Loading...
REV1 APPROVED BLD2021-0756+Mechanical_Plan+5.18.2023_1.09.59_PM+3554364r u i c ) 1 M4.1 3 M4.0 HVAC GENERAL NOTES: G1. CONTRACTOR TO COORDINATE ALL EQUIPMENT LOCATIONS AND ROOF PENETRATIONS WITHIN THE SCOPE OF THIS PROJECT. PLUMBING VENTS, REGULATORS VENTS, FLUES, AND EXHAUST AIR OUTLETS TO BE KEPT A MINIMUM OF 10' AWAY FROM OUTSIDE AIR INTAKE LOCATIONS. G2. ALL SUPPLY, RETURN, AND OUTSIDE AIR DUCT TO BE INSULATED PER 2015 WSEC. 1 2 3 4 5 6 7 8 9 10 12 13 G3. CONDUIT AND J-BOXES SHALL BE PROVIDED BY THE ELECTRICAL CONTRACTOR, THERMOSTATS AND WIRING SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR. G4. RESIDENTIAL RANGE HOODS SHALL BE LISTED AND LABELED RECIRCULATION HOODS AND SHALL NOT EXHAUST TO EXTERIOR UNDER 2015 IMC SECTION 501.3, EXCEPTION #3. RESIDENT SUITE HVAC UNITS UTILIZE MECHANICAL VENTILATION. SEE VTAC SCHEDULE ON M5.0 FOR DETAIL. 11 g 4 10 M4.0 M4.0 M4.0 M4.0 5 0 I D L 3 ,3 u J D 1 HVAC PLAN - 2ND FLOOR SCALE: 1/8" = V-0" --F 0 HVAC KEYNOTES: 1. 14"x14" OSA FROM LOWER LEVEL UP TO ROOF. 2. 26"x18" OSA UP AND DOWN IN MECHANICAL SHAFT. SEE UPPER AND LOWER HVAC PLANS FOR CONTINUATION. 3. 14"x16" EA DUCT UP AND DOWN IN MECHANICAL SHAFT. SEE UPPER AND LOWER HVAC PLANS FOR CONTINUATION. 4. 26"x16" OSA UP AND DOWN IN MECHANICAL SHAFT. SEE UPPER AND LOWER HVAC PLANS FOR CONTINUATION. 5. PROVIDE FIRE/SMOKE DAMPER AT ALL SHAFT WALL/RATED WALL PENETRATIONS WITH ACCESS. 6. MECHANICAL CHASE FOR UNIT VENTING UP TO ROOF. SEE M4.0 FOR ENLARGED PLAN. 7. MOUNT RADIANT HEATERS ON THE BOTTOM OF CANOPY STRUCTURE AT A 45 DEGREE ANGLE. MAINTAIN MANUFACTURER'S CLEARANCES TO COMBUSTABLE MATERIALS. COORDINATE EXACT LOCATIONS WITH CANOPY STRUCTURAL MEMBERS. 8. PROVIDE LOUVER L-4 FOR SMOKE CONTROL RELIEF ON THE ALTERNATE RECALL LEVEL 2. PROVIDE A CLASS 1 MOTORIZED DAMPER, FED WITH STANDBY POWER FROM THE GENERATOR, WITH OPEN/CLOSE INDICATOR SWITCHES FOR FIRE ALARM . MONITORING. DAMPER SHALL FAIL OPEN. ' <O pF WASI// r-b . 41741 <C/ S� 0 DER����� N L 05/17/2023 38 NORTHWEST DAVIS, SUITE 300 PORTLAND, OR 97209 503.245.7100 1505 5TH AVE, SUITE 300 SEATTLE, WA 98101 206.576.1600 1014 HOWARD STREET SAN FRANCISCO, CA 94103 415.252.7063 © ANKROM MOISAN ARCHITECTS, INC. DC ENGINEERING Careful listening. Dynamic solutions. www.drengineerinq.net Phone:208.288.2181 Project:21 AMA01 REVISED PLAN APPROVED CITY OF EDMONDS BUILDING DIVISION Erg BUILDING OFFICIAL May 31 2023 APPROVED DATE N CD DD a7 0 0 Zz 0= < 0 W C 0 L,L O 0 0 O > > J Q J 0 C O 0 I- CD LL] m Z N U Q QLU N U a REVISION DATE REASON FOR ISSUE 1 6-18-2021 ADDENDUM 1 A 08-20-21 CITY COMMENTS #01 C 02-08-22 CITY COMMENTS #03 12-30-22 CCD 003 F 05-12/23 SMOKE CONTROL REVISIONS-ASI 009 REVISION Mar 02 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2021-0756 HVAC PLAN - SECOND FLOOR CONSTRUCTION SET DATE PROJECT NUMBER 05.21.21 184470 SHEET NUMBER M2.2 r U c 1 2 3 4 5 6 7 8 9 10 12 13 I I I I I I I I I I I I I I I I I I 0 1 HVAC PLAN - ROOF SCALE: 1/8" = 1'-0" HVAC GENERAL NOTES: G1. CONTRACTOR TO COORDINATE ALL EQUIPMENT LOCATIONS AND ROOF PENETRATIONS WITHIN THE SCOPE OF THIS PROJECT. PLUMBING VENTS, REGULATORS VENTS, FLUES, AND EXHAUST AIR OUTLETS TO BE KEPT A MINIMUM OF 10' AWAY FROM OUTSIDE AIR INTAKE LOCATIONS. G2. ALL SUPPLY, RETURN, AND OUTSIDE AIR DUCT TO BE INSULATED PER 2015 WSEC. G3. CONDUIT AND J-BOXES SHALL BE PROVIDED BY THE ELECTRICAL CONTRACTOR, THERMOSTATS AND WIRING SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR. G4. RESIDENTIAL RANGE HOODS SHALL BE LISTED AND LABELED RECIRCULATION HOODS AND SHALL NOT EXHAUST TO EXTERIOR UNDER 2015 IMC SECTION 501.3, EXCEPTION #3. RESIDENT SUITE HVAC UNITS UTILIZE MECHANICAL VENTILATION. SEE VTAC SCHEDULE ON M5.0 FOR DETAIL. HVAC KEYNOTES: 1. ROUTE DUCT DOWN THROUGH ROOF INTO STAIRWAY. SEAL PENETRATION WEATHER TIGHT. 2. ROUTE DUCT DOWN THROUGH ROOF INTO MECHANICAL CHASE. SEE LOWER FLOORS FOR CONTINUATION. 3. EXHAUST DUCT ROOF PENETRATION. SEE LOWER FLOOR FOR CONTINUATION. 4. PROVIDE 24"x24" CLASS 1 MOTORIZED DAMPER PER WSEC C403.2.4.3. BASIS OF DESIGN TO BE GREENHECK VCD-23 WITH OPTIONAL OCI SWITCH FOR MONITORING DAMPER POSITION. 5. ACTUATOR SHALL BE 120V, AND FAIL OPEN. PROVIDE 36"x36" CLASS 1 MOTORIZED DAMPER PER WSEC TIONAL OCI SWITCH FOR MONITORING DAMPER POSITION. ACTUATOR SHALL BE 120V, AND FAIL OPEN. �O of wA,3 r-b' 41741 �<C/ '[STER��� \� ASS/0NAL NC� 05/17/2023 38 NORTHWEST DAVIS, SUITE 300 PORTLAND, OR 97209 503.245.7100 1505 5TH AVE, SUITE 300 SEATTLE, WA 98101 206.576.1600 1014 HOWARD STREET SAN FRANCISCO, CA 94103 415.252.7063 © ANKROM MOISAN ARCHITECTS, INC. DC ENGINEERING Careful listening. Dynamic solutions. www.drengineerinq.net Phone:208.288.2181 Project:21 AMA01 REVISED PLAN APPROVED CITY OF EDMONDS BUILDING DIVISION Eri & BUILDING OFFICIAL May 31 2023 APPROVED DATE N CD DD M 0 0 Zz 0= >Q 0 W C 0 LL 0 0 0 Z O ; > J Q J 0 C O 0 0 CD LL m CD*� Z N U Q QLU N U a REVISION DATE REASON FOR ISSUE 1 6-18-2021 ADDENDUM 1 A 08-20-21 CITY COMMENTS #01 F 05-12/23 SMOKE CONTROL REVISIONS-ASI 009 REVISION Mar 02 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2021-0756 HVAC PLAN - ROOF CONSTRUCTION SET DATE PROJECT NUMBER 05.21.21 184470 SHEET NUMBER M2.7 C C, 0 C C C r u I a J D 0 DUCTLESS SPLIT HEAT PUMP SCHEDULE EQUIPMENT NO. SERVICE NOMINAL CAPACITY TOTAL COOL/HEAT (MBH) MAX CFM SEER/HSPF INDOOR UNIT OUTDOOR UNIT NOTES MCA MANUFACTURER MODEL WEIGHT VOLT.-PH.-CY. MCA MOCP MANUFACTURER MODEL WEIGHT DSO/DSI-1 MAINTENANCE 0008 1 TON 12.0 / 13.6 400 26.1 / 12.5 1.0 MITSUBISHI MSZ-FH12NA 29 LBS 208V-1PH-60 11 20 MITSUBISHI MUZ-FH12NHA 83 LBS 1,2,3,4,5,6,7 DSO/DSI-2 LAUNDRY 0004 1.5 TON 17.2 / 20.3 460 21.0 / 12.0 1.0 MITSUBISHI MSZ-FH18NA2 29 LBS 208V-1PH-60 16 20 MITSUBISHI MUZ-FH18NHA 124 LBS 1,2,3,4,5,6,7 DSO/DSI-3 MDF 0003 1 TON 12.0 / 13.6 400 26.1 / 12.5 1.0 MITSUBISHI MSZ-FH12NA 29 LBS 208V-1PH-60 11 20 MITSUBISHI MUZ-FH12NHA 83 LBS 1,2,3,4,5,6,7 DSO/DSI-4 ELECTRICAL 0002 1.5 TON 17.2 / 20.3 460 21.0 / 12.0 1.0 MITSUBISHI MSZ-FH18NA2 29 LBS 208V-1PH-60 16 20 MITSUBISHI MUZ-FH18NHA 124 LBS 1,2,3,4,5,6,7 ALTERNATE MANUFACTURERS: DAIKIN, FUJITSU, MITSUBISHI, SANYO NOTES: 1. PROVIDE UNIT WITH 7 DAY PROGRAMMABLE THERMOSTAT. 2. PROVIDE ALL ANCILLARY COMPONENTS REQUIRED FOR A FULL INSTALLATION. 3. INDOOR UNIT IS ELECTRICALLY CONNECTED TO AND POWERED BY THE OUTDOOR UNIT. ELECTRICAL REQUIREMENTS ARE COMBINED. 4. CAPACITIES ARE RATED AT ARI STANDARDS. 5. ELECTRICAL CONTRACTOR TO PROVIDE DISCONNECT SWITCHES AND POWER WIRING. 6. PROVIDE MANUFACTURER'S CONDENSATE PUMP KIT AND ROUTE TO NEAREST LAVATORY/SINK TAILPIECE. 7. PROVIDE REFRIGERANT AND REFRIGERANT PIPING PER MANUFACTURER FOR FIELD CONDITIONS. FAN SCHEDULE EQUIPMENT NO. SERVES TYPE - MOUNTING CFM STATIC PRESS. (IN.WC.) MOTOR HEATING WATTS SONES WEIGHT MANUFACTURER MODEL CONTROL NOTES WATTS HP RPM VOLT.-PH.-CY. DBF-1 LAUNDRY - DRYER BOOSTER EXHAUST - DUCT 170 - 72 - - 120-1-60 - - - FANTECH DB4XT-705 PRESSURE SENSOR SWITCH 5 EF-1 UNIT RESTROOMS EXHAUST - CEILING 80 0.10 11.7 - 750 120-1-60 1300 1.5 20 LBS DELTA BREEZE DELTA RAD80 DUAL (LIGHT/HEAT) WALL SWITCH 1,2 EF-2 BOILER 0005 EXHAUST - CEILING 200 0.10 17.5 - - 120-1-60 - 1.0 15 LBS DELTA BREEZE PR0200 THERMOSTAT EF-3 LAUNDRY 0004 EXHAUST - CEILING 100 0.10 12.6 - - 120-1-60 - 1.5 15 LBS DELTA BREEZE GBR100H WALL SWITCH WITH HUMIDISTAT EF-4 PUBLIC RESTROOMS EXHAUST - CEILING 80 0.10 10.5 - - 120-1-60 - 0.8 15 LBS DELTA BREEZE GBR80 VIA LIGHTING SCHEDULE EF-5 TRASH ROOMS/STORAGE EXHAUST - CEILING 80 0.10 10.5 - - 120-1-60 - 0.8 15 LBS DELTA BREEZE GBR80 CONTINUOUS EF-6 SALON EXHAUST - ROOF 290 0.20 - 1/30 1550 120-1-60 - 4.9 50 LBS GREENHECK CUE-070-D VIA LIGHTING SCHEDULE EF-7 FITNESS EXHAUST - CEILING 300 0.10 41 - - 120-1-60 - 2.0 15 LBS DELTA BREEZE PR0300 VIA LIGHTING SCHEDULE EF-8 RESTROOM 1005 EXHAUST - CEILING 150 0.15 17.5 - - 120-1-60 - 1.0 15 LBS DELTA BREEZE PR0200 VIA LIGHTING SCHEDULE EF-G1 GENERATOR ROOM EXHAUST - SIDEWALL 4800 0.10 - 3/4 - 120-1-60 - 17.4 - GREENHECK SE1-18-429-A7X-QD GENERATOR CONTROL EF-K1 COM. KITCHEN HOOD TYPE I - SIDEWALL 4200 1.0 - 3 1434 208-3-60 - 24 200 LBS CAPTIVEAIRE DU180HFA KITCHEN HOOD 7,8 EF-K2 COM. KITCHEN HOOD TYPE II - SIDEWALL 400 0.5 - 0.25 1493 208-1-60 - 9.1 54 LBS CAPTIVEAIRE DU12HFA DISHWASHER HOOD EF-P1 MECH 0009 EXHAUST - FLOOR 16,000 / 10,700 0.25 - 5.63 720 208-3-60 - 80 850 LBS GREENHECK QEID-27-95 CONTINUOUS/SENSORS 6,8 EF-P2 MECH 1032 EXHAUST - FLOOR 12,000 / 8,000 0.25 - 5 1475 208-3-60 - 83 850 LBS GREENHECK QEID-22-80 CONTINUOUS/SENSORS 6,8 EF-P3 PARKING GARAGE CIRCULATION - CEILING 2100 - - - - 208-1-60 - - - GREENHECK GJI CONTINUOUS 3.OA MCA, 15A MOP EPF-1 ELEVATOR PRESSURIZATION - ROOF 11,500 0.75 - 3 - 208-3-60 - 500 LBS REVERSOMATIC RDD-33 FIRE ALARM NOTE 8, 9,10, 29 DEGREE BLADE ANGLE SPF-1 WEST STAIRWAY PRESSURIZATION - ROOF 5,000 0.5 - 1 - 208-3-60 - 450 LBS REVERSOMATIC RDD-24 FIRE ALARM NOTE 9, 10, 13 DEGREE BLADE ANGLE SPF-2 EAST STAIRWAY PRESSURIZATION - ROOF 5,000 0.5 - 1 - 208-3-60 - 450 LBS REVERSOMATIC RDD-24 FIRE ALARM NOTE 9, 10, 13 DEGREE BLADE ANGLE NOTES: 1. CONTRACTOR TO COORDINATE WITH ELECTRICAL CONTRACTOR FOR ALL CONTROLS. 2. SINGLE BLOWER VENTILATOR SHALL BE CEILING MOUNTED. FURNISH WITH CEILING GRILLE, AND BACKDRAFT DAMPER. 3. FAN SHALL BE CONTROLLED BY WALL THERMOSTAT, PROVIDED BY MECHANICAL CONTRACTOR, INSTALLED AND WIRED BY ELECTRICAL CONTRACTOR. 4. FURNISH WITH BACKDRAFT DAMPER. 5. MOUNT IN DESIGNATED AREA ABOVE DRYER. PROVIDE WITH ACCESS, BRACKET, AND HARDWARE. 6. PROVIDE WITH CO AND NO2 SENSOR EQUIPMENT AND ALL NECESSARY ACCESSORIES. 7. GREASE EXHAUST FAN SHALL BE INSTALLED TO PROVIDE 18" MINIMUM TO COMBUSTABLE MATERIALS. 8. FANS EXCEDING 1.0 HP SHALL HAVE AN ENERGY EFFICIENCY CLASSIFICATION OF MORE THAN FEG 71 PER AMCA 205, AND FAN OPERATION SHALL BE WITHIN 9. PROVIDE VARIABLE FREQUENCY DRIVE WITH FAN. BASIS OF DESIGN - DANFOSS VLT. 10. PROVIDE GREENHECK VCD-23 WITH 120V FAIL OPEN ACTUATOR AND OCI SWITCH. MAKE-UP AIR UNIT SCHEDULE (BY KES) SUPPLY FAN DIRECT GAS FIRED HEATING DX COOLING ELECTRICAL T.S.P. TOTAL SENSIBLE EQUIPMENT OUTSIDE (IN. FAN INPUT OUTPUT CAPACITY CAPACITY WEIGHT NO. SERVICE LOCATION AIR (CFM) CFM W.C.) RPM HP MBH 225 MBH EFF. % (MBH) 47.5 (MBH) 47.4 E.A.T./L.A.T. SEER VOLT.-PH.-CY. FLA MCA MOCP (LBS) MANUFACTURER MODEL NOTES MAU-1 KITCHEN HOOD ROOF 3360 3360 1.0 1604 3 206.7 92 80 / 66 14 208-3-60 9.5 44.4 60 1567 CAPTIVEAIRE A2-D250-20D-MPU 1, 2, 3, 4, 5, 6, 7,8 ALTERNATE MANUFACTURERS: LENNOX, TRANE, YORK, CARRIER NOTES: 1. UNIT CAPACITIES RATED AT 100 FEET ELEVATION AND 85 DEGREES CONDENSER ENTERING AIR. 2. PROVIDE UNIT WITH FACTORY MOUNTED DISCONNECT AND GFI SERVICE OUTLET. 3. PROVIDE PREFABRICATED 14" ROOF CURB. 4. PROVIDE WITH SEISMIC CLIP. 5. PROVIDE UNIT WITH SPRING ISOLATORS. 6. PROVIDE UNIT WITH FACTORY SMOKE DETECTOR, FEILD INSTALLED. 7. FANS EXCEDING 1.0 HP SHALL HAVE AN ENERGY EFFICIENCY CLASSIFICATION OF MORE THAN FEG 71 PER AMCA 205, AND FAN OPERATION SHALL BE WITHIN 10% OF THE LISTED EFFICENY, IN COMPLIANCE WITH WSEC SECTION C406.2.3 ENERGY RECOVERY VENTILATOR SCHEDULE SUPPLY FAN EXHAUST FAN ENERGY RECOVERY ELECTRICAL SUMMER WINTER EQUIPMENT T.S.P.(IN. FAN T.S.P. (IN. FAN SUMMER WINTER ENTHALPY ENTHALPY NO. SERVICE LOCATION CFM W.C.) RPM HP CFM W.C.) RPM HP EAT/LAT EAT/LAT RECOVERY RECOVERY SONES VOLT.-PH.-CY. FLA MCA MOCP WEIGHT MANUFACTURER MODEL NOTES ERV-1 FC OSA / CORRIDOR EA ROOF 1050 1 0.75 1 1100 0.75 950 1 0.75 1140 1 0.75 85 / 77.8 23 / 51.8 67.5 54.6 13.2 208V-PH1-60 12.2 15 GREENHECK ECV-10H-VG-FM NOTES: 1. UNIT CONFIGURED TO SUPPLY 100% OSA. VERTICAL PACKAGED TERMINAL HEAT PUMP SCHEDULE EQUIPMENT SENSIBLE COOLING NO. SERVICE SUPPLY CFM MIN. OSA CFM ESP (IN. W.C.) MBH EER HEATING MBH COP ELEC. HEAT (kW) VOLT-PH-CY MCP MCA WEIGHT MANUFACTURER MODEL NOTES VTAC-1 STUDIO UNIT 490 60 0.3 9.0 11.5 8.2 4.0 2.1 208V-1PH-60 15 15 145 AMANA AVH093H VTAC-2 1-BEDROOM 490 60 0.3 11.0 11.5 10.5 4.0 2.8 208V-1PH-60 20 19.9 150 AMANA AVH123H VTAC-3 2-BEDROOM 675 60 0.3 18.0 11.5 16.5 4.0 4.1 208V-1PH-60 30 28.6 190 AMANA AVH183H NOTES: 1. PROVIDE WITH MERV-6 FILTER OR BETTER. 2. PROVIDE WITH ARCHITECTURAL LOUVER, ACCESS PANEL/RETURN AIR GRILLE, AND ACCESSORY DRAIN PAN/KIT. DEDICATED OUTSIDE AIR SUPPLY UNIT SCHEDULE SENS COOLING OUTSIDE AIR HEATING ELECTRICAL EQUIPMENT NOMINAL CAPACITY MIN / MAX ENTERING AIR CAPACITY E.S.P. NO. SERVICE CAPACITY (MBH) CFM SEER/IEER DB/WB (MBH) (IN W.C.) MCA MOCP VOLT/PH/CY WEIGHT MANUFACTURER MODEL NOTES DOAS-1 CORRIDOR OSA 12 TONS 1 160.8 2200 / 4800 418.1 18.1 80/61.3 133 0.5 88.5 A 100 A 208V-3PH-60 3851 LBS CAPTIVEAIRE CASRTU4 1,2 NOTES: 1. UNIT CONFIGURED TO SUPPLY 100% OSA. 2. FANS EXCEDING 1.0 HP SHALL HAVE AN ENERGY EFFICIENCY CLASSIFICATION OF MORE THAN FEG 71 PER AMCA 205, AND FAN OPERATION SHALL BE WITHIN 10% OF THE LISTED EFFICENY, IN COMPLIANCE WITH WSEC SECTION C406.2.3 ROOFTOP UNIT SCHEDULE EQUIPMENT NO. SERVICE TONS SUPPLY AIR (CFM) OUTSIDE AIR (CFM) E.S.P. (IN. W.C.) COOLING ENTERING AIR SENSIBLE EER/SEER REFRIGERANT DB/WB MBH HEATING ELECTRICAL WEIGHT (LBS) MANUFACTURER MODEL OPTIONS MBH INPUT MBH OUTPUT AFUE % VOLT/PH/CYC MCA MOCP POWER EXH. MCA MOCP RTU-1 FITNESS 3 1200 305 0.5 416.1 16.1 R-41 OA 80 / 61 24.5 79.2 64.2 81 % 208/3/60 27 30 1.5 15 700 CARRIER 48GCEM04 1,2,3,4,5,6,7,8 RTU-2 THEATER 3 1200 270 0.5 416.1 16.1 R-41 OA 80 / 61 24.5 79.2 64.2 81 % 208/3/60 27 30 1.5 15 T 700 CARRIER 48GCEM04 1,2,3,4,5,6,7,8 ALTERNATE MANUFACTURERS: LENNOX, TRANE, BRYANT, YORK, CARRIER, LUXAIRE. NOTES: 1. UNIT CAPACITIES RATED AT 600 FEET ELEVATION AND 80 DEGREES CONDENSER ENTERING AIR. 2. PROVIDE UNIT WITH FACTORY MOUNTED DISCONNECT AND GFI SERVICE OUTLET. 3. PROVIDE PREFABRICATED 14" ROOF CURB. 4. PROVIDE ECONOMIZER WITH FULL MODULATING POWER EXHAUST AND HIGH LIMIT SHUT OFF CONTROL PER WSEC C403.3.3.3. 5. PROVIDE 7-DAY PROGRAMMABLE THERMOSTAT. 6. PROVIDE WITH SEISMIC CLIP. 7. PROVIDE UNIT WITH ALL CONTROLS AND SENSORS REQUIRED FOR ON DEMAND VENTILATION. 8. PROVIDE UNIT WITH FACTORY SMOKE DETECTOR, FIELD INSTALLED. NOTE: MECHANICAL EQUIPMENT SHALL EXCEDE THE WSEC EFFICIENCIES ON TABLES C403.2.3(1) THROUGH C403.2.3(9) BY 15% TO UTILIZE THE HIGH EFFICIENCY HVAC OPTION. AIR DISTRIBUTION DEVICES EQUIPMENT NO. SIZE MOUNTING MATERIAL MANUFACTUR ER MODEL NOTES FACE NECK SIDEWALL LAY -IN CEILING HARD CEILING DUCT FLOOR STEEL ALUMINUM SD-1 12"x12" SEE PLANS X X X TITUS TMS SD-2 24"x24" SEE PLANS X X X TITUS TMS SG-1 10"x6" SEE PLANS X X TITUS US30OFS SG-2 10"x6" SEE PLANS X X X TITUS US350FS RG-1 12"x12" SEE PLANS X X X TITUS 50F RG-2 24"x24" SEE PLANS X X X TITUS 50F TG-1 14"x10' SEE PLANS X X X X X TITUS TITUS US350FS 50F TG-2 24"x24" SEE PLANS EG-1 24"x24" SEE PLANS X X X TITUS 5OF ALTERNATE MANUFACTURERS: TITUS, PRICE, METAL-AIRE, NAILOR, CARNES, TUTTLE & BAILEY NOTES: 1. CONTRACTOR TO VERIFY AND PROVIDE ALL MOUNTING HARDWARE FOR APPLICABLE CEILING TYPES. 2. FINISH TO BE COORDINATED WITH ARCHITECT PRIOR TO SUBMITTAL. 3. NC VALUES NOT TO EXCEED 25. 4. NECK SIZE REFERS TO THE DUCT SIZE CONNECTION AT THE DIFFUSER OR GRILLE. 5. CONTRACTOR PROVIDED FACE DAMPER WHEN IN -LINE DUCT DAMPER IS NOT ACCESSIBLE. 6. CONTRACTOR TO PROVIDE TRANSITIONS FROM LEAD-IN DUCT SIZE TO NECK SIZE AS REQUIRED. ELECTRIC WALL HEATER SCHEDULE EQUIPMENT NO. KEY: �_— (A), (B) (C) A. FIRST LETTER: S-SUPPLY, R-RETURN, E-EXHAUST, T- TRANSFER SECOND LETTER: D-DIFFUSER, R-REGISTER, G-GRILLE B. DUCT NECK SIZE, UNLESS NOTED OTHERWISE C. CFM EQUIPMENT ELECTRIC NO. SERVICE CFM WATTS RPM MCA VOLT.-PH.-CY. WEIGHT MANUFACTURER MODEL NOTES EWH-1 SEE PLANS 100 750 1060 6.3 120V-1 PH-60 10 LBS MARKEL E3055T2DWB EWH-2 STAIRWAYS 100 1500 1060 12.5 120V-1 PH-60 10 LBS MARKEL E3055T2DWB ALTERNATE MANUFACTURERS: NOTES: 1. COORDINATE MOUNTING LOCATION WITH ALL OTHER DISCIPLINES. LOUVER SCHEDULE EQUIPMENT THICKNESS NO. SERVICE WIDTH HEIGHT FREE AREA (SQ. FT.) OF FRAME MATERIAL SCREEN MANUFACTURER MODEL NOTES L-1 L-2 FC-1C, FC-1D, FC-1E INTAKE 46" 28" 4.4 6" GALVANIZED STEEL MESH GREENHECK VCD-23 2000 CFM INTAKE, CLASS 1 MOTORIZED DAMPER. 1ST FLOOR RELIEF 46" 28" 4.5 6" GALVANIZED STEEL MESH GREENHECK VCD-23 3600 CFM RELIEF, CLASS 1 MOTORIZED DAMPER I E L H N C C- 3 0 F R I C S 1 O R AM R L-4 FIRE ALARM 50" 72" 12 6" ALUMINUM MESH GREENHECK ECD-601 4 L-P1 PARKING EXHAUST RELIEF 42" 42" 6.0 6" ALUMINUM MESH RUSKIN CD355 1 L-R1 UNIT EXHAUST MANIFOLD 12" 11" - 5" POLY MESH XVENT MDEB-44-BR 1 L-R2 UNIT EXHAUST MANIFOLD 16" 12" - 5" POLY MESH XVENT THEB-444-BR 1 RL-1 TRASH CHUTE PENTHOUSE VENT 24" 16" - - ALUMINUM MESH GREENHECK WRH 3 ALTERNATE MANUFACTURERS: GREENHECK, RUSKIN, CESCO, L & D NOTES: 1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. 2. PROVIDE WITH RUSKIN MOTORIZED ACTUATOR, CONTROLLED TO OPEN WHEN EF-G1 IS ENERGIZED. 4. SMOKE CONTROL RELIEF DAMPER. PROVIDE CLASS 1 MOTORIZED DAMPER, RUSKIN CBD2 BACKDRAFT DAMPER, AND STANDBY POWER FROM GENERATOR. UNIT HEATER SCHEDULE EQUIPMENT NO. MANUFACTURER MODEL FUEL INPUT EFFICIENCY AIRFLOW (CFM) VOLT/PH/CY MCA MOCP WEIGHT NOTES UH-1 MODINE HHD-30 NATURAL GAS 30.0 MBH 82% 500 120V-1PH-60 - - 55 LBS RH-1,2,3,4 GREAT LAKES RADIANT BAH-35-C-17 ELECTRIC 1750 WATTS - - 240V-1 PH-60 7.0 A 15 A 13 LBS CCD 003 FAN COIL SCHEDULE EXTERNAL HEATING COIL COOLING COIL ELECTRICAL EQUIPMENT AREA SUPPLY OUTSIDE STATIC PRESS NO. SERVED AIR (CFM) AIR (CFM) (IN. W.G.) MBH INPUT KW MBH REFRIG. VOLT.-PH.-CY. MCA MOP WEIGHT MANUFACTURER MODEL NOTES FC-1A BISTRO 1600 570 0.24 54.2 650 48.1 R410A 208V-1PH-60 3.1 15 110 LG ARNU483M3A4 1, 2, 3, 4, 5, 6, 7, 9 FC-1 B OFFICES 1200 240 0.24 40.6 450 36.2 R410A 208V-1 PH-60 2.9 15 100 LG ARNU363M3A4 1, 2, 3, 4, 5, 6, 9 FC-1C DINING 1600 450 0.24 54.2 650 48.1 R41OA 208V-1PH-60 3.1 15 110 LG ARNU483M3A4 1, 2, 3, 4, 5, 6, 7, 8, 9 FC-1D DINING 1600 450 0.24 54.2 650 48.1 R410A 208V-1PH-60 3.1 15 110 LG ARNU483M3A4 1, 2, 3, 4, 5, 6, 7, 8, 9 FC-1E FAMILY RM 400 75 0.24 13.6 190 12.3 R410A 208V-1PH-60 2.0 15 67 LG ARNU123M3A4 1, 2, 3, 4, 5, 6, 8, 9 FC-1 F KITCHEN 1200 0 0.24 40.6 450 36.2 R410A 208V-1 PH-60 2.9 15 100 LG ARNU363M3A4 1, 2, 3, 4, 5, 6, 9 FC-2 2ND FLOOR 800 325 0.24 27.3 190 24.2 R410A 208V-1PH-60 2.0 15 70 LG ARNU243M3A4 1, 2, 3, 4, 5, 6, 9 FC-3 3RD FLOOR 800 325 0.24 27.3 190 24.2 R410A 208V-1 PH-60 2.0 15 70 LG ARNU243M3A4 1, 2, 3, 4, 5, 6, 9 FC-4 4TH FLOOR 800 325 0.24 27.3 190 24.2 R410A 208V-1 PH-60 2.0 15 70 LG ARNU243M3A4 1, 2, 3, 4, 5, 6, 9 FC-5 5TH FLOOR 800 325 0.24 27.3 190 24.2 R410A 208V-1 PH-60 2.0 15 70 LG ARNU243M3A4 1, 2, 3, 4, 5, 6, 9 FC-6A SALON 400 270 0.24 13.6 190 12.3 R410A 208V-1PH-60 2.0 15 67 LG ARNU123M3A4 1, 2, 3, 4, 5, 6, 9 FC-613 6TH FLOOR 800 255 0.24 27.3 190 24.2 R410A 208V-1 PH-60 2.0 15 70 LG ARNU243M3A4 1, 2, 3, 4, 5, 6, 9 ALTERNATE MANUFACTURERS: LENNOX, TRANE, YORK NOTES- 1 . PROVIDE UNIT WITH 7 DAY PROGRAMMABLE THERMOSTAT. 2. PROVIDE ALL ANCILLARY COMPONENTS REQUIRED FOR A FULL INSTALLATION. 3. PROVIDE WITH MEDIA FILTER. 4. ELECTRICAL CONTRACTOR TO PROVIDE DISCONNECT SWITCHES AND POWER WIRING. 5. PROVIDE MANUFACTURER'S CONDENSATE PUMP KIT AND ROUTE TO NEAREST LAVATORY/SINK TAILPIECE. 6. PROVIDE MANUFACTURER'S LOW AMBIENT KIT FOR OPERATION DOWN TO 0°F. 7. PROVIDE ALL CONTROLS AND SENSORS REQUIRED FOR DEMAND CONTROL VENTILATION. 8. PROVIDE FAN COIL WITH MOTORIZED DAMPERS FOR ECONOMIZER OPERATION, WITH HIGH LIMIT SHUT-OFF CONTROL PER WSEC C403.3.3.3. 9. PROVIDE UNIT WITH MANUFACTURER DRIP PAN AD SECONDARY DRAINAGE. HEAT PUMP SCHEDULE EQUIPMENT NO. CORRESPONDING UNIT TOTAL COOLING CAPACITY (MBH) TOTAL HEATING CAPACITY (MBH) SEER/EER HSPF ELECTRICAL SOUND dB MANUFACTURER MODEL WEIGHT NOTES VOLT./PH/CY. MCA MOCP HP-1A FC-1A 50 56.5 17 9.5 208V-1PH-60 30 50 51 LG ARUN048GSS4 207 1, 2, 3, 4, 5, 6 HP-1 B FC-1 B 39.5 44 17 9.0 208V-1 PH-60 25 40 50 LG ARUN036GSS4 160 1, 2, 3, 4, 5, 6 HPA C FC-1 C 50 56.5 17 9.5 208V-1 PH-60 30 50 51 LG ARUN048GSS4 207 1, 2, 3, 4, 5, 6 HP-1 D FC-1 D 50 56.5 17 9.5 208V-1 PH-60 30 50 51 LG ARUN048GSS4 207 1, 2, 3, 4, 5, 6 HP-1 E FC-1 E 24 27 15.8 8.6 208V-1 PH-60 20 30 50 LG ARUN024GSS4 160 1, 2, 3, 4, 5, 6 HP-1 F FICA F 39.5 44 17 9.0 208V-1 PH-60 25 40 50 LG ARUN036GSS4 160 1, 2, 3, 4, 5, 6 HP-2 FC-2 24 27 15.8 8.6 208V-1PH-60 20 30 50 LG ARUN024GSS4 160 1, 2, 3, 4, 5, 6 HP-3 FC-3 24 27 15.8 8.6 208V-1PH-60 20 30 50 LG ARUN024GSS4 160 1, 2, 3, 4, 5, 6 HP-4 FC-4 24 27 15.8 8.6 208V-1PH-60 20 30 50 LG ARUN024GSS4 160 1, 2, 3, 4, 5, 6 HP-5 FC-5 24 27 15.8 8.6 208V-1PH-60 20 30 50 LG ARUN024GSS4 160 1, 2, 3, 4, 5, 6 HP-6A FC-6A 24 27 15.8 8.6 208V-1PH-60 20 30 50 LG ARUN024GSS4 160 1, 2, 3, 4, 5, 6 HP-6B FC-6B 24 27 15.8 8.6 208V-1PH-60 20 30 50 LG ARUN024GSS4 160 1, 2, 3, 4, 5, 6 ALTERNATE MANUFACTURERS: LENNOX, TRANE, YORK NOTES: 1. PROVIDE ALL ANCILLARY COMPONENTS REQUIRED FOR A FULL INSTALLATION. 2. INDOOR UNIT IS ELECTRICALLY CONNECTED TO AND POWERED BY THE OUTDOOR UNIT. ELECTRICAL REQUIREMENTS ARE COMBINED. 3. CAPACITIES ARE RATED AT ARI STANDARDS. 4. ELECTRICAL CONTRACTOR TO PROVIDE DISCONNECT SWITCHES AND POWER WIRING. 5. PROVIDE REFRIGERANT AND REFRIGERANT PIPING PER MANUFACTURER FOR FIELD CONDITIONS. 6. PROVIDE MANUFACTURER'S LOW AMBIENT KIT FOR OPERATION DOWN TO 0°F. �O of wA,3 r-b' 41741 �<C/ �Z'rISTER�� \� AS8/0NAL EN 05/17/2023 38 NORTHWEST DAVIS, SUITE 300 PORTLAND, OR 97209 503.245.7100 1505 5TH AVE, SUITE 300 SEATTLE, WA 98101 206.576.1600 1014 HOWARD STREET SAN FRANCISCO, CA 94103 415.252.7063 © ANKROM MOISAN ARCHITECTS, INC. DC ENGINEERING Careful listening. Dynamic solutions. www.d(engineerinq.net Phone:208.288.2181 Project:21 AMA01 REVISED PLAN APPROVED CITY OF EDMONDS BUILDING DIVISION Eri & BUILDING OFFICIAL May 31 2023 APPROVED DATE N CD DD M 0 0 Z z 0 = >Q 0 W C 0 LL O 0 0 0 Z O � > J Q J _� 0 C� C O CV 0 F_ CD LLl m o Z N U LU Q Q N U a REVISION DATE REASON FOR ISSUE E 03-07-22 CITY COMMENTS #05 14 06-27-22 RFI#53 19 08-29-22 RFI#131 12-30-22 CCD 003 F 05-12/23 SMOKE CONTROL REVISIONS-ASI 009 REVISION Mar 02 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2021-0756 HVAC SCHEDULES CONSTRUCTION SET DATE PROJECT NUMBER 05.21.21 184470 SHEET NUMBER M5.0