REVIEWED RESUB4 BLD2021-0756+Energy_Calculations+2.9.2022_4.45.08_PM+2672382MECHANICAL COMPLIANCE SUMMARY
2015 WSEC Compliance Forms for Commercial Buildings including Group R2, R3 & R4 over 3 stories and all Rl Administered by: (02022 NEEA, All rights reserved
Project & Applicant
Information
Project Title
Anthology of Edmonds - 2015 WSEC
For Building Department Use: I Date: Feb 09, 2022
Project Address
21200 72nd Ave W
Edmonds, WA 98026
Applicant Name
Aaron Prough
Applicant Phone
208493-0027
Applicant Email
aprough@dcengineering.net
For questions about this report, contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com
General Occupancy
All Group R - R2, R3 & R4 over 3 stories and all Rl
General Building Use Type
Multifamily/Residential
Building Cond. Floor Area
164,000
General Project Types
New Building
New Building
or Addition
Mechanical Scope
Single Zone Systems & Equipment
Multiple Zone Systems & Equipment
Alteration
Mechanical Scope
Project Cond. Floor Area
164,000
Floors Above Grade
6
Compliance Method
Compliance Method 1 - General
Mechanical Project Description
This will be a 7 story assisted living facility with 1 floor of parking below grade.
Project Type
Mechanical Scope
Economizer
Exceptions)
BOAS Ventilation
Higher Equipment
Equipment Efficiency
Mechanical Compliance
Applied?
Provided?
Efficiency Option Applied?
y P PP
Compliance Verification
p
Scope and Method
New Building
Single Zone Systems & Equipment
No
No
Yes
COMPLIES
New Building
Multiple Zone Systems & Equipment
No
Yes
Yes
COMPLIES
Additional Efficiency
Credits Included (AEC)
Higher equipment efficiency and fan FEG
Dedicated outside air system (DOAS) option
Does building include occupancy classifications requiring DOAS?
Yes
Does project include DOAS equipment?
Yes
Based on project scope do TSPR requirements apply?
No
Do all systems comply with Appendix D standard reference design or qualify for an exception to TSPR?
No
Scope & Sp
- SINGLE ZONE SYSTEMS & EQUIPMENT
Compliance Verification
COMPLIES
Scope & Space Conditioning
NEW BUILDING - MULTIPLE ZONE SYSTEMS & EQUIPMENT
Compliance Verification
COMPLIES
RESUB
BLD2021-0756 Feb 10 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT