Loading...
REV1 BLD2021-0756+DESCRIPTION +5.18.2023_1.10.13_PM+3554366Jr DC ENGINEERING Careful listening. Dynamic solutions. May 11, 2023 Anthology of Edmonds Narrative of changes for ASI 009 — Smoke Control Revisions LTA :rd!FAIV►11r4Ya1 Sheet M2.2 - HVAC Plan — Second Floor 440 E. Corporate Dr., Suite 103, Meridian, ID 83642 www.dcengineering.net A. Louver L-4 was added to the plan sheet along with Keynote #8 which describes louver requirements. Sheet M2.7 — HVAC Plan - Roof A. Duct size was added to the SPF-1 and SPF-2 stair pressurization fans. B. Duct size was added to the EPF-1 elevator pressurization fan. C. Keynotes 4 and 5 were revised to show updated damper size and requirements. Sheet M5.00 - HVAC Schedules A. Revised the Fan Schedule for updated EPF-1, SPF-1, and SPF-2 models and notes. B. Revised the Louver Schedule for added L-4 louver and notes. DC Engineering correspondence Page 1 of 1