May 11, 2023
Anthology of Edmonds
Narrative of changes for ASI 009 — Smoke Control Revisions
LTA :rd!FAIV►11r4Ya1
Sheet M2.2 - HVAC Plan — Second Floor
440 E. Corporate Dr., Suite 103,
Meridian, ID 83642
www.dcengineering.net
A. Louver L-4 was added to the plan sheet along with Keynote #8 which describes
louver requirements.
Sheet M2.7 — HVAC Plan - Roof
A. Duct size was added to the SPF-1 and SPF-2 stair pressurization fans.
B. Duct size was added to the EPF-1 elevator pressurization fan.
C. Keynotes 4 and 5 were revised to show updated damper size and requirements.
Sheet M5.00 - HVAC Schedules
A. Revised the Fan Schedule for updated EPF-1, SPF-1, and SPF-2 models and notes.
B. Revised the Louver Schedule for added L-4 louver and notes.
DC Engineering correspondence Page 1 of 1