APPROVED ENG BLD2023-0174+Transportation_Impact_Form+4.19.2023_10.13.38_AM+3491851RECEIVED
Apr 24 2023 OF Eb4
CITY OF EDMOND� 1!
DEVELOPMENT SOEN ES
DEPARTMENY
PERMITTING & DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771.0220
BLD2023-0174 APPENDIX A
Page I of 2
Transportation Impact Analysis
Worksheet
Name of Proposed Project: Raman Project
Owner/Applicant
Ryner Homes
Name
4224 211 th Ave SE
Street/Mailing Address
Snohomish WA 98290
City
State zip
Applicant Contact Person:
Eric Ryner
Name
4224 211th Ave SE
Street/Mailing Address
Snohomish WA 98290
City State zip
Telephone: 425-328-0252 Telephone: 425-328-5617
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Firm Name
Telephone:
1. PROJECT DESCRIPTION
Contact Name
E-mail:
a. Location -Street address: 1050 Walnut ST
(Attach a vicinity map and site plan.)
b. Specify existing land use: SFR
c. Specify proposed type and size of development: 3400sf SRF
(# of residential units and/or square footage of building)
d. Date construction will begin and be completed: 2023-2024
e. Define proposed access locations: Existing
HANDOUT UPDATED 03.24.2021
APPENDIX A
Page 2 of 2
f. Define proposed sight distance at site egress locations:
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC
18.82.130.
❑ CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used.
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
of , etc.
New Use $ X
Prior Use $ X
New Use Fee: $ - Prior Use Fee: $ _ $ 1
❑ NEW DEVELOPMENT
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
of , etc.
New Use $ X =
X NO CHANGE
❑ INDEPENDENT FEE CALCULATION
MITIGATION FEE RECOMMENDATION:
$
INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee)
$
TOTAL TRANSPORTATION IMPACT FEE
$
City of Edmonds, Engineering Division Approval
6/30/2023
Date
' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
HANDOUT UPDATED 03.24.2021