON TRUS-JOISTS, NER 200. SHEAR WALL FRAMING: EXTERIOR WALLS TO BE SHEATHED WITH 15/32" CDX PLYWOOD, BLOCKED SOLID. SEE SHEAR WALL SCHEDULE AS NOTED ON THE PLANS. UON, NAILS SHALL BE 8d @ 6" O.C. AT PANEL EDGES AND 8d @ 12" O.C. FIELD TO STUDS SPACED @16" O.C. See shear wall schedule for additional requirements. ROOF DIAPHRAGM: APPLY'/2" CDX PLYWOOD (32/16) ON ROOF, NAIL WITH 8d @ 6" O.C. AT SUPPORTED EDGES AND 8d @ 12" O.C. AT INTERIOR SUPPORTS, BLOCKING NOT REQ'D. LION. FLOOR DIAPHRAGM: APPLY 3/" MIN. CDX APA RATED PLYWOOD (24/16) EXPOSURE 1 OR EXTERIOR GLUE, GLUED AND NAILED TO FLOOR FRAMING MEMBERS WITH 10d COMMON WIRE NAILS AT 6" O.C. AT ALL SUPPORTED EDGES AND WITH 10d COMMON WIRE NAILS @ 12" OC. AT INTERIOR SUPPORTS NAILING: ALL NAILS SPECIFIED ON THE DRAWINGS ARE DESIGNED TO BE HOT DIP GALVENIZED COMMON OR POWER DRIVEN NAILS. MINIMUM NAIL DIAMETER AND LENGHTH SHALL BE AS FOLLOWS: SHEATHING NAILS: 8D 0.131 X 21/4 10D 0.148 X 21/2 FRAMING NAILS: 10D 0.148X3 16D 0.162X31/4 EPDXY ANCHOR: ALL EPDXY SHALL BE DISPENSED BY THE DUAL CARTRIDGE OR GLASS CAPSULE METHOD TO INSURE PROPER MIXING. CLEAN OUT ALL HOLES WITH COMPRESSED AIR BEFORE FILLING. SPECIAL INSPECTION REQUIRED PER DRAWINGS. EXPANSION ANCORS: SHALL HAVE APPROVAL REPORT BY ICC ES FOR POST INSTALLED CONCRTE ANCHORS AND SHALL BE INSTALLED AND INSPECTED PER THE REPORT REQUIREMNETS. INSPECTIONS: Special inspection and/or structural observation may be required by the local jurisdiction. NOTIFY BUILDING DEPARTMENT FOR STANDARD BUILDING DEPARTMENT INSPECTIONS AS REQUIRED BY LOCAL ORDINANCE. CONTRACTOR: CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUTIONS AND METHODS, TECJNIQUES, SEQUENCES AND TEMPORARY BARCING FOR THE STRUCTURAL SYSTEM AND COMPONENTS TO PERFORM THE WORK. CONTRACTOR SHALL REPORT ANY DESCREPANCIE TO THE ENGINEER IN WRITING DURING BIDDING PROCESS. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION; SIMILAR DETAILS SHALL BE USED WHERE CONDITIONS ARE SIMILAR IN CHARACTER, SUBJECT TO APPROVAL BY THE ARCHITECT OR THE ENGINEER. ALL STRUCTURAL SYSTEMS AND COMPENENTS SHALL FOLLOW THE SUPPLIERS GUIDLINE DURING DELIVERY, STORAGE AND ERECTION. THE CONTRACTOR SHALL VERIFY DIMENSIONS AND CONDITIONS AT JOB SITE. PRE -FABRICATED ITEMS TO BE HANDLED AND INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. F O R T E W ER JOB SUMMARY REPORT Alshaibani Level Member Name Results Current Solution Comments Floor: Joist Passed 1 piece(s) 11 7/8" TJI@ 210 @ 16" OC Floor: Drop Beam Passed 1 piece(s) 4 x 12 DF No.2 Copy of Floor: Drop Beam option Passed 1 piece(s) 3 1/2" x 9 1/2" 2.0E Parallam@ PSL Roof Member Name Results Current Solution Comments Header 1 Passed 1 piece(s) 4 x 10 DF No.2 RB-I Passed 1 piece(s) 3 1/2" x 9 1/2" 2.0E Parallam@ PSL RB-2 Passed 1 piece(s) 3 1/2" x 9 1/2" 2.0E Parallam@ PSL ForteWEB Software Operator Job Notes Kaveh Aminian Aminian and Associates pllc (206) 310-2020 aminian@comcast.net A 6/1/2023 9:38:03 PM UTC ForteWEB 0.5 Weyerhaeuser File Name: Alshaibani Page 1 / 7 aFORTEWEB' Level, Floor: Joist 1 piece(s) 11 7/8" THO 210 @ 16" OC PASSED F All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal. Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (Ibs) 602 @ 2 1/2" 1134 (2.25") Passed (53%) 1.00 1.0 D + 1.0 L (All Spans) Shear (Ibs) 589 @ 3 1/2" 1655 Passed (36%) 1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-Ibs) 2554 @ 8' 9 1/2" 3795 Passed (67%) 1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in) 0.304 @ 8' 9 1/2" 0.343 Passed (L/677) 1.0 D + 1.0 L (All Spans) Total Load Defl. (in) 0.396 @ 8' 9 1/2" 0.858 Passed (L/521) 1.0 D + 1.0 L (All Spans) TJ-ProT" Rating 42 40 Passed • Deflection criteria: LL (L/600) and TL (L/240). • Allowed moment does not reflect the adjustment for the beam stability factor. • A structural analysis of the deck has not been performed. • Deflection analysis is based on composite action with a single layer of 23/32" Weyerhaeuser EdgeT" Panel (24" Span Rating) that is glued and nailed down. • Additional considerations for the TJ-ProT" Rating include: None. Supports Bearing Length Loads to Supports (Ibs) Accessories Total Available Required Dead Floor Live Factored 1 - Stud wall - SPF 3.50" 2.25" 1.75" 141 469 610 1 1/4" Rim Board 2 - Stud wall - SPF 3.50" 2.25" 1.75" 141 469 610 1 1/4" Rim Board • Kim uoara is assumea m carry an ioaas appueo aireaiy aoove a, Dypassmg me memoer Deing aesigneo. Lateral Bracing Bracing Intervals Comments Top Edge (Lu) 4' 6" o/c Bottom Edge (Lu) 17' 5" o/c •TJI joists are only analyzed using Maximum Allowable bracing solutions. -Maximum allowable bracing intervals based on applied load. Vertical Load Location Spacing Dead (0.90) Floor Live (1.00) Comments 1 - Uniform (PSF) 0 to 17' 7" 16" 12.0 40.0 Default Load Member Notes J-1 System : Floor Member Type : Joist Building Use : Residential Building Code : IBC 2018 Design Methodology : ASD Weyerhaeuser Notes Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator ForteWEB Software Operator Job Notes Kaveh Aminian Aminian and Associates pllc (206) 310-2020 aminian@comcast.net 6/1/2023 9:38:03 PM UTC ForteWEB 0.5, Engine: V8.2.5.1, Data: V8.1.3.6 Weyerhaeuser File Name: Alshaibani Paget/7 aFORTEWEB' Level, Floor: Drop Beam 1 piece(s) 4 x 12 DF No.2 PASSED ■ I All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal. 0 Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (Ibs) 3583 @ 2" 7656 (3.50") Passed (47%) 1.0 D + 1.0 L (All Spans) Shear (Ibs) 2421 @ 1' 2 3/4" 4725 Passed (51%) 1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-Ibs) 6209 @ 3' 9 1/2" 6091 Passed (102%) 1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in) 0.064 @ 3' 9 1/2" 0.242 Passed (L/999+) 1.0 D + 1.0 L (All Spans) Total Load Defl. (in) 0.088 @ T 9 1/2" 0.363 Passed (L/984) 1.0 D + 1.0 L (All Spans) • Deflection criteria: LL (L/360) and TL (L/240). • Allowed moment does not reflect the adjustment for the beam stability factor. • Applicable calculations are based on NDS. Bearing Length Supports Im Available Required Loads to Supports (Ibs) Accessories Dead Floor Live Factored 1 - Column - DF 3.50" 3.50" F 1.64" 1005 2578 3583 Blocking 2 - Column - DF 3.50" 3.50" 1 1.64" 1005 2578 3583 Blocking • 151ocKing Panels are assumea to carry no ioaas appuea airectiy aoove mem ana the ruu ioaa is appuea to the memoer Deing aesignea. Lateral Bracing Bracing Intervals Comments Top Edge (Lu) 6" o/c Bottom Edge (Lu) 7' 7" o/c -Maximum allowable bracing intervals based on applied load. Vertical Loads ' Location (Side) Tributary Width Dead (0.90) Floor Live (1.00) Comments 0 - Self Weight (PLF) 0 to 7' 7" N/A 10.0 1 - Uniform (PSF) 0 to 7' 7" (Front) 17' 15.0 40.0 Default Load Member Notes Crawl Beam System : Floor Member Type : Drop Beam Building Use : Residential Building Code : IBC 2018 Design Methodology : ASD Weyerhaeuser Notes Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third -parry certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator ForteWEB Software Operator Job Notes Kaveh Aminian Aminian and Associates pllc (206) 310-2020 aminian@comcast.net 6/1/2023 9:38:03 PM UTC ForteWEB v3.5, Engine: V8.2.5.1, Data: V8.1.3.6 Weyerhaeuser File Name: Alshaibani Page 3/7 aFORTEWEB' MEMBER REPORT Level, Copy of Floor: Drop Beam option 1 piece(s) 3 1/2" x 9 1/2" 2.0E Parallam@ PSL OvErall Length: 3' 0 All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal. Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (Ibs) 3939 @ 2" 7656 (3.50") Passed (51%) 1.0 D + 1.0 L (All Spans) Shear (Ibs) 2945 @ 1' 1" 6428 Passed (46%) 1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-Ibs) 7809 @ 4' 3 1/2" 13057 Passed (60%) 1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in) 0.157 @ 4' 3 1/2" 0.275 Passed (L/631) 1.0 D + 1.0 L (All Spans) Total Load Defl. (in) 0.218 @ 4' 3 1/2" 0.412 Passed (L/453) 1.0 D + 1.0 L (All Spans) • Deflection criteria: LL (L/360) and TL (L/240). • Allowed moment does not reflect the adjustment for the beam stability factor. Supports Bearing Length Loads to Supports (Ibs) Accessories Total Available Required Dead Floor Live Factored 1 - Column - OF 3.50" 3.50" 1.80" 1107 2833 3939 Blocking 2 - Column - OF 3.50" 3.50" 1.80" 1107 2833 3939 Blocking • blocking Panels are assumed to carry no loads applied directly above them and the tull load Is applied to the member bung designed. Lateral Bracing Bracing Intervals Comments Top Edge (Lu) 8' 7" o/c Bottom Edge (Lu) 8' 7" o/c -Maximum allowable bracing intervals based on applied load. Vertical Loads Location (Side) Tributary Width Dead (0.90) Floor Live (1.00) Comments 0 - Self Weight (PLF) 0 to 8' 7" N/A 10.4 -- 1 - Uniform (PSF) 0 to 8' 7" (Front) 16' 6" 15.0 40.0 Default Load Member Notes Crawl Beam Option PASSED System : Floor Member Type : Drop Beam Building Use : Residential Building Code : IBC 2018 Design Methodology : ASD Weyerhaeuser Notes Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator ForteWEB Software Operator Job Notes Kaveh Aminian Aminian and Associates pllc (206) 310-2020 aminian@comcast.net 6/1/2023 9:38:03 PM LTC ForteWEB v3.5, Engine: V8.2.5.1, Data: V8.1.3.6 Weyerhaeuser File Name: Alshaibani Page 4 / 7 aFORTEWEB' Roof, Header 1 1 piece(s) 4 x 10 DF No.2 PASSED IV 0 All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal. Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (Ibs) 2463 @ 2" 5206 (3.50") Passed (47%) 1.0 D + 1.0 S (All Spans) Shear (Ibs) 1668 @ 1' 3/4" 4468 Passed (37%) 1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-Ibs) 3653 @ 3' 3 1/2" 5166 Passed (71%) 1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in) 0.046 @ 3' 3 1/2" 0.313 Passed (L/999+) 1.0 D + 1.0 S (All Spans) Total Load Defl. (in) 0.070 @ 3' 3 1/2" 0.417 Passed (L/999+) 1.0 D + 1.0 S (All Spans) • Deflection criteria: LL (L/240) and TL (L/180). • Allowed moment does not reflect the adjustment for the beam stability factor. • Applicable calculations are based on NDS. Bearing Length Supports Available Required Loads to Supports (Ibs) Accessories Dead Snow Factored 1 - Stud wall - SPF 3.50" 3.50" F 1.66" 817 1646 2463 Blocking 2 - Stud wall - SPF 3.50" 3.50" 1 1.66" 817 1646 2463 Blocking • 151ocKing Panels are assumea to carry no ioaas appuea airectiy aoove mem ana me ruu ioaa is appuea to me memoer Deing aesignea. Lateral Bracing Bracing Intervals Comments Top Edge (Lu) 6' 7" o/c Bottom Edge (Lu) 6' 7" o/c -Maximum allowable bracing intervals based on applied load. Vertical Loads ' Location (Side) Tributary Width Dead (0.90) Snow (1.15) Comments 0 - Self Weight (PLF) 0 to 6' 7" N/A 8.2 1 - Uniform (PSF) 0 to 6' 7" (Front) 20' 12.0 25.0 Default Load Member Notes Header 1 System : Roof Member Type : Drop Beam Building Use : Residential Building Code : IBC 2018 Design Methodology : ASD Member Pitch : 0/12 Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third -parry certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator ForteWEB Software Operator Job Notes Kaveh Aminian Aminian and Associates pllc (206) 310-2020 aminian@comcast.net 6/1/2023 9:38:03 PM UTC ForteWEB 0.5, Engine: V8.2.5.1, Data: V8.1.3.6 Weyerhaeuser File Name: Alshaibani Page 5/7 aFORTEWEB' Roof, RB-1 1 piece(s) 3 1/2" x 9 1/2" 2.0E Parallam@ PSL PASSED 0 All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal. Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (Ibs) 4345 @ 2" 5206 (3.50") Passed (83%) 1.0 D + 1.0 S (All Spans) Shear (Ibs) 3532 @ 1' 1" 7393 Passed (48%) 1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-Ibs) 9443 @ T 3" 15016 Passed (63%) 1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in) 0.100 @ 3' 3" 0.313 Passed (L/748) 1.0 D + 1.0 S (All Spans) Total Load Defl. (in) 0.149 @ 3' 3" 0.417 Passed (L/503) 1.0 D + 1.0 S (All Spans) • Deflection criteria: LL (L/240) and TL (L/180). • Allowed moment does not reflect the adjustment for the beam stability factor. Supports Bearing Length Loads to Supports (Ibs) Accessories Total Available Required Dead Snow Factored 1 - Stud wall - SPF 3.50" 3.50" 2.92" 1432 2912 4345 Blocking 2 - Stud wall - SPF 3.50" 3.50" 2.89" 1416 2879 4295 Blocking • Blocking Panels are assumed to carry no loads applied directly above them and the Tull load Is applied to the member bung designed. Lateral Bracing Bracing Intervals Comments Top Edge (Lu) 6' 7" o/c Bottom Edge (Lu) 6' 7" o/c -Maximum allowable bracing intervals based on applied load. Vertical Loads Location (Side) Tributary Width Dead (0.90) Snow (1.15) Comments 0 - Self Weight (PLF) 0 to 6' 7" N/A 10.4 1 - Uniform (PSF) 0 to 6' 7" (Front) 20' 12.0 25.0 Default Load 2 - Point (lb) 3' 3" (Front) N/A 1200 2500 Member Notes Beam support girder truss System : Roof Member Type : Drop Beam Building Use : Residential Building Code : IBC 2018 Design Methodology : ASD Member Pitch : 0/12 Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator ForteWEB Software Operator Job Notes Kaveh Aminian Aminian and Associates pllc (206) 310-2020 aminian@comcast.net 6/1/2023 9:38:03 PM UTC ForteWEB 0.5, Engine: V8.2.5.1, Data: V8.1.3.6 Weyerhaeuser File Name: Alshaibani Page 6/7 aFORTEWEB' Roof, RB-2 1 piece(s) 3 1/2" x 9 1/2" 2.0E Parallam@ PSL PASSED All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal. Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (Ibs) 4432 @ 2" 5206 (3.50") Passed (85%) 1.0 D + 1.0 S (All Spans) Shear (Ibs) 3620 @ 1' 1" 7393 Passed (49%) 1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-Ibs) 11333 @ 4' 3" 15016 Passed (75%) 1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in) 0.195 @ 4' 3" 0.412 Passed (L/508) 1.0 D + 1.0 S (All Spans) Total Load Defl. (in) 0.293 @ 4' 3" 0.550 Passed (L/338) 1.0 D + 1.0 S (All Spans) • Deflection criteria: LL (L/240) and TL (L/180). • Allowed moment does not reflect the adjustment for the beam stability factor. Supports Bearing Length Loads to Supports (Ibs) Accessories Total Available Required Dead Snow Factored 1 - Stud wall - SPF 3.50" 3.50" 2.98" 1479 2954 4432 Blocking 2 - Stud wall - SPF 3.50" 3.50" 2.96" 1470 2938 4408 Blocking • Blocking Panels are assumed to carry no loads appuea airectly aoove them and the tuii load is appuea to the memoer wing designed. Lateral Bracing Bracing Intervals Comments Top Edge (Lu) 8' 7" o/c Bottom Edge (Lu) 8' 7" o/c -Maximum allowable bracing intervals based on applied load. Vertical Loads Location (Side) Tributary Width Dead (0.90) Snow (1.15) Comments 0 - Self Weight (PLF) 0 to 8' 7" N/A 10.4 1 - Uniform (PSF) 0 to 8' 7" (Front) 20' 12.0 25.0 Default Load 2 - Point (lb) 4' 3" (Front) N/A 800 1600 Member Notes Beam support girder truss System : Roof Member Type : Drop Beam Building Use : Residential Building Code : IBC 2018 Design Methodology : ASD Member Pitch : 0/12 Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator ForteWEB Software Operator Job Notes Kaveh Aminian Aminian and Associates pllc (206) 310-2020 aminian@comcast.net 6/1/2023 9:38:03 PM UTC ForteWEB 0.5, Engine: V8.2.5.1, Data: V8.1.3.6 Weyerhaeuser File Name: Alshaibani Page 7/7 AMINIAN AND ASSOCIATES 206.3102020 JOB: Alshaibani By: Lateral Load Corn bination (ASD) 0.6D + 0.7E Seismic ASCE 7-16 Section 12.8 ELF Ss= 1.3 Fa= Si= 0.5 Fv= Sds=(2/3)Fa*Ss= 1.05 R(Wood Shear wall) 6.5 1 1 Cs= SDS/R/1= 0.16 V=pcs W= 8.0 Seismic Weights(PSF) Snow 20%>30 Roof(walls included) Floor(walls included) Seismic Load Distribution Date 0.6D + 0.7E(+/- )0.14pE 11-Jul Page: 1.2 1.5 Sd1=(2/3)*Fv*S1= 0.50 20 25 p= 1 Level Area(S.F.) W(K) h(ft) Wh pV.(wh/EWh)(K) 0.7E R 2500 50 12.5 625 8.0 5.6 0 0 0 0 0 0.0 0.0 E 50 V2 0.0 625 8.0 5.6 AMINIAN AND ASSOCIATES 206.3102020 JOB: Alshaibani Project Scope: Client: Address: Code: Loads: Live Loads Dead Loads Lateral By: KA New Single Family Alshaibani 7815 202 nd PI SW Edmond I BC 2018 Snow 25 psf Floor 40 psf Deck 60 psf Snow 25 psf Roof 12 psf Floor 15 psf ASCE 7-16 Risk Category= II Winds Speed: 98 MPH Load Combination(ASD) Seismic Ss = 1.3 Fa= 1.2 Fv= Load Combination Date: 7/2021 Light roof Typical finish 1= 1 Exposure: B 0.6D + 0.6W S1 = 0.5 SDC: D 1.5 ASCE 11.4 0.6D + 0.7pE 0.6D(+/-)1.4 Sds +0.7pE Soil Bearing: 1500 psf Assumed Page: 1 7/12/2021 U.S. Seismic Design Maps �GNEF s U®o CauFOa Alshaibani 7815 202nd PI SW, Edmonds, WA 98026, USA Latitude, Longitude: 47.8159491,-122.3395945 Healthy Gardens Q Landscape & Design Inc Fixao® QUnited Av Services 202nd PI SW J rn m � D D CAD Google 0 203rd St SW Date 7/12/2021, 9:53:56 AM Design Code Reference Document ASCE7-16 Risk Category II Site Class D - Default (See Section 11.4.3) Type Value Description Ss 1.292 MCER ground motion. (for 0.2 second period) St 0.456 MCER ground motion. (for 1.0s period) SMs 1.55 Site -modified spectral acceleration value SM1 null -See Section 11.4.8 Site -modified spectral acceleration value SDS 1.034 Numeric seismic design value at 0.2 second SA SD1 null -See Section 11.4.8 Numeric seismic design value at 1.0 second SA Type Value SDC null -See Section 11.4.8 Fa 1.2 F, null -See Section 11.4.8 PGA 0.551 FPGA 1.2 PGAM 0.662 TL 6 SsRT 1.292 SsUH 1.423 SsD 2.455 S1RT 0.456 S1UH 0.509 S 1 D 1.023 PGAd 0.866 CRS 0.908 OSHPD 201 st St SW Description Seismic design category Site amplification factor at 0.2 second Site amplification factor at 1.0 second MCEG peak ground acceleration Site amplification factor at PGA Site modified peak ground acceleration Long -period transition period in seconds Probabilistic risk -targeted ground motion. (0.2 second) Factored uniform -hazard (2% probability of exceedance in 50 years) spectral acceleration Factored deterministic acceleration value. (0.2 second) Probabilistic risk -targeted ground motion. (1.0 second) Factored uniform -hazard (2% probability of exceedance in 50 years) spectral acceleration. Factored deterministic acceleration value. (1.0 second) Factored deterministic acceleration value. (Peak Ground Acceleration) Mapped value of the risk coefficient at short periods 202nd St SW Map data 02021 https://seismicmaps.org 1/3 7/12/2021 U.S. Seismic Design Maps DISCLAIMER While the information presented on this website is believed to be correct, S.E.A.O.C. /OSHPD and its sponsors and contributors assume no responsibility or liability for its accuracy. The material presented in this web application should not be used or relied upon for any specific application without competent examination and verification of its accuracy, suitability and applicability by engineers or other licensed professionals. SEAOC / OSHPD do not intend that the use of this information replace the sound judgment of such competent professionals, having experience and knowledge in the field of practice, nor to substitute for the standard of care required of such professionals in interpreting and applying the results of the seismic data provided by this website. Users of the information from this website assume all liability arising from such use. Use of the output of this website does not imply approval by the governing building code bodies responsible for building code approval and interpretation for the building site described by latitude/longitude location in the search results of this website. https://seismicmaps.org 3/3 7/12/2021 U.S. Seismic Design Maps Type Value Description CRC 0.895 Mapped value of the risk coefficient at a period of 1 s https://seismicmaps.org 2/3 AMINIAN AND ASSOCIATES 206.3102020 JOB: Alshaibani By: KA Date: Page: LATERAL Load Comnination(ASD) 0.6 D + 0.6W Wind Method: ASCE7-16 Chapter 28.4 Method 2 V Basic Speed 98 MPH 1= 1 Exposure B Kzt 0 1 Roof Slope 4.5:12 Roof Mean Height : 13 5.2 (0.4x h) Eave Height: 9 �s Min.Horz Plan Dimension: 40 4 (0.1x Width) 2a 6' 6' Min T, wX= Prsessures(Table 28.5-1) Zone A 22 Zone C 14.6 Zone B 0 Zone D 0 Min. 16 PSF Zone E -19.1 Zone F -13.3 Zone G -13.3 VRoof mmm—� Zone H -10.1 Min. 8 PSF Vfloor 2 Vfloor 1 Perp. to Ridge N-S Hroof Hwall Zone D+B Zone B Zone C +A Zone A Total Min VRoof V Floor 2 V Floor 1 I 8 4.5 601 6 60 6 4342 8160 0 0 0 4.5 60 6 0 0 4341.6 8683 4320 12480 Parallel to Ridge E-W Hroof Hwall VRoof V Floor 2 V Floor 1 I Zone D+B Zone B Zone C+A Zone A Total Min 8 4.5 01 0 40 6 3028 2880 0 0 0 4.5 40 6 0 0 400 3028 2880 5760 JOB: Alshaibani Shear Walls AMINIAN AND ASSOCIATES 206.3102020 By: KA Date: ######## Seismic Governs E/W directions Wind Governs N/S Levels 0.7E 0.6W(N/S) 0.6W(E/W) Roof 5.6 k 7.5 k 3.5k end 0 0 0 Upper Floor Narrow Wall Reduction Values <2:1 Aspect Ratio SDWS 4.3.4.3 N-S E-W 0.7 E=VR= 5.6 Vr = 5.6/40= 0.140 k/ft Line 0 E(K) 2.8 W(PLF) 350 L(Ft)= 14 10 8 Total= 32 ve=E/L 88 88 SW1 vw= E/L T=C= vmax.L.h/L -608 # Holdown N/A Line 0 E(K) 2.8 W(PLF) 350 L(Ft) 3.5 6.75 3.5 Min Segment(Ft)= 3.5 ve=E/L 204 PLF 262 Adjusted SW2 vw= W/L T=C= vmax.L.h/L 1744 # Holdown STHD 14 0.6W=VR= Line A E(K) L(Ft) ve=E/L vw= W/L T=C= vmax.L.h/L 8 h(Ft) 7.5 Vr = 7.5/60= 0.125 k/ft 3.75 W(PLF) 100 38 Min Segment(Ft)= 38 99 SW1 -1012 # Holdown N/A h(Ft) h(Ft) Page: X1 E li AMINIAN AND ASSOCIATES 206.3102020 Line B E(K) 3.75 W(PLF) 100 L(Ft) 17 4 4 Min Segment(Ft)= 4 h(Ft) 9 ve=E/L 150 PLF SW1 vw= W/L T=C= vmax.L.h/L 1150 # Holdown N/A There are other walls ULCK ABUVL r--------------------------- I I I I I I LANDING ABOVE I I r 1 ----------40'-8„ I 1 I I I 16'-4" I I I I I I I I 17'-2" I CV O, 7'-3 112" 1 I I I I I — —— - — - — - — - — - — - — - — ---- ------------I----- o 1 I ---------- - -,--- — - — --,.— --- 00 -- - — - ''------------~ ----` I _ — _ — _ — _ — _ — _— _ _ _ — _ — _ — _ — _�___� _— _ _ — _ — _ — _ _ _ - _ — _ —� _ - — - — - — - — - - - - — _ — _ — _ _ _ — _ — _ — _ _ - - - -- — — — r/o - --_ — - — — - — - — — _ - - - -- _- - - - - — -_ = DBL. —____- - _ - _ i _ - - - _ — — - - L — — - — - — - — - — - 11718 TJI P R 0,210 — - — - — - — - — - — - — - — - — - — --J- --� @1 8"0. C. ? Y P. I — - --- -- --- — — — — — — — — o — ACCESS -----_I _—_------- — —�— — — — —�-- ----- — — — — --�_—_—___ — - — - — - — - — - — - — - — — 5'-6" �------- -- --- — — — -- — — — — — — — — — — — — _ --- --- ------ ---- --�9� — �I -- -- - ----------- ----- r -- — — --- --- I �-------, — - — - — - — - — —-------'--- 2� =F DBL. — — — — — — — — _ — —0-- — - — - — - — - — - — - — - — I I B N 1 — — -- - - - — _- �, — — — — — - - - - - - — II ------------ — — F — — -- — — — — 7,-0" --- --- ----- 1 ------- - — - — - - I xX DBL. -_— —_ — — --- — — — — — — DBL. - -- -- — - — — - — - — — - — I S4 I I, — — — — — - ------- — - — — - — — — ---�" - — - — - — - -----' — —— ---- f---o J —_I — —— — — — — —— — — — — — — e ---� — 11718 T J I P R 0, 210 ® 1 6 " 0. C. T Y P. I' is — ----------- Y — — ---------------- — — — — — — — — i < x I — - — - — - — - — - — - — ------------- — — — I — - — - — - - — - — — — -- ----------- — — — — — — -- I �---- I' — - — - — - — - — - — - — - — — — - — - — - - - — - — - — — — —I _ — — — — — �'8 I — - — - — - — - — ------ — --------'---------- r °o---------------- x — - — - — - — - — - — - — - ------ — — - —.- — - — - — - — - — -- --- - — - — - — - - — - — I I I. I' — -------- — -- — — — — — — — — — — — — --— — __ ------ io I iv----_----------- j -- 8'-3° in ----------------I 17'-2" 9'-2" -- 26'-4" 6•-8" 15'-2" _p' 12._4" CV FOUNDATION PLAN �- f 4-x 12 V,F42 ' Ec 1 u- ) 1 �IIIHEIR RBI T HEIR HDR BEAM 1 I I I I I II II I I I I I I I I I I I I l l l l I HDR I 4X4 _ NOTE 11 I I I I I 1 I I I 1 1 I I I I I 1 I 1 HEADERS LESS THAN 4' SPAN: 4X8 HEADERS MORE THAN 4' SPAN: 4X,O 'PSF+aw 11 1 1 1 1 I 1 I I I I 1 I 1 I 1 I 1 1 1 1 I 1 4X o 11 1 I 1 I I 1 1 I I 1 1 1 I I I I I I 11 I oll IRIDOEI 11 1 1 1 1 1 II I 11 11 I I I I I 1 1 I I 1 1 I 1 1 I I I I _—IIII IIIIIIIII (IIII IENIN�ER D IRUISSJS PIER MAUFCT� REIR II 1 1 I I 1 I II 1 1 1 1 I I III IJIJIII I I 1 1 --- IIIIIIIIIIIIIIIIIIIII 11 I 1 I I 1 I I I I 1 1 I I I I 1 I 1 1 1 1 II I I I I I I I I I HDR, ( I I I I 11 I I I 1 1 I I I 1 I I 1 I I 1 1 1 1 1 1 1 BEAM I I I I I I I I I I I I I I HDR—t-°--i HDR f I—°1—HDR RB I HDR I I I 1 I I I 4X4 a'x ROOF FRAMING PLAN • me on SHEAR WALL TABLE Type Material Nailing PL Nailing PI Nailing Anchor Top Bottom Bolts SW 1(1) 7/16" OSB or 8d @ 6" LTP4 at 20" 16d @ 8" 5/8" dia @ '/2" Plywd 48" SW2 7/16" OSB or 8d @ 3" LTP4 at 10" 16d @ 5" 5/8" dia @ '/2" Plywd 32" Specific notes; (1) All exterior shear walls not called out to be SW1 (2) Framing members, end studs, and plates to be min. 3x with nails staggered (3) 2-2x studs may be used in lieu of 3x with 16d at 24" staggered Notes apply to the entire Shear Wall table: • Intermediate framing member's nailing to be 12" o.c. • Nails(Common): 8d=0.131 "dia x2.5" 10d= 0.148" dia xY 16d= 0.162" dia x3.5" • Block all panel edges with min. 2x blocking. • Apply nailing to all studs, top and bottom plates and blocking • Framing to be 16" o.c. • Fasteners shall be driven flush with surface of sheathing nail and staggered at joints. • Anchor bolts to be embedded min. of 7" in concrete and to be located not more than 12" and not less than 4" from end of the wall(min. 2 A.B. per wall). Provide a hot dip galvanized 3 x3 x0.229" washer at each A.B; max '/2" from plate edge.. The hole in the plate washer may be diagonally slotted 13/16" x 1 3/4" provided a standard cut washer is placed between the plate washer and nut. Use 4.5"x 3" x0.229" at 2 sided walls • Nails shall not be spaced less than 3/8" from edge of sheathing • Pony walls to be constructed as walls above HOLDOWN TABLE Number Type Fastener to Studs Anchor Bolts 1 STHD14 (or HDU2) 22-10d(6-1/4 x2.5 5/8" Dia. With mi. STHD14RJ with SIDS) 1.75" edge dist. floor joists 2-2x studs w/ 10" embed in CIP concrete Notes: • Locate Holdown on each side of the shear wall • Stitch studs at each end with 10d Common at 6" staggered • Number of strap nailing is to above and below stud; not rim. • Refer to Manufacturer's catalog for proper installation • Minimum concrete strength is 2500 psi