Loading...
REVIEWED RESUB1 BLD2024-0891+BLD APPLICANT RESPONSE+8.26.2024_8.23.22_AM+4461507AAA BLD2024-0891 RES U B Ankrom Moisan Aug 26 2024 August 23, 2024 CITY OFEDMONDS DEVELOPMENT SERVICES REVIEWED Eric Carter DEPARTMENT BY City of Edmonds - Building Division CITY OF EDMONDS 121 5th Avenue North Edmonds, WA 98020-3145 Re: Anthology of Edmonds - BLD-2024-0891 Dear Mr. Carter, The following is in response to your generator permit review comments dated July 31, 2024. For clarity we have included your comments in black font; our response to comments indicated in bold italic typeface. 1. Comment: The provided plan set or main building permit does not appear to have any notes or mark ups from the FOR pertaining to the concrete slab being designed to accommodate the weight of the equipment or attachment to the slab. Please provide documentation from the EOR. Response: Generator concrete slab was review and approved by the city under the main building permit BLD2021-0088. The documents were originally clouded under ASI 002, and approved by the city on 0712912022. 2. Comment: The provided plans do not appear to indicate how the equipment will be accessed for service. Please indicate service access locations and dimensions on the plans. Response: See revised mechanical sheet M2.1 for updated graphic showing the rollup door opening. Note that Architectural and structural drawings incorporated 13' wide x 12' tall rollup door #1031 in the ASI 002 revisions. These revisions were reviewed in the main building permit BLD2021-0088. The documents were originally clouded under ASI 002, and approved by the city on 0712912022. The image below is provided to add clarity, it is from the previously mentioned approval. I I rye` I ARCHITECTURE 01 12'-2" S Q INTERIORS A3.13 Q 1 002 URBAN DESIGN I B4.1 I o l BRANDING f^� Ankrom Moisan Architects — v m CLR 0 PORTLAND v GENERATOR 38 NW Davis street 1031 Suite 300 Portland, OR 97209 503.245.7100 SEATTLE 1505 5th Avenue Suite 300 Seattle, WA 98101 206.576.1600 Alt Ankrom Moisan 3. Comment: Please clarify and add notations to the plans in regard to the detail bugs for room 1031/ Generator. These details may show on other plan sets but also need to be labeled on this set as well. Response: Detail bugs have been removed from drawings as they are not part of the generator review scope. See updated mechanical sheet M2.1. 4. Comment: The provided plan set does not appear to indicate the location of the exhaust outlets(s) for the generator. As part of a complete plan, provide the location and height above grade and operable openings of the building. Response: A 42'x60- exhaust louver has been added to the east elevation of the building. This outlet will be ducted to the generator radiator exhaust flange. The generator combustion exhaust is also noted. See updated mechanical sheet M2.1 and M5.0 for updated mechanical design. The mechanical louver has been located on the architectural drawings to aid in constructability, see updated details 11A2.01 and 2/A3.11 for size and location of exterior louver,• note these have been clouded under delta RFI 489. 5. Comment: The generator will need combustion air to operate. Please note location of supply air. Response: A 48'x60" intake louver has been added to the south elevation of the building. This louver has been size to allow enough air to enter the generator room for both combustion air and air for cooling the generator radiator. See updated mechanical sheets M2.1 and M5.0 for updated mechanical design. The mechanical louver has been located on the architectural drawings to aid in constructability, see updated details 11A2.01 and 1/A3.12 for size and location of louver,• note these have been clouded under delta RFI 489. Sincerely, ARCHITECTURE Ankrom Moisan Architects, Inc. INTERIORS URBAN DESIGN BRANDING Richard Grimes Associate Anthology of Edmonds // 08.23.2024 2 ANKROM MOISAN