Loading...
APPROVED BLD BLD2023-0174+SI FORM +11.6.2023_9.35.24_AM+3882413RECEIVED ,A 1cY4c][c1rc1 CITY OF EDMONDS DEVELOPMENT SEMI p DEPARTMEW :yt. 11Z(1ll SPECIAL INSPECTION AND TESTING AGREEMENT Permit Number: Project: BLD2023-0174 Raman, 1050 Walnut Street Prior to issuance of a permit, this form must be completed in its entirety and returitetl to the City for approval. The completeel form ntust have signatures of aeknowledgmeW by all parties DUTIES AND RESPONSIBILITIES Special InslRection Firm and S )eciial Ins ecitors The Special Inspection firm of 4W will perform special inspection for the foil firm is to be employed). owing types o work (separate forms must be submitted if more than one CK Soils to also include: tiv ■ Monitor and test structural fill placement and soil compaction Jos • Observe bearing capacity at foundation locations M0 • Observe slab -on -grade preparation Pv+ p''O/OW ice' a Verifj, infiltration system placement Wo " Monitor foundation drainage placement Nwf- J)t--ptilj--d v0 • Observe excavation stability -- rt,�,�r�j p ty'z PAY All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. if inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resuine ofthe inspector and firin must be submitted. The resume must show that the inspector and tiie firm are qualified by edification and experiellec to perfm•m the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall include: • A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the; contractor for resolution. • A weekly report shall be submitted to the City, detailing the inspections and testing performed, listing any nonconforining work and resolution of nonconforming items. i:c[I nitivM1nSCYfitiIlItiC1'I)f(IIMi(raliathl)C51:i1111tr)O\'OFANS ('011111101b I,etlers i(Il(I Spec1i11 illtil)L ia1n11 fof1115 2019ISpciaal iusllection fb n1s1S12933dN74 Rieman NEW SI'R.docx I r!fi/'p33 • A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. admsvr-uncrlti�.uu; rpnNti''zinkaulUcskdtpJJOP'U�+ANS Conunonl5 Latta, and spatial Inspection f llm 30IMSpecial Inspection IomtsSl 2023-0174 12am:m N N'Srltdocx 11/1121123